Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 26 147536 PRS 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
8 records on file: more than at 98% of Toronto houses (median 0).
- By-law investigation26 158103 GRA 00 IVClosed
Notice Issued Graffiti
May 3, 2026 · 81 BOND ST - By-law investigation26 154042 GRA 00 IRClosed
Graffiti
May 3, 2026 · 81 BOND ST - By-law investigation26 147536 PRS 00 IRClosed
Property Standards
Apr 21, 2026 · 81 BOND ST - By-law investigation26 130383 GRA 00 IVClosed
Notice Issued Graffiti
Sep 22, 2025 · 81 BOND ST - By-law investigation25 228773 GRA 00 IRClosed
Graffiti
Sep 22, 2025 · 81 BOND ST - Development application20 124315 STE 13 OZClosed
52-storey, 681 dwelling units, building with retail space at grade
Mar 10, 2020 · 91 DUNDAS ST E · City file - Zoning review99 021879 LTOClosedFeb 4, 1999 · 81 BOND ST
- Zoning review85 026534 LTOClosedMar 27, 1985 · 81 BOND ST
Check before you build
Site-specific exception 900.11.10(2156)
Needs a closer look4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 216 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 256 of former City of Toronto By-law 438-86
- Older by-law D
On the lands municipally known as 81 Bond St. in 1987, Section 12(1) 344 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 1,686 m²
- Frontage
- 35.8 m
- Depth
- 47.3 m
- Street
- Dundas St E
- Corner lot
- Yes, also on Bond St47.3 m along it
- Public lane
- Ln W Church S Dundas, 53.8 m along it
- Max height
- —
- Max lot coverage
- —
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Dundas Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c2.0; r4.0) SS1 (x2156) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 94%17 of 18 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 36
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 18 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 346 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 404 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 377 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 246 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 257 m away
Latest activity nearby
- Zoning review
Closed
335 YONGE ST · Nov 23, 2026 · 291 m away - Building permit
Proposal to replace existing pre-action system fire control panel and associated initiating field devices.
30 BOND ST · Nov 19, 2026 · 265 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 155 m away - Building permit
Installation of a seasonal decorative Christmas wreath (designated structure) attached to the exterior wall of a retail store, Le Maison Simons, for the Christmas season.
260 YONGE ST · Nov 6, 2026 · 270 m away - Building permit
Sprinklers related to 25-195702 BLD
30 BOND ST · Nov 2, 2026 · 265 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 189 m away - Building permit
1 overhanging structure sign**SIMONS CHRISTMAS WREATH**
260 YONGE ST · Oct 27, 2026 · 270 m away - Zoning review
Closed
1 DUNDAS ST E · Oct 26, 2026 · 210 m away - Building permit
1 overhanging structure sign**SIMONS CHRISTMAS WREATH**
260 YONGE ST · Oct 15, 2026 · 270 m away - Building permit
1 wall sign + 1 projecting sign**EGGSLUT**
10 DUNDAS ST E · Oct 6, 2026 · 241 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station4 min walk
- Nearest TTC stop
- Dundas St East at Church St1 min walk
- Nearest cycling route
- Shuter StCycle Track, 3 min walk
- Nearest traffic count
- 11,168 vehicles in 14 hDundas St E / Bond St, 40 m away, Aug 20, 2024
- Serious collisions within 500 m
- 212021–2026, killed or seriously injured: 2 fatal, 13 with pedestrians, 4 with cyclists
- Parks
- Arena Gardens3 min walk
- Toronto Metropolitan University Square3 min walk
- 45 Dalhousie St Park4 min walk
Schools within 1 km
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 1 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 1 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 2 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 2 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 3 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 3 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.