HousePrecheckCheck an address

830 Passmore AveToronto · zoning, lot size and permit records

Employment · E 0.782.9 × 266.4 m21,910 m²on Passmore Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
82.9 m frontage266.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    4 records on file: more than at 88% of Toronto houses (median 0).

    • By-law investigation25 176877 WST 00 IRClosed

      Waste

      Jun 13, 2025 · 830 PASSMORE AVE
    • Building permit99 201611Closed

      SEPTIC TANK

      May 23, 2001 · 830 PASSMORE AVE
    • Building permit99 201592Closednew building

      CONCRETE PLANT

      May 22, 2001 · 830 PASSMORE AVE
    • Building permit98 200510Closed

      SPRAY BOOTH Mech S/O Feb 3/99

      Aug 14, 1998 · 830 PASSMORE AVE

    Lot facts

    Area
    21,910 m²
    Frontage
    82.9 m
    Depth
    266.4 m
    Street
    Passmore Ave
    Corner lot
    No
    Public lane
    None
    House footprint
    3,982 m²roof up to 9.9 m
    Back yard
    108.8 mhouse to rear lot line
    Side yards
    5.8 m and 31.6 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone E 0.7 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
    • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: lilac, japanese (8 cm), pear chanticleer (8 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%3 of 3 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permitnew building

      REV 02: Removal of demising wall and plumbing revisions.REV 01: Mezzanine removal, washroom relocation, and foundations revisions. Proposal to construct a new 1 storey industrial warehouse shell building with 4 units - Passworks Business Centre. Convenience address is 3260 Markham Rd.See also 22 231697 ZAP and 22 109914 ESC 23 SA

      3250 MARKHAM RD · Oct 19, 2026 · 295 m away
    • Building permitnew building

      REV03: Revision to shell for the removal of demising walls.REVISION - new fire protection consultant and new sprinkler drawingsProposal to construct a new 1 storey industrial warehouse shell building with 11 units - Passworks Business CentreSee also 22 231697 ZAP and 22 109914 ESC 23 SA

      3250 MARKHAM RD · Oct 15, 2026 · 295 m away
    • Building permit

      1 ground sign**MARQUEE BY BEEDIE**

      3250 MARKHAM RD · Oct 7, 2026 · 295 m away
    • Building permit

      INSTALL 1 FIRST PARTY WALL SIGN **WL STONE INC**

      3115 MARKHAM RD · Sep 29, 2026 · 214 m away
    • Building permit

      To erect and display one projecting sign.***MARQUEE***

      3250 MARKHAM RD · Sep 4, 2026 · 295 m away
    • Building permit

      2 Wall Sign****NAILS 68****

      3115 MARKHAM RD · Jun 8, 2026 · 214 m away
    • Building permit

      Revision 02: Revision to permit to increase total occupant load to 24 people, refer to cover letter

      825 PASSMORE AVE · Jun 2, 2026 · 189 m away
    • Building permit

      2 wall signs**NAILS 68**

      3115 MARKHAM RD · May 26, 2026 · 214 m away
    • Building permit

      2 Wall Sign****NAILS 68****

      3115 MARKHAM RD · May 13, 2026 · 214 m away
    • Building permit

      2 Wall Sign

      3115 MARKHAM RD · Apr 23, 2026 · 214 m away

    Neighbourhood: Morningside Heights

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Tapscott Rd at Select Ave2 min walk
    Nearest cycling route
    Steeles Ave EBike Lane, 8 min walk
    Nearest traffic count
    9,196 vehicles in 14 hTapscott Rd / Select Ave, 190 m away, Apr 16, 2025
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Trca Lands ( 21)14 min walk
    Hummingbird Park15 min walk

    Schools within 1 km

    • MIRAJ ACADEMY Private 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMorningside HeightsMedian neighbourhood
    Median household income (2020)$117,000$84,500
    Households that own their home84%54%
    Population (2021)24,94016,813
    Homes built in 1960 or before1%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMorningside HeightsCity median
    Assault486.1636.3
    Robbery138.469.5
    Shootings18.710.5
    Auto theft362.7192.6
    Theft over $5,00067.346.1
    Break and enter149.6172.8
    Theft from vehicles243.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.