HousePrecheckCheck an address

800 Royal York RdToronto · zoning, lot size and permit records

Residential apartment · RA (f24.0; au139.0)≈ 115.8 × 63.8 m5,765 m²on Royal York Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 60 rental units, built 1965More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 14 119734 (Revision to repair balconies and replace guards for remaining 30 units in existing apar..., 2014, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 91 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 115.8 m frontage≈ 63.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Building permit open since 2014

    Needs a closer look

    Still open in the City's records: 14 119734 (Revision to repair balconies and replace guards for remaining 30 units in existing apar..., 2014, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (84% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 171834 000 00 IR (Adequate Heat, 2026); 26 171833 000 00 IR (Property Standards, 2026); 26 148528 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    0 approved. A169/13EYK (To increase the number of residential units from 60 to 76 within the existing apartment..., 2013).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • Rental building evaluation: 91 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (6 storeys, 60 units, built 1965).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 171834 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 800 ROYAL YORK RD
  • By-law investigation26 171833 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 800 ROYAL YORK RD
  • By-law investigation26 148528 PRS 00 IRClosed

    Property Standards

    Apr 22, 2026 · 800 ROYAL YORK RD
  • By-law investigation25 231825 SIN 00 IRClosed

    Signs

    Sep 28, 2025 · 800 ROYAL YORK RD
  • By-law investigation25 225295 SIN 00 IRClosed

    Signs

    Sep 14, 2025 · 800 ROYAL YORK RD
  • By-law investigation25 114151 ELS 00 IRClosed

    Election Signs

    Feb 7, 2025 · 800 ROYAL YORK RD
  • Building permit14 119734Inspection

    Revision to repair balconies and replace guards for remaining 30 units in existing apartment building

    Mar 18, 2014 · 800 ROYAL YORK RD
  • Minor varianceA169/13EYKRefused

    To increase the number of residential units from 60 to 76 within the existing apartment building.

    Aug 15, 2013 · 800 ROYAL YORK RD
Show 5 older records
  • Building permit13 133233Closed

    Install (1) backflow prevention device

    Mar 26, 2013 · 800 ROYAL YORK RD
  • Zoning review12 296793 ZPRClosed
    Dec 20, 2012 · 800 ROYAL YORK RD
  • Building permit11 235737Closed

    Repair balcony and replace guards for six units in existing apartment building (Units: 309, 409, 509, 201, 301, 501).

    Aug 8, 2011 · 800 ROYAL YORK RD
  • Building permit04 143338Closed

    Prop. telecom. tower on top of exist. apt. bldg. and roof top shelter

    Jul 23, 2004 · 800 ROYAL YORK RD
  • Zoning review02 150466 ZPRClosed
    Jun 25, 2002 · 800 ROYAL YORK RD

Lot facts

Area
5,765 m²
Frontage
115.8 mestimated, irregular lot
Depth
63.8 mestimated, irregular lot
Street
Royal York Rd
Corner lot
No
Public lane
None
House footprint
999 m²roof up to 29 m
Back yard
33.9 mhouse to rear lot line
Side yards
15.9 m and 36.1 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
40%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Minimum frontage 24 m. Frontage is about 115.8 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RA (f24.0; au139.0) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: ginkgo (8 cm), elm, accolade (8 cm), elm, accolade (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%16 of 17 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    backwater valve installation

    68 FERNALROY BLVD · Nov 20, 2026 · 268 m away
  • Building permit

    Installation of a backwater valve to existing dwelling

    178 HUMBERVALE BLVD · Nov 18, 2026 · 181 m away
  • Building permit

    Installation of Main Drain Back Water Valve Inc.

    7 LORAHILL RD · Nov 18, 2026 · 68 m away
  • Zoning review

    Notice Sent

    3 NORSEMAN ST · Nov 5, 2026 · 256 m away
  • Building permit

    Proposal to install backwater valve.

    180 HUMBERVALE BLVD · Oct 14, 2026 · 157 m away
  • Minor varianceRefused

    To construct a new detached dwelling with an attached garage.

    3 NORSEMAN ST · Oct 8, 2026 · 256 m away
  • Zoning review

    Notice Sent

    5 COLWYN RD · Sep 25, 2026 · 172 m away
  • Building permit

    Proposal for a canopy in the rear yard

    4 SEVENOAKS AVE · Jun 26, 2026 · 179 m away
  • Building permit

    GROUND FLOOR RENOVATION OF EXISTING KITCHEN AND BATHROOM, REMOVE WALL BETWEEN KITCHEN & DINING ROM AND INSTALL NEW BEAM.

    132 THOMPSON AVE · Jun 24, 2026 · 291 m away
  • Building permit

    Proposal interior alterations to exisitng kitchen, ensuite in primary bedroom in existing SFD

    40 SEVENOAKS AVE · Jun 23, 2026 · 233 m away

Neighbourhood: Stonegate-Queensway

About the area around the lot, not the lot itself.

Nearest station
Royal York Station18 min walk
Nearest TTC stop
800 Royal York Rd1 min walk
Nearest cycling route
Royal York RdBike Lane, 1 min walk
Nearest traffic count
9,835 vehicles in 8 hRoyal York Rd / Norseman St, 240 m away, Dec 13, 2022
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Trca Lands ( 74)2 min walk
Reid Manor Park2 min walk
Spring Garden Park5 min walk

Schools within 1 km

  • ST MARGUERITE D'YOUVILLE CATHOLIC ELEMENTARY SCHOOL French Separate 6 min walk
  • SUNNYLEA JR SCHOOL English Public 7 min walk
  • THE LEARNING COMMON Private 7 min walk
  • BISHOP ALLEN ACADEMY English Separate 10 min walk
  • NORSEMAN JR MDL SCHOOL English Public 13 min walk
  • ETOBICOKE SCHOOL OF THE ARTS English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureStonegate-QueenswayMedian neighbourhood
Median household income (2020)$104,000$84,500
Households that own their home63%54%
Population (2021)25,65016,813
Homes built in 1960 or before55%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleStonegate-QueenswayCity median
Assault465.6636.3
Robbery40.869.5
Homicide3.45.3
Shootings13.610.5
Auto theft193.7192.6
Theft over $5,0006846.1
Break and enter217.5172.8
Theft from vehicles129.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.