HousePrecheckCheck an address

800-816 Alness StToronto · zoning, lot size and permit records

Employment · EH 1.0 (x45)68.8 × 96.4 m6,561 m²on Alness St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 11 222285 (Two inch backflow preventor, 2011, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
68.8 m frontage96.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2011

    Needs a closer look

    Still open in the City's records: 11 222285 (Two inch backflow preventor, 2011, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Zoning review22 184621 ZZUClosed
    Aug 2, 2022 · 800-816 ALNESS ST
  • Building permit11 256861Closed - Dormant

    Install backflow prevention device

    Sep 13, 2011 · 800-816 ALNESS ST
  • Building permit11 222285Permit Issued

    Two inch backflow preventor

    Jul 22, 2011 · 800-816 ALNESS ST
  • Building permit01 194512Closed

    INTERIOR ALTERATION TO AN EXISITNG OFFICE BUILDING 1ST AND SECOND FLOOR

    Apr 11, 2002 · 800-816 ALNESS ST

Check before you build

  • Site-specific exception 900.22.10(45)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.22.10(45)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625. © City of Toronto 1998-2026

By-law 569-2013, Chapter 900

Lot facts

Area
6,561 m²
Frontage
68.8 m
Depth
96.4 m
Street
Alness St
Corner lot
No
Public lane
None
House footprint
3,105 m²roof up to 11.7 m
Back yard
12.6 mhouse to rear lot line
Side yards
11.2 m and 15 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EH 1.0 (x45) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the basement and ground floor of existing building to a medical marijuana production facility.

    425 ALNESS ST · Nov 8, 2018 · 370 m away
  • Minor varianceApproved

    To convert the existing production studio to a post-secondary school use. Please be advised an application (A0668/15NY) with respect to the subject property was previously before the Committee of Adjustment on September 9, 2015. It was the decision of the Committee to APPROVE the application which sought a variance to permit a production studio use.

    907 ALNESS ST · Apr 7, 2016 · 238 m away
  • Minor varianceApproved

    To convert unit 121 into a production studio (226m²).

    907 ALNESS ST · Sep 9, 2015 · 238 m away

Latest activity nearby

  • Building permit

    Installation of Duct Collection System Spark Detection and water spray protection

    301-321 SUPERTEST RD · Nov 2, 2026 · 263 m away
  • Zoning review

    Closed

    913 ALNESS ST · Aug 17, 2026 · 252 m away
  • Building permit

    Rev 02: Amendment to existing permit 25 190668 HVA 00 MS to add wall mounted A/C unit to LAN Room on 2nd floor and to change exhaust fan in kitchen area to exhaust outside.Rev 01: changes to add a dropped acoustic tile ceiling on the 2nd floor. Lighting, HVAC and sprinkler layouts have been revised.HVAC - Proposal for interior alterations for the construction of new offices, washrooms, meeting spaces, lunchroom and elevator. New plumbing, new HVAC and electrical distribution and new sprinkler layout on 2nd floor. New lobby and barrier free entrance on the ground floor.

    850-894 ALNESS ST · Jun 4, 2026 · 125 m away
  • Zoning review

    Closed

    301-321 SUPERTEST RD · May 1, 2026 · 263 m away
  • Zoning review

    Closed

    300 SUPERTEST RD · Jan 21, 2026 · 229 m away
  • Zoning review

    Closed

    855-877 ALNESS ST · Jan 6, 2026 · 135 m away
  • Zoning review

    Closed

    155-177 DOLOMITE DR · Nov 17, 2025 · 290 m away
  • Building permit

    Proposed commercial kitchen ventilation and fire suppression system.

    855-877 ALNESS ST · May 27, 2025 · 135 m away
  • Building permit

    Proposal for structural work to reinforce the roof of an commercial building - UNIT 3Convenience address is 877 Alness St

    855-877 ALNESS ST · May 26, 2025 · 135 m away
  • Building permit

    REV 01: Reconfiguration of free-standing rack storage systemInstallation of a free-standing rack storage system

    655 SUPERTEST RD · May 7, 2024 · 285 m away

Neighbourhood: York University Heights

About the area around the lot, not the lot itself.

Nearest station
Finch West Station31 min walk
Nearest TTC stop
Alness St at Supertest Rd2 min walk
Nearest cycling route
Supertest RdSharrows, 2 min walk
Nearest traffic count
8,494 vehicles in 8 hSupertest Rd / Alness St, 160 m away, Dec 15, 2021
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
G. Ross Lord Park9 min walk

Schools within 1 km

  • BRIGHT START ACADEMY SCHOOL Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYork University HeightsMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home47%54%
Population (2021)28,25516,813
Homes built in 1960 or before14%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYork University HeightsCity median
Assault1274.1636.3
Robbery12869.5
Shootings11.910.5
Auto theft634.1192.6
Theft over $5,000178.646.1
Break and enter375.1172.8
Theft from vehicles312.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.