HousePrecheckCheck an address

80 Sackville StToronto · zoning, lot size and permit records

69.3 × 88.0 m6,032 m²on Queen St Ecorner, also on Sackville St

Not a home

St Paul Catholic Elementary School

The City's school locations place St Paul Catholic Elementary School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelRecent records on this lot: 25 182224 (Proposal for replacement of the fire alarm system throughout the school with new, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 10 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N50 m
69.3 m frontage88.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2012

    Needs a closer look

    Still open in the City's records: 12 183880 (HVAC - Proposal for interior alterations to second floor to create a new kindergarten r..., 2012, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 182224 (Proposal for replacement of the fire alarm system throughout the school with new, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 10 development applications open within 300 m

    Good to know

    10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit25 182224Permit Issued

    Proposal for replacement of the fire alarm system throughout the school with new.

    Jul 15, 2025 · 80 SACKVILLE ST
  • Building permit25 121419Closed

    Plumbing - Proposal for all existing washrooms to be renovated. Voluntary upgrade to barrier-free washrooms.

    Jun 10, 2025 · 80 SACKVILLE ST
  • Building permit22 218131Closed

    Installation of new air conditioning units for cooling centre in gym

    Nov 14, 2022 · 80 SACKVILLE ST
  • Building permit15 166550Closed

    Proposal to install a 3" back flow prevention device, "St Paul Elementary Scool"

    Jun 30, 2015 · 80 SACKVILLE ST
  • Zoning review12 205915 ZPRClosed
    Jul 5, 2012 · 80 SACKVILLE ST
  • Building permit12 183880Inspection

    HVAC - Proposal for interior alterations to second floor to create a new kindergarten room with washroom for existing elementary school "St Paul's Catholic School" (146m2).

    Jun 19, 2012 · 80 SACKVILLE ST
  • Zoning review06 172714 ZPUClosed
    Sep 1, 2006 · 80 SACKVILLE ST
  • Building permit06 127781Closed

    Interior alterations to existing Elementary School to convert a classroom into a daycare.

    May 5, 2006 · 80 SACKVILLE ST
Show 1 older records
  • Building permit06 112200Closed

    Make interior alterations to classroom on ground floor for daycare centre.

    Mar 3, 2006 · 80 SACKVILLE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
6,032 m²
Frontage
69.3 m
Depth
88 m
Street
Queen St E
Corner lot
Yes, also on Sackville St88 m along it
Public lane
None
House footprint
1,375 m²roof up to 18.4 m
Back yard
2.9 mhouse to rear lot line
Side yards
0.3 m and 1.7 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: ginkgo (10 cm), kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
87%27 of 31 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
3
Development applications
25

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 31 variance decisions: more than at 64% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.

    53 ONTARIO ST · Sep 23, 2026 · 435 m away
  • Minor varianceApproved

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 241 m away
  • Minor varianceApproved

    The existing undersized public parking lot will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 241 m away
  • Minor varianceApproved

    To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

    14 EASTERN AVE · May 6, 2026 · 314 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 1299-2023) for a mixed-use building (45 and 49-storeys), by increasing the total building height, the height of the podium, and mechanical penthouse vertical projections, equipment, structures and screening, and cladding encroachments of Building A. Also, to reduce the number of bicycle parking spaces and to alter the bicycle parking locations. A related Site Plan Approval application (under File Number 21 148154 STE 13 SA) is currently under review and consideration. There will be a total of 1,227 residential dwelling units (including approximately 245 affordable housing units) on this lot.

    49 ONTARIO ST · Aug 13, 2025 · 446 m away

Latest activity nearby

  • Building permit

    Proposal to add new washrooms on ground floor and second floor, finish basement, and interior alteration to add load bearing beams in basement and on ground floor.

    13 BRIGHT ST · Nov 24, 2026 · 203 m away
  • Zoning review

    Under Review

    339 QUEEN ST E · Nov 6, 2026 · 235 m away
  • Zoning review

    Closed

    10 EASTERN AVE · Oct 28, 2026 · 297 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 23, 2026 · 186 m away
  • Zoning review

    Application Acceptable

    398 KING ST E · Oct 14, 2026 · 173 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 7, 2026 · 186 m away
  • Minor variancePending

    To alter the existing two-storey townhouse dwelling by constructing a side (west) third storey staircase enclosure, a rooftop deck with guardrails (wooden fence), and a rooftop pergola.

    21 SACKVILLE ST · Oct 5, 2026 · 247 m away
  • Building permit

    REVISION - revised drawingsProposed commercial kitchen ventilation system.

    368 QUEEN ST E · Oct 5, 2026 · 163 m away
  • Zoning review

    Cancelled

    10 EASTERN AVE · Sep 29, 2026 · 297 m away
  • Consent (lot split)Approved

    To obtain consent to sever the property into three lots, and to maintain the existing easement/right-of-way.

    4 GILEAD PL · Sep 9, 2026 · 241 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station23 min walk
Nearest TTC stop
Queen St East at Sackville St1 min walk
Nearest cycling route
Shuter StCycle Track, 3 min walk
Nearest traffic count
7,538 vehicles in 14 hQueen St E / Sackville St, 80 m away, Sep 10, 2025
Serious collisions within 500 m
72021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 2 with cyclists
Parks
Orphan's Green1 min walk
Sackville Playground2 min walk
Bright Street Playground3 min walk

Schools within 1 km

  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 1 min walk
  • LIBERTY PREP SCHOOL Private 4 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 4 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 5 min walk
  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 10 min walk
  • VOICE INTEGRATIVE PRIVATE SCHOOL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.