HousePrecheckCheck an address

825 Church StToronto · zoning, lot size and permit records

≈ 93.2 × 65.0 m3,693 m²on Church St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.4 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 12 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 93.2 m frontage≈ 65.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0826/13TEY (To alter the redevelopment plan for a 37-storey residential building approved under By-..., 2013); A0427/10TEY (The site is located east of Yonge Street on the north side of Church Street. To alter t..., 2010).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation26 168058 GRA 00 IRClosed

    Graffiti

    May 27, 2026 · 825 CHURCH ST
  • Building permit25 249584Cancelled

    Proposal to install 2 maglocks on exterior fence.

    Nov 5, 2025 · 825 CHURCH ST
  • Building permit25 219865Cancelled

    Proposal to install 2 maglocks on exterior fence.

    Sep 3, 2025 · 825 CHURCH ST
  • Building permit14 183586Closed

    To erect and display one illuminated overhanging structure sign, in conjunction with a new condominium located on the premises. **Milan SALES CENTRE**

    Aug 12, 2014 · 825 CHURCH ST
  • Building permit14 110615Closed

    To install seven mag locks to P5, P4, P3, P2,P1 and the 9th floor of the existing condo building.

    Feb 6, 2014 · 825 CHURCH ST
  • Minor varianceA0826/13TEYApproved

    To alter the redevelopment plan for a 37-storey residential building approved under By-law 101-2003, as modified by the Committee of Adjustment in Decision No.A0620/06TEY, and No. A0427/10TEY by constructing an elevator vestibule and a new parapet on the roof, and replace "Zoning Map-Plan 2A" with the "Revised Zoning Map-Plan 2A" submitted with this application.

    Dec 11, 2013 · 825 CHURCH ST
  • Minor varianceA0427/10TEYApproved

    The site is located east of Yonge Street on the north side of Church Street. To alter the redevelopment plan approved under By-law 101-2003, as modified by the Committee of Adjustment in Decision No. A0620/06TEY, by increasing the ceiling heights for floors 33-36 of the approved 37-storey residential condominium building. This alteration will affect the height of the building.

    Jun 9, 2010 · 825 CHURCH ST
  • Building permit09 188194Closeddemolition

    demolition permit for 1 storey parking structure - See Building permit for new condo and site plan approval under 837 Yonge st REAR

    Dec 17, 2009 · 825 CHURCH ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,693 m²
Frontage
93.2 mestimated, irregular lot
Depth
65 mestimated, irregular lot
Street
Church St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    96%23 of 24 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    1
    Development applications
    31

    Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.

      1235 BAY ST · Oct 14, 2026 · 327 m away
    • Minor varianceApproved

      To convert the existing two-storey semi-detached mixed-use building (containing two residential dwelling units and three commercial units) to commercial uses. Also, to alter the building by constructing a rear one-storey vestibule addition to replace the existing attached garage, a front second storey dormer addition, a raised rear second storey balcony to replace the existing balcony, and a side (east) exterior staircase. The altered building will contain three commercial units (one dental clinic occupying the ground and second storeys, and two commercial units within the basement). There will be no residential dwelling units on this lot.

      17 BELMONT ST · Sep 2, 2026 · 342 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.

      874 YONGE ST · Aug 5, 2026 · 107 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.

      27-29 YORKVILLE AVE · Jul 15, 2026 · 247 m away
    • Minor varianceApproved

      To alter the existing residential dwelling unit by converting it into two separate residential dwelling units (occupying the second and third storeys of the existing three-storey mixed-use building). Also, to extend the existing commercial unit (currently occupying the ground floor) into the basement.

      106 SCOLLARD ST · Jun 10, 2026 · 460 m away

    Latest activity nearby

    • Building permit

      REV02: Proposed revision to revised architectural floor plan and structural steel layout forthe mezzanine floorRevision 1: Revised Washroom Layout, Interior Layout, and Stair Refinement.Proposal for interior alterations for restaurant.

      50 SCOLLARD ST · Nov 25, 2026 · 264 m away
    • Zoning review

      Application Acceptable

      12 CUMBERLAND ST · Nov 24, 2026 · 228 m away
    • Building permit

      Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.

      40 ASQUITH AVE · Nov 20, 2026 · 182 m away
    • Building permit

      6 overhanging structure signs**AEVUM**

      11 YORKVILLE AVE · Nov 19, 2026 · 194 m away
    • Building permit

      Proposed interior alterations to an existing office

      2 BLOOR ST E · Nov 18, 2026 · 277 m away
    • Building permit

      Proposal for interior alterations to an existing office.

      2 BLOOR ST E · Nov 17, 2026 · 277 m away
    • Building permit

      INTERIOR RENOVATION OF AN EXISTING CONDO SUITE IN EXISTING CONDOMINIUM - UNIT 4802

      50 YORKVILLE AVE · Nov 16, 2026 · 236 m away
    • Zoning review

      Not Started

      12 CUMBERLAND ST · Nov 12, 2026 · 228 m away
    • Building permit

      Proposal for ground floor sprinkler alteration for the bicycle storage and associated office/corridor

      877 YONGE ST · Nov 10, 2026 · 163 m away
    • Building permit

      Proposal to install one (1) maglock.

      717 CHURCH ST · Nov 6, 2026 · 134 m away

    Neighbourhood: Rosedale-Moore Park

    About the area around the lot, not the lot itself.

    Nearest station
    Yonge Station4 min walk
    Nearest TTC stop
    Yonge St at Scollard St1 min walk
    Nearest cycling route
    Yonge StCycle Track, 1 min walk
    Nearest traffic count
    15,444 vehicles in 14 hDavenport Rd / Yonge St / Church St, 80 m away, Nov 9, 2025
    Serious collisions within 500 m
    82021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 3 with cyclists
    Parks
    Harold Town Park1 min walk
    Rosedale Ravine Lands1 min walk
    Lawren Harris Park1 min walk

    Schools within 1 km

    • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 3 min walk
    • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 7 min walk
    • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 7 min walk
    • CAREER QUEST - TORONTO Private 10 min walk
    • BRANKSOME HALL GIRLS SCHOOL Private 10 min walk
    • ROSEDALE DAY SCHOOL Private 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureRosedale-Moore ParkMedian neighbourhood
    Median household income (2020)$122,000$84,500
    Households that own their home58%54%
    Population (2021)20,08016,813
    Homes built in 1960 or before46%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleRosedale-Moore ParkCity median
    Assault1080.4636.3
    Robbery86.869.5
    Auto theft199.6192.6
    Theft over $5,00065.146.1
    Break and enter455.6172.8
    Theft from vehicles182.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.