HousePrecheckCheck an address

80 The East MallToronto · zoning, lot size and permit records

Also 100 The East Mall

Employment · E 1.0≈ 149.2 × 267.9 m33,959 m²on The East Mall

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: 26 269032 (One wall sign*** TOTAL SPORTS CARDS & TCG***, 2026); 26 235862 (Proposed interior alterationsto convert existing retail to indoor golf training facilit..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 149.2 m frontage≈ 267.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 building permits open, the oldest since 2006

    Needs a closer look

    Still open in the City's records: 24 207180 (REVISION - abandon the existing watermain and replace with a new 250mm dia PVC watermai..., 2024, status Revision Issued); 24 194420 (Proposal for change of use and proposed interior alterations for happy feet indoor play..., 2024, status Inspection); 24 157564 (Proposed opening in CMU wall to connect existing unit 1, unit 2 & unit 3 - recreation use, 2024, status Inspection); and 2 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 269032 (One wall sign*** TOTAL SPORTS CARDS & TCG***, 2026); 26 235862 (Proposed interior alterationsto convert existing retail to indoor golf training facilit..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A73/11EYK (To permit a recycling facility (secured paper shredding facility) within the existing i..., 2011); A289/06EYK (To improve truck access to the loading bays by eliminating 42 existing on-site parking..., 2006).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

40 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 269032Permit Issued

    One wall sign*** TOTAL SPORTS CARDS & TCG***

    Nov 19, 2026 · 80 THE EAST MALL
  • Building permit26 235862Permit Issued

    Proposed interior alterationsto convert existing retail to indoor golf training facility with practice areas and storage rooms.

    Oct 8, 2026 · 100 THE EAST MALL
  • Zoning review26 206292 LTOClosed
    Jul 22, 2026 · 80 THE EAST MALL
  • Zoning review24 253551 ZAPCancelled
    Dec 24, 2024 · 80 THE EAST MALL
  • Building permit24 207180Revision Issued

    REVISION - abandon the existing watermain and replace with a new 250mm dia PVC watermainProposal to replace the watermain and connect to the existing system at the drain chamber at the propoerty limits.

    Oct 3, 2024 · 80 THE EAST MALL
  • Building permit24 194420Inspection

    Proposal for change of use and proposed interior alterations for happy feet indoor playground

    Sep 23, 2024 · 100 THE EAST MALL
  • Building permit24 157564Inspection

    Proposed opening in CMU wall to connect existing unit 1, unit 2 & unit 3 - recreation use.

    Sep 10, 2024 · 100 THE EAST MALL
  • Zoning review24 190449 ZZUClosed
    Jul 30, 2024 · 100 THE EAST MALL
Show 32 older records
  • Building permit23 189709Closed

    REVISION - to add electrical drawingsProposed interior alterations to convert unit into a badminton club.

    Dec 12, 2023 · 80 THE EAST MALL
  • Building permit23 189685Cancelled

    Proposed interior alterations to convert unit into a badminton club.

    Aug 16, 2023 · 80 THE EAST MALL
  • Zoning review23 159671 ZZUClosed
    Jun 12, 2023 · 80 THE EAST MALL
  • Building permit23 123397Closed

    To erect and display one illuminated wall sign****BOULDERZ CLIMBING CENTER***

    Mar 15, 2023 · 80 THE EAST MALL
  • Building permit22 239745Closed

    The proposal contains five first party illuminated wall signs, all displaying static copy erected at the first storey of the building.Dimensions:2.33m L x 3.55m W x 0.13m D at a height of 7.89m, on the west elevation.2.51m L x 4.57m W x 0.13m D at a height of 7.19m. on the south elevation.1.27m L x 4.32m W x 0.08m D at a height of 5.95m, on the east elevation.2.33m L x 4.32m W x 0.13m D at a height of 7.83m, on the north elevation.0.97m L x 4.32m W x 0.08m D at a height of 5.42m, on the north elevation.***t2h***

    Feb 6, 2023 · 80 THE EAST MALL
  • Building permit22 166204Closed

    Interior alterations to remove sections of the office space to create more warehouse. Removal of HVAC feeding these areas. Removal of sprinkler drops from these areas and leaving existing deck heads. Existing mechanical for office to remain is completely independant and already ducted and insulated. Provide exit/emergency lighting to code for life safety. No washroom work. No roof work. No gas piping. No plumbing.

    Aug 17, 2022 · 80 THE EAST MALL
  • Building permit20 148391Closed

    Proposal for interior alterations for unit 1B.

    Jun 22, 2020 · 80 THE EAST MALL
  • Building permit18 115997Closed

    Proposal to construct new offices within existing warehouse space - Unit 1B.

    Jun 19, 2018 · 80 THE EAST MALL
  • Building permit18 144374Closed

    HVAC - New roof top units to provide heating and cooling. Removal of existing make up air units and unit heaters. New instantatneous hot water heaters for gym users to wash hand/feet.

    May 16, 2018 · 80 THE EAST MALL
  • Zoning review17 214179 LPRClosed
    Aug 10, 2017 · 80 THE EAST MALL
  • Building permit17 128650Closed

    To erect and display one illuminated wall sign displaying static copy on the first storey of the northerly elevation measuring 4.57 m by 1.02 m at a height of 4.06 m. **DIVINE CONSIGNMENT**

    Apr 3, 2017 · 80 THE EAST MALL
  • Building permit07 197572Inspection

    New rooftop A/C units (x6) and new unit heaters (x2) to an existing industrial building.

    Mar 16, 2016 · 80 THE EAST MALL
  • Zoning review15 188309 LPRClosed
    Jul 10, 2015 · 100 THE EAST MALL
  • Zoning review15 151806 LTOClosed
    May 5, 2015 · 100 THE EAST MALL
  • Building permit14 114772Closed

    HVAC - Interior alteration of existing industrial unit #9 to create recreational-climbing centre including installation of roof top unit..

    Apr 16, 2014 · 80 THE EAST MALL
  • Building permit11 323751Closed

    To erect and display an illuminated, static copy wall sign at the west elevation of the property in conjunction with an existing business operating on the premises. **Iron Mountain**

    Dec 28, 2011 · 80 THE EAST MALL
  • Zoning review11 236318 ZPRClosed
    Jul 12, 2011 · 100 THE EAST MALL
  • Building permit11 135635Closed

    Proposed interior alteration for a new secure shredding facility tenant within an existing industrial building - "IRON MOUNTAIN".

    Jun 3, 2011 · 80 THE EAST MALL
  • Zoning review11 203597 ZPUClosed
    May 26, 2011 · 100 THE EAST MALL
  • Minor varianceA73/11EYKApproved

    To permit a recycling facility (secured paper shredding facility) within the existing industrial building.

    Apr 28, 2011 · 80 THE EAST MALL
  • Zoning review11 103236 ZPUClosed
    Jan 7, 2011 · 80 THE EAST MALL
  • Building permit09 176335Closed

    installation of backflow device

    Dec 3, 2009 · 80 THE EAST MALL
  • Building permit02 189597Inspection

    Plumbing - Interior Alterations to the *Ministry of Attorney General* - Interior Alterations

    Dec 21, 2006 · 80 THE EAST MALL
  • Building permit06 191915Cancelled

    Mezzanine addition to an existing warehouse showroom

    Nov 16, 2006 · 80 THE EAST MALL
  • Minor varianceA289/06EYKApproved

    To improve truck access to the loading bays by eliminating 42 existing on-site parking spaces.

    Jun 15, 2006 · 80 THE EAST MALL
  • Zoning review06 126886 LTOClosed
    Apr 19, 2006 · 80 THE EAST MALL
  • Zoning review06 107343 ZPRClosed
    Feb 3, 2006 · 80 THE EAST MALL
  • Building permit04 163628Closed - Dormantdemolition

    Interior Demolition of vacant courthouse building.

    Sep 8, 2004 · 80 THE EAST MALL
  • Zoning review03 199055 ZPRClosed
    Dec 9, 2003 · 80 THE EAST MALL
  • Building permit00 140218Closed - Dormant

    Demolish existing office partitions & construct new partitionsA128

    Oct 25, 2000 · 80 THE EAST MALL
  • Building permit00 129203Closed

    Mezzanine Addition/Interior Alterations to Provincial court Building. Plumbing & HVAC permits included.

    May 15, 2000 · 80 THE EAST MALL
  • Building permit99 084333Closed

    INTERIOR ALTS. TO GOVERNMENT BUILDING

    Sep 29, 1999 · 80 THE EAST MALL

Lot facts

Area
33,959 m²
Frontage
149.2 mestimated, irregular lot
Depth
267.9 mestimated, irregular lot
Street
The East Mall
Corner lot
No
Public lane
None
House footprint
15,025 m²roof up to 11.6 m
Back yard
16.1 mhouse to rear lot line
Side yards
12.1 m and 16.3 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a parking deficiency.

    120 THE EAST MALL · Aug 12, 2021 · 269 m away
  • Minor varianceApproved

    To construct a one-storey north side addition.

    106 NORTH QUEEN ST · Mar 23, 2021 · 343 m away
  • Minor varianceApproved

    To construct a one-storey rear addition.

    18 MEDULLA AVE · Aug 29, 2019 · 476 m away
  • Minor varianceApproved

    To convert the existing office buildings into medical office buildings.

    81 THE EAST MALL · May 7, 2015 · 144 m away

Latest activity nearby

  • Building permit

    Proposed converting existing A2 occupancy to F2 Occupancy for bakery production

    120 NORTH QUEEN ST · Nov 24, 2026 · 247 m away
  • Building permit

    One wall sign*** TOTAL SPORTS CARDS & TCG***

    80 THE EAST MALL · Nov 19, 2026 · 29 m away
  • Building permit

    Proposed interior alterationsto convert existing retail to indoor golf training facility with practice areas and storage rooms.

    100 THE EAST MALL · Oct 8, 2026 · 60 m away
  • Zoning review

    Closed

    80 THE EAST MALL · Jul 22, 2026 · 29 m away
  • Building permit

    Rev 01 - revision to add new offices Interior Alteration to AN EXISTING PHARMACY(Arch, HVAC (MINOR WORK))Add new MEDICAL OFFICESConvinience Address: 81 THE EAST MALL

    81 THE EAST MALL · Jul 9, 2026 · 144 m away
  • Building permit

    Proposed new wall to fully separate the second floor from the ground floor for single-tenant use.

    81 THE EAST MALL · Mar 27, 2026 · 144 m away
  • Building permit

    Proposal to upgrade existing food processing room with new insulated panels and doors. Mechanical, plumbing, and sprinkler adjusted to new layout.

    120 THE EAST MALL · Feb 5, 2026 · 269 m away
  • Building permit

    2 Ground Sign

    130 NORTH QUEEN ST · Jun 4, 2025 · 208 m away
  • Zoning review

    Application On Hold

    130 NORTH QUEEN ST · May 6, 2025 · 208 m away
  • Zoning review

    Closed

    130 NORTH QUEEN ST · Jan 27, 2025 · 208 m away

Neighbourhood: Etobicoke City Centre

About the area around the lot, not the lot itself.

Nearest station
Kipling Station39 min walk
Nearest TTC stop
The East Mall at North Queen St South Side2 min walk
Nearest traffic count
31,751 vehicles in 14 hThe East Mall / North Queen St, 170 m away, Oct 29, 2025
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists

2021 Census

FigureEtobicoke City CentreMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home50%54%
Population (2021)23,60016,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke City CentreCity median
Assault844.4636.3
Robbery187.769.5
Shootings16.210.5
Auto theft601.8192.6
Theft over $5,000200.646.1
Break and enter210.3172.8
Theft from vehicles278.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.