HousePrecheckCheck an address

829 Birchmount RdToronto · zoning, lot size and permit records

Residential apartment · RA (au17.0) (x448)32.6 × 115.1 m3,750 m²on Birchmount Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 65 rental units, built 1961More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 4 development applications open within 300 m, up to 42 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 237493 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 90 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: IonviewThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
32.6 m frontage115.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 237493 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 42 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 90 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (6 storeys, 65 units, built 1961).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • By-law investigation26 237493 PRS 00 IRRescheduled

    Property Standards

    Sep 14, 2026 · 829 BIRCHMOUNT RD
  • Building permit00 141886Closed

    BALCONY RAILING REPLACEMENT 20 BALCONIES @ 28', 5 BALCONIES @ 20'. 25 BALCONY SLAB REPAIRS

    May 30, 2000 · 829 BIRCHMOUNT RD

Check before you build

  • Site-specific exception 900.7.10(448)

    Needs a closer look

    5 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(448)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line that abuts: (i) Eglinton Ave. is 36.0 metres, measured from the original centreline of the street ; and (ii) Birchmount Rd. is 25.0 metres, measured from the original centreline of the street

  2. Rule B

    The minimum building setback from a side lot line is a distance equal to half the height of the building

  3. Rule C

    The maximum lot coverage is 25%

  4. Rule D

    A maximum of 50% of the interior floor area of the first floor may be used for dwelling units

  5. Rule E

    The elevation of the basement floor must be a minimum of 3.5 metres higher than the invert of Massey Creek.

By-law 569-2013, Chapter 900

Lot facts

Area
3,750 m²
Frontage
32.6 m
Depth
115.1 m
Street
Birchmount Rd
Corner lot
No
Public lane
None
House footprint
957 m²roof up to 22.8 m
Back yard
43.3 mhouse to rear lot line
Side yards
5.2 m and 8.5 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Ionview. The lot is inside the Ionview Major Transit Station Area approved by the Province (Site and Area Specific Policy 664). Source
  • Zone RA (au17.0) (x448) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
6

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    The applicant is proposing to convert the existing storage room and laundry room into a new dwelling unit within the existing 9 storey apartment building. A new laundry room will be provided on the ground floor.

    739 BIRCHMOUNT RD · Jul 16, 2015 · 478 m away

Latest activity nearby

  • Building permit

    Addition of 1 maglock on the fist floor and addition of 2 maglocks on the second floor.

    888 BIRCHMOUNT RD · Oct 30, 2026 · 172 m away
  • Building permit

    Balcony repairs on north and west elevations (Phase 2)

    2233 EGLINTON AVE E · Sep 9, 2026 · 165 m away
  • Zoning review

    Closed

    780 BIRCHMOUNT RD · Jul 7, 2026 · 286 m away
  • Building permit

    Proposal for balcony repairs.

    2233 EGLINTON AVE E · Jun 30, 2026 · 165 m away
  • Building permit

    Repair and reinstate a portion of the dwelling due to fire damage

    101 WOODFERN DR · Jun 16, 2026 · 212 m away
  • Building permit

    Proposal for interior alteration to vacant unit for fitout of new tenant.

    888 BIRCHMOUNT RD · May 4, 2026 · 172 m away
  • Building permit

    1 wall sign**RECOVER PHYSIO**

    2300 EGLINTON AVE E · Nov 10, 2025 · 235 m away
  • Building permit

    Proposal for interior alterations to an existing retail unit for a new physiotherapy clinic within an existing one-storey commercial plaza.

    2300 EGLINTON AVE E · Oct 29, 2025 · 235 m away
  • Building permit

    1 wall sign**RECOVER PHYSIO**

    2300 EGLINTON AVE E · Oct 27, 2025 · 235 m away
  • Building permit

    Proposal for balcony repairs.

    2231 EGLINTON AVE E · Sep 5, 2025 · 130 m away

Neighbourhood: Ionview

About the area around the lot, not the lot itself.

Nearest station
Birchmount Station2 min walk
Nearest TTC stop
Birchmount Rd at Eglinton Ave East2 min walk
Nearest cycling route
Eglinton Ave EBike Lane, 2 min walk
Nearest traffic count
34,783 vehicles in 14 hBirchmount Rd / Eglinton Ave E, 140 m away, Oct 19, 2024
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
Eglinton Ravine Park5 min walk
Maidavale Park6 min walk
Farlinger Ravine10 min walk

Schools within 1 km

  • KHAIRUL UMMAH SCHOOL Private 10 min walk
  • A PLUS ACADEMY OF ADVANCEMENT Private 14 min walk
  • ST MARIA GORETTI CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • SALAHEDDIN ISLAMIC SCHOOL Private 14 min walk
  • IONVIEW PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureIonviewMedian neighbourhood
Median household income (2020)$74,500$84,500
Households that own their home39%54%
Population (2021)13,36516,813
Homes built in 1960 or before40%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleIonviewCity median
Assault813.8636.3
Robbery91.269.5
Homicide75.3
Shootings710.5
Auto theft140.3192.6
Theft over $5,00042.146.1
Break and enter91.2172.8
Theft from vehicles203.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.