HousePrecheckCheck an address

840 Military TrlToronto · zoning, lot size and permit records

≈ 185.1 × 109.6 m12,395 m²on Military Trl

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 3 development applications open within 300 m, up to 13 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N50 m
≈ 185.1 m frontage≈ 109.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Zoning review26 266813 LPRNot Started
    Nov 6, 2026 · 840 MILITARY TRL

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
12,395 m²
Frontage
185.1 mestimated, irregular lot
Depth
109.6 mestimated, irregular lot
Street
Military Trl
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    12

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit the construction of a 26-storey (plus mezzanine and mechanical penthouse) building with retail at grade and 246 residential units. Cross Reference Zoning By-law Amendment 21 110357 ESC 24 OZ and Site Plan Control Application 21 110357 ESC 24 OZ. NOTE: This Revised Public Hearing Notice provides a more detailed description of the project to include the mezzanine and mechanical penthouse levels of the proposed building.

      3070 ELLESMERE RD · Jun 2, 2022 · 468 m away
    • Minor varianceApproved

      To permit building retrofits including: exterior envelope work, interior common/amenity space accessibility upgrades and renovations, exterior accessibility upgrades to circulation routes, drop-off and parking, mechanical and electrical systems upgrades.

      90 MORNELLE CRT · Jan 13, 2022 · 307 m away
    • Minor varianceApproved

      The purpose of this minor variance application is to obtain a temporary reduction in the number of required parking spaces for the University of Toronto, Scarborough Campus (UTSC).

      1050 MILITARY TRL · Mar 11, 2021 · 203 m away
    • Minor varianceApproved

      This application is for a proposal to develop the site with a 26-storey residential condominium building with 339 residential suites and commercial uses at grade.

      3070 ELLESMERE RD · Dec 11, 2014 · 468 m away
    • Minor varianceApproved

      The 12 storey apartment building currently has 165 residential units. The applicant is proposing to convert the existing basement lockers/storage space into 9 new residential units. A new recreation room is also proposed in the basement.

      750 MORNINGSIDE AVE · Nov 20, 2014 · 212 m away

    Latest activity nearby

    • Zoning review

      Not Started

      840 MILITARY TRL · Nov 6, 2026 · 30 m away
    • Zoning review

      Not Started

      40 PAN AM DR · Nov 3, 2026 · 138 m away
    • Zoning review

      Not Started

      1050 MILITARY TRL · Oct 28, 2026 · 203 m away
    • Building permit

      To erect and display two illuminated wall sign***POPEYES ****

      790 MILITARY TRL · Oct 23, 2026 · 232 m away
    • Building permit

      Install electromagnetic locking devices (maglocks) on 4-double doors separating the new Academy Room from the Male and Female Change Rooms (two new double doors and two existing doors)

      875 MORNINGSIDE AVE · Oct 8, 2026 · 212 m away
    • Building permit

      Demolition of existing change room interior walls and renovation of the area to accommodate new squad rack and fitness area - Panam Sports Centre

      875 MORNINGSIDE AVE · Sep 3, 2026 · 212 m away
    • Building permit

      2 ground signs.***UNIVERSITY OF TORONTO***

      1050 MILITARY TRL · Sep 1, 2026 · 203 m away
    • Zoning review

      Closed

      790 MILITARY TRL · Aug 25, 2026 · 232 m away
    • Building permit

      4 Wall Signs + 1 Ground Sign (UNIVERSITY OF TORONTO SCARBOROUGH)** RETAIL AND PARKING COMMONS -- BOOKSTORE -- UTSC RETAIL AND PARKING COMMONS **

      1050 MILITARY TRL · Jul 29, 2026 · 203 m away
    • Zoning review

      Closed

      790 MILITARY TRL · Jul 20, 2026 · 232 m away

    Neighbourhood: Highland Creek

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Military Trail at Morningside Ave1 min walk
    Nearest cycling route
    The MeadowayMulti-Use Trail, 10 min walk
    Nearest traffic count
    12,939 vehicles in 8 hMorningside Ave / Military Trl, 120 m away, Dec 10, 2023
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Bonspiel Park7 min walk
    Morningside Park8 min walk
    Ellesmere Ravine Park9 min walk

    Schools within 1 km

    • MILITARY TRAIL PUBLIC SCHOOL English Public 6 min walk
    • CENTENNIAL COLLEGE SCHOOL - MORNINGSIDE CAMPUS College 6 min walk
    • ST JOHN PAUL II CATHOLIC SECONDARY SCHOOL English Separate 9 min walk
    • ROUGE VALLEY EDUCATION CENTRE Private 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHighland CreekMedian neighbourhood
    Median household income (2020)$120,000$84,500
    Households that own their home86%54%
    Population (2021)12,62516,813
    Homes built in 1960 or before9%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHighland CreekCity median
    Assault575.6636.3
    Robbery44.369.5
    Homicide7.45.3
    Shootings7.410.5
    Auto theft243.5192.6
    Theft over $5,00095.946.1
    Break and enter118.1172.8
    Theft from vehicles214188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.