HousePrecheckCheck an address

80 Vanauley StToronto · zoning, lot size and permit records

Also 51 Paul Lane Gdns

≈ 69.2 × 76.6 m4,281 m²on Paul Lane Gdnscorner, also on Vanauley St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.4 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 19 190153 (Proposed installation of three (03) Electromagnetic Locks on Level P1, P2, and Ground F..., 2019, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 19 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 69.2 m frontage≈ 76.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2019

    Needs a closer look

    Still open in the City's records: 19 190153 (Proposed installation of three (03) Electromagnetic Locks on Level P1, P2, and Ground F..., 2019, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 25 145640 PRS 00 IV (Order Issued Property Standards: The property is not being kept free of pests, 2025); 25 142943 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 19 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation25 145640 PRS 00 IVClosed

    Order Issued Property Standards: The property is not being kept free of pests.

    Apr 10, 2025 · 80 VANAULEY ST
  • By-law investigation25 142943 PRS 00 IRClosed

    Property Standards

    Apr 10, 2025 · 80 VANAULEY ST
  • Building permit19 190153Inspection

    Proposed installation of three (03) Electromagnetic Locks on Level P1, P2, and Ground Floor.

    Jul 19, 2019 · 80 VANAULEY ST
  • Development application15 145688 STE 20 SAClosed

    Proposal for site plan approval for Phase 1B which will include blocks 13,14 and 15. Block 13 will consist of a 14 storey condo tower and 7 townhouses for a total of 262 residential units. Blocks 14 and 15 will consist of 21 TCHC townhomes

    Apr 23, 2015 · 80 VANAULEY ST · City file

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,281 m²
Frontage
69.2 mestimated, irregular lot
Depth
76.6 mestimated, irregular lot
Street
Paul Lane Gdns
Corner lot
Yes, also on Vanauley St76.6 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    94%15 of 16 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    3
    Development applications
    26

    Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

      42 CARR ST · Nov 4, 2026 · 257 m away
    • Minor varianceApproved

      To permit an entertainment facility-related use (interactive game show experience) located within a portion of the first storey of the existing four-storey building, in addition to the existing restaurant use (as approved under Building Permit 20 118020 BLD 00 BA) and existing recreational use (place of amusement, as approved under Minor Variance Decision A0903/23TEY). The existing office uses located on the second to fourth storeys will be maintained.

      336 QUEEN ST W · Sep 2, 2026 · 350 m away
    • Minor varianceApproved

      To construct a new two-storey detached ancillary building containing two laneway suites with a second level south canopy, in the rear yard, abutting Orphanage Mews laneway on the north side, and North Sullivan East Huron laneway on the west side.

      34 SULLIVAN ST · Aug 12, 2026 · 422 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony (above the existing rear two-storey portion of the dwelling).

      52 PHOEBE ST · Mar 11, 2026 · 292 m away
    • Minor varianceApproved

      To convert the existing three-storey semi-detached mixed-use building (residential and office uses) into a hotel use containing 22 rooms. The existing basement and ground floor restaurant will be maintained and unaltered.

      298 QUEEN ST W · Feb 18, 2026 · 497 m away

    Latest activity nearby

    • Building permit

      INTERIOR RENOVATION OF OFFICE AND OPEN WORKSTATIONS

      197 SPADINA AVE · Nov 24, 2026 · 246 m away
    • Building permit

      Proposed interior renovation and fit-out of an existing two-storey commercial building for a pediatric clinic.

      200 SPADINA AVE · Nov 13, 2026 · 188 m away
    • Zoning review

      Closed

      474 QUEEN ST W · Nov 9, 2026 · 171 m away
    • Zoning review

      Application On Hold

      77 GRANGE AVE · Nov 6, 2026 · 236 m away
    • Building permit

      1 Wall Sign*****Mark Health Network*****

      575 QUEEN ST W · Nov 5, 2026 · 261 m away
    • Minor varianceApproved

      To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

      42 CARR ST · Nov 4, 2026 · 257 m away
    • Building permit

      INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR & MEZZANINE LEVEL GROUP A-2 EATING ESTABLISHMENT ('DEAR GRAIN')

      511 RICHMOND ST W · Nov 4, 2026 · 282 m away
    • Building permit

      Proposal for alternative solution

      184 SPADINA AVE · Oct 28, 2026 · 198 m away
    • Building permit

      An alternative solution for demonstrating the proposed alternative egress route through Exit Stair A-A, which continues upward to the Level 1 Mezzanine Level in a manner similar to a crossover floor, provides an alternative egress route that may be considered to satisfy the intent of the OBC.

      184 SPADINA AVE · Oct 28, 2026 · 198 m away
    • Building permit

      Repair of the existing detached wood-frame garage at the rear of the lot (32 Augusta Avenue), replacing deteriorated wall studs, plates, roof joists, roof deck, roofing, cladding and lane doors in kind. No addition, no demolition, no change of use, no change to the footprint or height.

      32 AUGUSTA AVE · Oct 19, 2026 · 87 m away

    Neighbourhood: Kensington-Chinatown

    About the area around the lot, not the lot itself.

    Nearest station
    Osgoode Station17 min walk
    Nearest TTC stop
    Queen St West at Augusta Ave3 min walk
    Nearest cycling route
    Wolseley StBike Lane - Contraflow, 1 min walk
    Nearest traffic count
    1,063 vehicles in 8 hDenison Ave / Carr St / Randy Padmore Park Trl, 150 m away, Jun 7, 2023
    Serious collisions within 500 m
    152021–2026, killed or seriously injured: 1 fatal, 8 with pedestrians, 4 with cyclists
    Parks
    Randy Padmore Park1 min walk
    ALEX WILSON COMMUNITY GARDEN - Open Green Space4 min walk
    Alexandra Park5 min walk

    Schools within 1 km

    • RYERSON COMMUNITY SCHOOL & DOWNTOWN VOCAL MUSIC ACADEMY English Public 5 min walk
    • OGDEN JR PUBLIC SCHOOL English Public 6 min walk
    • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 7 min walk
    • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
    • HEYDON PARK SECONDARY SCHOOL English Public 12 min walk
    • BEVERLEY & SUBWAY ACADEMY TWO English Public 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureKensington-ChinatownMedian neighbourhood
    Median household income (2020)$62,000$84,500
    Households that own their home32%54%
    Population (2021)18,12016,813
    Homes built in 1960 or before26%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleKensington-ChinatownCity median
    Assault2017.5636.3
    Robbery19369.5
    Shootings21.910.5
    Auto theft118.4192.6
    Theft over $5,000219.346.1
    Break and enter443172.8
    Theft from vehicles850.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.