HousePrecheckCheck an address

80 St Clair Ave WToronto · zoning, lot size and permit records

Residential · R (d2.0) (x759)≈ 30.8 × 50.9 m1,010 m²on St Clair Ave Wcorner, also on Deer Park Cres

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 25 rental units, built 1926More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 6 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
  • City upkeep score: 90 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: St ClairThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 30.8 m frontage≈ 50.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 6 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 251283 PRS 00 IV (Order Issued Property Standards: The heating system or unit is not in good repair and m..., 2026); 26 250934 PRS 00 IR (Property Standards, 2026); 26 249547 HEA 00 IR (Adequate Heat, 2026); and 3 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 90 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 25 units, built 1926).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 251283 PRS 00 IVClosed

    Order Issued Property Standards: The heating system or unit is not in good repair and maintained in good working condition, namely: Boiler

    Oct 7, 2026 · 80 ST CLAIR AVE W
  • By-law investigation26 250934 PRS 00 IRClosed

    Property Standards

    Oct 7, 2026 · 80 ST CLAIR AVE W
  • By-law investigation26 249547 HEA 00 IRClosed

    Adequate Heat

    Oct 5, 2026 · 80 ST CLAIR AVE W
  • By-law investigation26 248896 HEA 00 IRClosed

    Adequate Heat

    Oct 3, 2026 · 80 ST CLAIR AVE W
  • By-law investigation26 167728 PRS 00 IVClosed

    Order Issued Property Standards: Driveway(s) and/or similar areas not maintained. Namely: potholes, uneven surfaces.; The fence, screen and/or other enclosure around or on the property is not being maintained in good repair.

    Apr 6, 2026 · 80 ST CLAIR AVE W
  • By-law investigation26 139352 PRS 00 IRClosed

    Property Standards

    Apr 6, 2026 · 80 ST CLAIR AVE W
  • By-law investigation25 193777 WST 00 IRClosed

    Waste

    Jul 15, 2025 · 80 ST CLAIR AVE W
  • Building permit19 213412Closed

    Proposed installation of a new back flow prevention device for an existing apartment building.

    Sep 27, 2019 · 80 ST CLAIR AVE W
Show 5 older records
  • Zoning review16 173444 LTOClosed
    Jun 14, 2016 · 80 ST CLAIR AVE W
  • Building permit10 271122Closed

    permit for one 3" backflow valve in basement of existing apartment building. PLEASE NOTE THAT THE ADDRESS IS ACTUALLY 80 ST CLAIR AVE ( EAST) NOT WEST

    Jan 21, 2011 · 80 ST CLAIR AVE W
  • Building permit00 365096Cancelled

    Install H.V.A.C in connection with B.P. # 00-1144789.For Plans see P. # 00-144789.

    Nov 15, 2005 · 80 ST CLAIR AVE W
  • Zoning review04 168967 LTOClosed
    Aug 25, 2004 · 80 ST CLAIR AVE W
  • Building permit00 144789Cancelled

    construct 5th and 6th floor addition. see Committee of Adjustments decision. Granted on Condition. see letter of OMB dated July 21st, 1999 (withdrawn appeal). edc

    Sep 18, 2001 · 80 ST CLAIR AVE W

Check before you build

  • Site-specific exception 900.2.10(759)

    Needs a closer look

    4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(759)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 2 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 262 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 263 of former City of Toronto By-law 438-86

  4. Older by-law D

    Section 12(2) 267 of former City of Toronto By-law 438-86

6 parts for other addresses
  • E On 15 Delisle Ave., former City of Toronto by-laws 182-72 and 765-85
  • F On 33 Delisle Ave., the even numbered addresses of 48-50 St. Clair Ave. W., former City of Toronto by-law 541-93
  • G On 55 Delisle Ave., City of Toronto by-law 184-99
  • H On the lands municipally known as 70 Delisle Ave., Section 12 (2) 18 of former City of Toronto By-law 438-86
  • I On 70 Delisle Ave., former City of Toronto by-law 419-67
  • J On 112 St. Clair Ave. W., former City of Toronto by-law 379-67.
By-law 569-2013, Chapter 900

Lot facts

Area
1,010 m²
Frontage
30.8 mestimated, irregular lot
Depth
50.9 mestimated, irregular lot
Street
St Clair Ave W
Corner lot
Yes, also on Deer Park Cres50.9 m along it
Public lane
None
House footprint
594 m²roof up to 17.6 m
Back yard
3.8 mhouse to rear lot line
Side yards
1.8 m and 3.3 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: St Clair. The lot is inside the St Clair Major Transit Station Area approved by the Province (Site and Area Specific Policy 721). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d2.0) (x759) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: linden, littleleaf (64 cm), spruce, colorado blue (32 cm), spruce, colorado blue (24 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
96%27 of 28 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
13

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit additional uses within the existing two-storey non-residential detached building.

    8 LAWTON BLVD · Sep 9, 2026 · 446 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a front two-storey addition (above existing garage located at the basement level), and to replace the existing rear deck with a new covered deck and stairs (including new stairs for the basement walkout).

    23 LONSDALE RD · Jun 10, 2026 · 470 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition. Also, to reconstruct a portion of the front lower level for the use of an integral one-car garage.

    64 BALMORAL AVE · Dec 9, 2025 · 285 m away
  • Minor varianceApproved

    To alter the existing three-storey semi-detached dwelling (basement level is considered the first storey) by constructing a front two-storey addition (above the existing integral garage), a complete fourth storey addition with front and rear balconies, and a new roof over the existing rear second level deck.

    21 LONSDALE RD · Oct 15, 2025 · 472 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partially enclosed front porch with a canopy and stairs, and a rear covered (trellis) deck with stairs. Also, to reconstruct the rear third storey dormer.

    18 FOXBAR RD · Jul 23, 2025 · 268 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    30 ST CLAIR AVE W · Oct 28, 2027 · 266 m away
  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    40 ST CLAIR AVE W · Oct 28, 2027 · 235 m away
  • Building permit

    Proposed localized concrete repairs for an underground parking garage

    45 ST CLAIR AVE W · Nov 24, 2026 · 248 m away
  • Minor variancePending

    Accepted

    103 HEATH ST W · Nov 20, 2026 · 199 m away
  • Building permit

    Revision 01: replacing existing porch structure. PROPOSAL TO REPLACE THE EXISTING FRONT WOOD PORCH WIITH CONCRETE PORCH

    66 BALMORAL AVE · Nov 10, 2026 · 279 m away
  • Building permit

    Interior alteration to convert an existing Group D office occupancy to a Group D nail salon (beautyparlour/personal service use). Building, Plumbing and HVAC included.

    55 ST CLAIR AVE W · Nov 9, 2026 · 138 m away
  • Building permit

    Proposal for interior alterations including new furniture layout, new finishes, and new partitions for meeting rooms.

    95 ST CLAIR AVE W · Nov 3, 2026 · 81 m away
  • Building permit

    Proposal to install one (1) electromagnetic lock

    101 ST CLAIR AVE W · Oct 26, 2026 · 136 m away
  • Building permit

    Proposal for interior alterations & new partitions to existing office space. Unit TBD

    55 ST CLAIR AVE W · Oct 15, 2026 · 138 m away
  • Building permit

    Structural fire damage restoration.

    68 BALMORAL AVE · Oct 14, 2026 · 282 m away

Neighbourhood: Yonge-St.Clair

About the area around the lot, not the lot itself.

Nearest station
St. Clair Station6 min walk
Nearest TTC stop
St Clair Ave West at Deer Park Cres West Side1 min walk
Nearest cycling route
Balmoral AveSigned Route (No Pavement Markings), 5 min walk
Nearest traffic count
15,303 vehicles in 14 hSt Clair Ave W / Deer Park Cres, 50 m away, Oct 18, 2025
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 2 with cyclists
Parks
Amsterdam Square3 min walk
Glenn Gould Park4 min walk
Yorkminster Park Baptist Church Park7 min walk

Schools within 1 km

  • BROWN JR PUBLIC SCHOOL English Public 6 min walk
  • THE LINDEN SCHOOL Private 8 min walk
  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 9 min walk
  • THE YORK SCHOOL - JR CAMPUS Private 9 min walk
  • UPPER CANADA COLLEGE SCHOOL Private 10 min walk
  • DE LASALLE COLLEGE SCHOOL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-St.ClairMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home40%54%
Population (2021)12,90516,813
Homes built in 1960 or before45%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-St.ClairCity median
Assault270.8636.3
Robbery25.869.5
Auto theft64.5192.6
Theft over $5,00032.246.1
Break and enter374172.8
Theft from vehicles116.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.