HousePrecheckCheck an address

81 Arrow RdToronto · zoning, lot size and permit records

Employment · EH 1.096.7 × 190.5 m18,342 m²on Arrow Rd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
96.7 m frontage190.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    6 records on file: more than at 95% of Toronto houses (median 0).

    • Zoning review20 175285 PPLCancelled
      Sep 11, 2020 · 81 ARROW RD
    • Building permit14 114238Closed

      Proposal to install solar PV System on the roof and electrical equipment pad on the ground.

      Mar 3, 2014 · 81 ARROW RD
    • Building permit05 151751Closednew building

      To construct two sprinklered self storage buildings having areas of 3996.8m2 and 1132m2 respectively, the latter to be unheated. (Phase 2 & 3 self storage facility build out.)

      Dec 1, 2005 · 81 ARROW RD
    • Building permit04 166440Closeddemolition

      Demolition of an existing warehouse storage building.

      Sep 14, 2004 · 81 ARROW RD
    • Building permit04 122706Closed

      HVAC - New single storey self-storage facility. **Apple Self-Storage** - New Building

      Jun 10, 2004 · 81 ARROW RD
    • Building permit04 139978Cancelled

      Site services

      May 27, 2004 · 81 ARROW RD

    Lot facts

    Area
    18,342 m²
    Frontage
    96.7 m
    Depth
    190.5 m
    Street
    Arrow Rd
    Corner lot
    No
    Public lane
    None
    House footprint
    4,452 m²
    Back yard
    21.4 mhouse to rear lot line
    Side yards
    20.5 m and 43 mhouse to side lot lines
    Buildings on the lot
    3house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone EH 1.0 (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
    • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm, accolade (8 cm), honey locust skyline (6 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      Proposed interior alterations for existing office on ground floor and mezzanine floor

      64 ARROW RD · Nov 20, 2026 · 235 m away
    • Building permit

      Proposal for the installation of a rooftop 321kW-DC solar photovoltaic system at Univar Solutions,

      64 ARROW RD · Aug 31, 2026 · 235 m away
    • Zoning review

      Notice Sent

      106-120 ARROW RD · Apr 9, 2026 · 241 m away
    • Consent (lot split)Approved

      Section 57(1) of The Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.

      88-90 OAKDALE RD · Dec 16, 2025 · 293 m away
    • Consent (lot split)Pending

      Proposal for Validation of Title

      88-90 OAKDALE RD · Sep 19, 2025 · 293 m away
    • Building permit

      FS - Sprinkler Shop Drawing - The current CETI Rectification project involves modifications to the building systems to ensure that MTO programs can be executed to strict laboratory requirements and provide a functional and safe working environment. The rectifications mainly encompass mechanical HVAC and exhaust systems along with associated monitoring, control narrative and building automation systems adjustments. The alterations to the architectural systems are being proposed in accordance with the findings and the operational considerations provided by the MTO.

      95 ARROW RD · Jul 11, 2025 · 161 m away
    • Building permit

      Proposal for exterior claddingand exterior structural work including the applicaiton of external cladding retrofit of existing industrial building.

      104 OAKDALE RD · Feb 6, 2025 · 231 m away
    • Building permit

      Replace backflow prevention device due to leak - emergency repair

      120 OAKDALE RD · Oct 23, 2024 · 242 m away
    • Building permit

      Proposal to install a backflow preventor in an existing warehouse.

      50-52 ARROW RD · Sep 19, 2023 · 234 m away
    • Building permit

      Revision 02: Proposal to modify an existing flammable liquid filling room to be in compliance with OFC Part 4 and as approved by Toronto Fire Services.Revision #1 - to main roof beams and fire protection.

      64 ARROW RD · Aug 2, 2023 · 235 m away

    Neighbourhood: Humbermede

    About the area around the lot, not the lot itself.

    Nearest station
    Signet Arrow Station24 min walk
    Nearest TTC stop
    Arrow Rd at Lido Rd2 min walk
    Nearest traffic count
    14,439 vehicles in 14 hLido Rd / Arrow Rd, 170 m away, Oct 29, 2025
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Silvio Colella Park9 min walk
    Fennimore Park11 min walk
    Habitant Park15 min walk

    Schools within 1 km

    • ST JUDE CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
    • STANLEY PUBLIC SCHOOL English Public 15 min walk
    • THE AMBASSADORS OF GOD ACADEMY Private 15 min walk
    • THE AMBASSADORS OF GOD ACADEMY Private 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHumbermedeMedian neighbourhood
    Median household income (2020)$77,500$84,500
    Households that own their home46%54%
    Population (2021)16,95516,813
    Homes built in 1960 or before22%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHumbermedeCity median
    Assault990.9636.3
    Robbery71.569.5
    Shootings15.310.5
    Auto theft439.2192.6
    Theft over $5,00071.546.1
    Break and enter168.5172.8
    Theft from vehicles112.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.