Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 81 Balsam Ave
81 Balsam Ave is on a 10.2 m by 40.7 m lot on Balsam Ave in The Beaches. The zoning is R.
The City has 10 records on this lot since 2000. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Rev 01 - underpinning of existing basement.proposal for interior alterations to the main floor kitchen and third floor layout". Status: closed. In 2016, a building permit was filed: "Proposal for interior alterations to basement and third floors". Status: closed. In 2001, a building permit was filed: "Alter plans as approved under 00-340479 by constructing 3rd floor dormer at rear. see c of a dec. hold for final & binding". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 44 minor variance applications in the last 10 years and approved 86%. The nearest TTC stop is Queen St East at Beech Ave, a 4-minute walk.
Summary
What the City's records show on this house
- 1 by-law investigation closed in the last two yearsLow
- No permit for a second unit on fileLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
What the rules allow here: Multiplex up to 6 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-06-11 | Building permit25 123807 | REV 01 - Underpinning of existing basement.Proposal for interior alterations to the main floor kitchen and third floor layout. | Closed | |
| 2025-04-30 | By-law investigation25 151482 PRS 00 IR | Property Standards | Closed | |
| 2016-05-03 | Building permit15 258250 | Proposal for interior alterations to basement and third floors. | Closed | |
| 2001-02-06 | Building permit00 363386 | alter plans as approved under 00-340479 by constructing 3rd floor dormer at rear. see c of a dec. hold for final & binding | Closed | |
| 2001-01-23 | Building permit01 100333 | Alter existing hot water heating system by relocating radiators and installing additional radiators. | Closed | |
| 2001-01-08 | Building permit01 101156 | install fixtures on 1st floor- 1 w.c., 1 w.b., 1 d.w., 2.k.s; 2nd floor- 1 w.c., 1 w.b., 1 b.t., 1 w.t., 1 w.m., 1 f.d.; 3rd floor- 1 w.c., 1 w.b., 1 b.t. see bp#00-340479. PERMIT PICKED UP | Closed | |
| 2000-12-12 | Minor varianceA871/00TO | Construct a rear third floor dormer addition. The addition will have dimensions of approximately 0.86 by 1.66 metres and a floor area of approximately 1.44 square metres. | Approved | |
| 2000-10-30 | Building permit00 341014 | Alter plans as approved under file 340479 by constructing 2 storey addition in lieu of one storey addition with deck at rear 2nd floor level. Also make alterations to third floor with deck at rear 3rd floor level. | Closed | |
| 2000-09-28 | Zoning review00 341297 CMB | No description on file | Closed | |
| 2000-09-26 | Building permit00 340479 | Build one storey addition at rear with uncovered platform at rear; Demolish private detached garage at rear and build new private garage. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: allowed
- Garden suite: likely fits
- Secondary suite: allowed
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 129 m²
- Back yard
- 17.8 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- 9 suite and multiplex permits within 300 m in 10 years
- 44 minor variance decisions within 300 m, 86% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
The Beaches neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Danforth GO StationNearest station30 min walk
- Queen St East at Beech AveNearest TTC stop4 min walk
- Balsam AveNearest cycling route3 min walk
- St Denis Catholic Elementary SchoolSchool1 min walk
- Balmy Beach Community SchoolSchool5 min walk
- Avalon Children's Montessori SchoolSchool5 min walk
- The Cole AcademySchool6 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3525.6
- Robberycity median 69.525.2
- Auto theftcity median 192.6164
- Theft over $5,000city median 46.150.5
- Break and entercity median 172.8151.4
- Theft from vehiclescity median 188.1243.9
Ready emails
Copy and send as they are.
1 question for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist