HousePrecheckCheck an address

8200 Sheppard Ave EToronto · zoning, lot size and permit records

UT45.7 × 61.2 m2,737 m²on Sheppard Ave Ecorner, also on Water Tower Gt

Not a home

Rouge Tank Property

The City of Toronto's real estate inventory lists Rouge Tank Property here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Utility or City worksTrucks and work noise at times.
N20 m
45.7 m frontage61.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    2 records on file: more than at 72% of Toronto houses (median 0).

    • Building permit15 246821Closed

      Install 1" RP backflow prevention device.

      Nov 24, 2015 · 8200 SHEPPARD AVE E
    • Building permit10 126988Closed

      INTERIOR ALTERATIONS TO WATER TOWER MAIN FLOOR, ADD VENT SYSTEM TO HVAC

      Apr 19, 2010 · 8200 SHEPPARD AVE E

    Lot facts

    Area
    2,737 m²
    Frontage
    45.7 m
    Depth
    61.2 m
    Street
    Sheppard Ave E
    Corner lot
    Yes, also on Water Tower Gt61.2 m along it
    Public lane
    None
    House footprint
    696 m²roof up to 40.9 m
    Back yard
    12.5 mhouse to rear lot line
    Side yards
    3.4 m and 12.6 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone UT (Utility and Transportation). Chapter 100, section 100.10 of the by-law. Source

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    1

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      Interior alterations to enclosed hallway located within the existing industrial faiclity and does not result in any increase to the existing occupant load. The hallway is intended primarily to provide privacy and noise reduction for guests. it will be constructed using a modular assembly to allow for regular maintenance and easy relocation of machinery

      8150 SHEPPARD AVE E · Sep 18, 2026 · 141 m away
    • Building permit

      Install (1) 40'x100' Temporary Tent for a corporate event from June 5th to June 7th, 2026.

      51 GRAND MARSHALL DR · Jun 5, 2026 · 233 m away
    • Building permit

      Revision 02: Revision to permit set drawingsRevision 01: Proposal to south west corner using double wallProposed 3-storey industrial facility addition (3840.04 sq.m) with manufacturing spaces including washrooms, offices, and supporting spaces. Alteration area of approx. 10.80 sq.m.

      8150 SHEPPARD AVE E · Feb 6, 2026 · 141 m away
    • Zoning review

      Cancelled

      20 VENTURE DR · Oct 21, 2025 · 81 m away
    • Zoning review

      Cancelled

      20 VENTURE DR · Oct 21, 2025 · 81 m away
    • Building permit

      Create mezzanine and washroom to existing Warehouse and change the RTU, UNIT 32 AND 33

      87 THORNMOUNT DR · Oct 21, 2025 · 233 m away
    • Zoning review

      Closed

      1145 MORNINGSIDE AVE · Aug 7, 2025 · 276 m away
    • Zoning review

      Closed

      20 VENTURE DR · Feb 12, 2025 · 81 m away
    • Building permitnew building

      Proposal to legalize existing temporary prefabricated building on-site

      8270 SHEPPARD AVE E · Jan 24, 2025 · 279 m away
    • Building permit

      Construction of three gazebos.

      8150 SHEPPARD AVE E · Nov 18, 2024 · 141 m away

    Neighbourhood: Morningside Heights

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Sheppard Ave East at Water Tower Gate1 min walk
    Nearest cycling route
    Sheppard Ave EBike Lane, 1 min walk
    Nearest traffic count
    22,461 vehicles in 14 hSheppard Ave E / Grand Marshall Dr / Water Tower Gt, 70 m away, Dec 10, 2024
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Malvern Woods6 min walk
    Joyce Trimmer Park7 min walk
    Upper Rouge Trail Park9 min walk

    Schools within 1 km

    • ALVIN CURLING PUBLIC SCHOOL English Public 11 min walk
    • EMILY CARR PUBLIC SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMorningside HeightsMedian neighbourhood
    Median household income (2020)$117,000$84,500
    Households that own their home84%54%
    Population (2021)24,94016,813
    Homes built in 1960 or before1%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMorningside HeightsCity median
    Assault486.1636.3
    Robbery138.469.5
    Shootings18.710.5
    Auto theft362.7192.6
    Theft over $5,00067.346.1
    Break and enter149.6172.8
    Theft from vehicles243.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.