HousePrecheckCheck an address

831 Kennedy RdToronto · zoning, lot size and permit records

Residential apartment · RA (au67.0) (x710)40.7 × 81.2 m3,274 m²on Kennedy Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 50 rental units, built 1954More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 93 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Kennedy (Subway)The City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
40.7 m frontage81.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 109210 PRS 00 IR (Property Standards, 2026); 25 269997 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Rental building evaluation: 93 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (6 storeys, 50 units, built 1954).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 109210 PRS 00 IRClosed

    Property Standards

    Jan 26, 2026 · 831 KENNEDY RD
  • By-law investigation25 269997 PRS 00 IRClosed

    Property Standards

    Dec 27, 2025 · 831 KENNEDY RD
  • Building permit22 167756Closed

    Railing replacement and minor balcony repairs

    Nov 28, 2022 · 831 KENNEDY RD
  • Building permit15 254370Closed

    Proposal to install a 2" DCVA backflow prevention device in existing apartment building.

    Dec 17, 2015 · 831 KENNEDY RD
  • Building permit13 128622Closed

    Fire alarm system upgrade for audibility and main panel replacement in existing building. (6 Storey apartment building)

    Jul 22, 2013 · 831 KENNEDY RD

Check before you build

  • Site-specific exception 900.7.10(710)

    Needs a closer look

    6 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(710)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line that abuts Kennedy Rd. is 27 metres, measured from the original centreline of the street

  2. Rule B

    The minimum building setback from a lot line that does not abut a street is a distance equal half the height of the building

  3. Rule C

    The minimum separation between the above ground main walls of two buildings on the same lot is a distance equal to half the combined total height of the two buildings

  4. Rule D

    A maximum of 50 percent of the interior floor area of the first floor may be used for dwelling units .

  5. Rule E

    The maximum lot coverage is 30%

  6. Rule F

    A minimum 1.5 metre wide strip of land used for soft landscaping must be located along the entire part of a lot line that abuts a lot in the Residential Zone category.

By-law 569-2013, Chapter 900

Lot facts

Area
3,274 m²
Frontage
40.7 m
Depth
81.2 m
Street
Kennedy Rd
Corner lot
No
Public lane
None
House footprint
927 m²roof up to 24.2 m
Back yard
14.4 mhouse to rear lot line
Side yards
7.7 m and 10.5 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Kennedy (Subway). The lot is inside the Kennedy (Subway) Major Transit Station Area approved by the Province (Site and Area Specific Policy 647). Source
  • Zone RA (au67.0) (x710) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
100%10 of 10 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
1
Development applications
0

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 6-storey apartment building by converting existing garage and storage space to create 5 additional dwelling units located on the ground floor, third floor, fourth floor and sixth floor.

    819 KENNEDY RD · Dec 3, 2025 · 151 m away
  • Minor varianceApproved

    To add vehicle and bicycle parking spaces with exterior alterations to the landscape. To convert existing storage, laundry and parking to residential suites with interior alterations.

    806 KENNEDY RD · Dec 8, 2021 · 275 m away

Latest activity nearby

  • Building permitsecondary suite

    Proposed second unit in the basement with one new window

    15 BONNY LYNN CRT · Nov 4, 2026 · 252 m away
  • Zoning review

    Under Review

    843 KENNEDY RD · Nov 3, 2026 · 113 m away
  • Building permit

    Proposal for a concrete retaining wall.

    807 KENNEDY RD · Oct 28, 2026 · 260 m away
  • Building permit

    INSTALL BACK WATER VALVE

    45 MIDHOLM DR · Oct 28, 2026 · 170 m away
  • Zoning review

    Notice Sent

    812 KENNEDY RD · Sep 29, 2026 · 224 m away
  • Building permitgarden suite

    Alteration of existing storage with addition of new two storey garden suite in the backyard.

    65 TREVERTON DR · Sep 15, 2026 · 295 m away
  • Building permit

    Proposal to legalize as built garage canopy.

    32 MOORECROFT CRES · Sep 14, 2026 · 190 m away
  • Minor varianceApproved

    To maintain the existing south side yard carport. This application was previously deferred at the May 6, 2026 hearing.

    32 MOORECROFT CRES · Aug 12, 2026 · 190 m away
  • Building permit

    Revision 01: Revision to permit, sprinkler work permitProposal for interior alterations/additions to create five units (basement and ground floor).

    807 KENNEDY RD · Aug 6, 2026 · 260 m away
  • Zoning review

    Closed

    57 OAKWORTH CRES · Jul 28, 2026 · 207 m away

Neighbourhood: Ionview

About the area around the lot, not the lot itself.

Nearest station
Kennedy Station9 min walk
Nearest TTC stop
Kennedy Rd at Landseer Rd South Side2 min walk
Nearest cycling route
Gatineau Hydro Corridor TrlMulti-Use Trail, 5 min walk
Nearest traffic count
10,545 vehicles in 8 hKennedy Rd / Landseer Rd, 80 m away, Dec 18, 2019
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Treverton Park1 min walk
Mooregate Park8 min walk
Ionview Park9 min walk

Schools within 1 km

  • A PLUS ACADEMY OF ADVANCEMENT Private 7 min walk
  • IONVIEW PUBLIC SCHOOL English Public 8 min walk
  • SALAHEDDIN ISLAMIC SCHOOL Private 10 min walk
  • ST MARIA GORETTI CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • LORD ROBERTS JR PUBLIC SCHOOL English Public 12 min walk
  • ST JOAN OF ARC CATHOLIC ACADEMY English Separate 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureIonviewMedian neighbourhood
Median household income (2020)$74,500$84,500
Households that own their home39%54%
Population (2021)13,36516,813
Homes built in 1960 or before40%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleIonviewCity median
Assault813.8636.3
Robbery91.269.5
Homicide75.3
Shootings710.5
Auto theft140.3192.6
Theft over $5,00042.146.1
Break and enter91.2172.8
Theft from vehicles203.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.