HousePrecheckCheck an address

819 Yonge StToronto · zoning, lot size and permit records

Also 819A Yonge St, 821 Yonge St, 823 Yonge St, 856 Church St

Commercial residential · CR 3.0 (c2.5; r3.0) SS1 (x1901)≈ 18.6 × 34.7 m418 m²on Yonge Stcorner, also on Church St

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 12 156008 (This is for the replacement of 32 windows on the front elevation(Yonge Street) and the..., 2012, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 13 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.
N10 m
≈ 18.6 m frontage≈ 34.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2012

    Needs a closer look

    Still open in the City's records: 12 156008 (This is for the replacement of 32 windows on the front elevation(Yonge Street) and the..., 2012, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 114664 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 13 development applications open within 300 m

    Good to know

    13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 114664 PRS 00 IRClosed

    Property Standards

    Feb 8, 2026 · 819 YONGE ST
  • Building permit16 244991Closed

    Backflow Prevention Devices

    Nov 29, 2016 · 819 YONGE ST
  • Building permit16 216035Closed

    Proposed interior alterations to the existing dental office on the ground floor

    Sep 21, 2016 · 819 YONGE ST
  • Zoning review15 167256 LTOClosed
    Jun 2, 2015 · 819 YONGE ST
  • Zoning review12 265377 ZBAClosed
    Oct 19, 2012 · 819 YONGE ST
  • Building permit12 156008Permit Issued

    This is for the replacement of 32 windows on the front elevation(Yonge Street) and the side elevation (Church Street).

    Apr 25, 2012 · 819 YONGE ST
  • Zoning review07 250817 ZSVClosed
    Aug 7, 2007 · 819 YONGE ST
  • Zoning review07 228469 ZPRClosed
    Jun 6, 2007 · 819 YONGE ST
Show 2 older records
  • Zoning review96 025637 LTOClosed
    Oct 31, 1996 · 819 A YONGE ST
  • Zoning review95 024551 LTOClosed
    Jan 27, 1995 · 819 A YONGE ST

Check before you build

  • Site-specific exception 900.11.10(1901)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1901)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 132 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
418 m²
Frontage
18.6 mestimated, irregular lot
Depth
34.7 mestimated, irregular lot
Street
Yonge St
Corner lot
Yes, also on Church St34.7 m along it
Public lane
None
House footprint
393 m²
Back yard
3.9 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 211, 225. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Church Street, Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c2.5; r3.0) SS1 (x1901) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%24 of 24 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
33

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.

    1235 BAY ST · Oct 14, 2026 · 272 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building (previous residential and office uses which are currently vacant) with rear second and third storey balconies, by converting it into a personal service use (grooming spa).

    131 DAVENPORT RD · Oct 7, 2026 · 499 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.

    874 YONGE ST · Aug 5, 2026 · 54 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.

    27-29 YORKVILLE AVE · Jul 15, 2026 · 193 m away
  • Minor varianceApproved

    To alter the existing residential dwelling unit by converting it into two separate residential dwelling units (occupying the second and third storeys of the existing three-storey mixed-use building). Also, to extend the existing commercial unit (currently occupying the ground floor) into the basement.

    106 SCOLLARD ST · Jun 10, 2026 · 414 m away

Latest activity nearby

  • Zoning review

    Application Acceptable

    12 CUMBERLAND ST · Nov 24, 2026 · 178 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.

    40 ASQUITH AVE · Nov 20, 2026 · 192 m away
  • Building permit

    6 overhanging structure signs**AEVUM**

    11 YORKVILLE AVE · Nov 19, 2026 · 141 m away
  • Building permit

    Proposed interior alterations to an existing office

    2 BLOOR ST E · Nov 18, 2026 · 260 m away
  • Building permit

    Proposal for interior alterations to an existing office.

    2 BLOOR ST E · Nov 17, 2026 · 260 m away
  • Building permit

    INTERIOR RENOVATION OF AN EXISTING CONDO SUITE IN EXISTING CONDOMINIUM - UNIT 4802

    50 YORKVILLE AVE · Nov 16, 2026 · 183 m away
  • Zoning review

    Not Started

    12 CUMBERLAND ST · Nov 12, 2026 · 178 m away
  • Building permit

    Proposal for ground floor sprinkler alteration for the bicycle storage and associated office/corridor

    877 YONGE ST · Nov 10, 2026 · 183 m away
  • Building permit

    Proposal to install one (1) maglock.

    717 CHURCH ST · Nov 6, 2026 · 154 m away
  • Building permit

    2 OVERHANGING STRUCTURE SIGNS + 1 WALL SIGN**SWEAT AND TONIC**

    11 YORKVILLE AVE · Nov 3, 2026 · 141 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
Yonge Station3 min walk
Nearest TTC stop
Yonge St at Scollard St1 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
10,037 vehicles in 8 hYonge St / Scollard St, 40 m away, Jun 16, 2003
Serious collisions within 500 m
82021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 3 with cyclists
Parks
Frank Stollery Parkette1 min walk
Harold Town Park1 min walk
Town Hall Square1 min walk

Schools within 1 km

  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 3 min walk
  • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 6 min walk
  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 7 min walk
  • CAREER QUEST - TORONTO Private 9 min walk
  • ROSEDALE DAY SCHOOL Private 10 min walk
  • BRANKSOME HALL GIRLS SCHOOL Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.