HousePrecheckCheck an address

80 Progress AveToronto · zoning, lot size and permit records

Employment · E 0.7≈ 346.5 × 230.8 m49,106 m²on Progress Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 21 186102 (Proposal for raising a portion (200'by48') of the existing roof for 13', 2021, status Inspection); 15 137267 (Proposed installation of new sanitary maintenance access hole over existing 150 mm sani..., 2015, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 346.5 m frontage≈ 230.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (48% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (13% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 2 building permits open, the oldest since 2015

    Needs a closer look

    Still open in the City's records: 21 186102 (Proposal for raising a portion (200'by48') of the existing roof for 13', 2021, status Inspection); 15 137267 (Proposed installation of new sanitary maintenance access hole over existing 150 mm sani..., 2015, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (22% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit21 186102Inspection

    Proposal for raising a portion (200'by48') of the existing roof for 13'

    Sep 7, 2021 · 80 PROGRESS AVE
  • Building permit15 137267Inspection

    Proposed installation of new sanitary maintenance access hole over existing 150 mm sanitary sewer line - Atlantic Packaging Products Ltd

    Apr 22, 2015 · 80 PROGRESS AVE
  • Building permit10 316079Closed

    installation of roof top solar system

    Feb 22, 2011 · 80 PROGRESS AVE
  • Building permit09 197981Closed

    installation of backfloow preventor Atlantic Packaging

    Jan 8, 2010 · 80 PROGRESS AVE
  • Zoning review08 217607 ZPUClosed
    Oct 30, 2008 · 80 PROGRESS AVE

Lot facts

Area
49,106 m²
Frontage
346.5 mestimated, irregular lot
Depth
230.8 mestimated, irregular lot
Street
Progress Ave
Corner lot
No
Public lane
None
House footprint
22,385 m²roof up to 17.5 m
Back yard
36.3 mhouse to rear lot line
Side yards
43 m and 98.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 0.7 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the use of a educational tutoring center for children ages 3-14.

    2199 MIDLAND AVE · Jul 26, 2023 · 391 m away
  • Minor varianceApproved

    To construct a one-storey addition to the rear of the existing industrial building.

    16 COSENTINO DR · Aug 4, 2016 · 497 m away

Latest activity nearby

  • Building permit

    Proposal to Install a 30'x50' Temporary Tent for The Brick's semi-annual sale. Installation Date: August 31, 2026Removal Date: Septebmer 21, 2026

    19 WILLIAM KITCHEN RD · Aug 12, 2026 · 238 m away
  • Zoning review

    Closed

    60 PROGRESS AVE · Jun 17, 2026 · 159 m away
  • Building permit

    Proposal to Install a 30'x50' Temporary Tent for The Brick's semi-annual sale. Date of Install April 27, 2026Date of Removal May 17 2026

    19 WILLIAM KITCHEN RD · Mar 24, 2026 · 238 m away
  • Building permit

    1 WALL SIGN**ROCKET BEAR PLAYGROUND & ROLLERSKATE***UNIT J3*

    11 WILLIAM KITCHEN RD · Mar 5, 2026 · 283 m away
  • Building permit

    Proposed interior demolition of existing mezzanine.

    111 PROGRESS AVE · Feb 20, 2026 · 247 m away
  • Building permit

    1 WALL SIGN**ROCKET BEAR PLAYGROUND & ROLLER SKATE**

    11 WILLIAM KITCHEN RD · Feb 11, 2026 · 283 m away
  • Building permit

    1 Wall Sign

    11 WILLIAM KITCHEN RD · Jan 21, 2026 · 283 m away
  • Building permit

    Proposal to Install a 30'x50' Temporary Tent for The Brick's semi-annual sale from 2025-08-20 to 2025-09-15.

    19 WILLIAM KITCHEN RD · Aug 14, 2025 · 238 m away
  • Building permit

    Proposal for Interior alteration includes demolition of existing premises, installation of new partitions, and the addition of a new plumbing

    35-45 PROGRESS AVE · Jul 21, 2025 · 281 m away
  • Zoning review

    Closed

    60 PROGRESS AVE · Apr 22, 2025 · 159 m away

Neighbourhood: Dorset Park

About the area around the lot, not the lot itself.

Nearest station
Agincourt GO Station24 min walk
Nearest TTC stop
80 Progress Ave1 min walk
Nearest traffic count
9,691 vehicles in 8 hProgress Ave: William Kitchen Rd - Midland Ave, 160 m away, Feb 23, 2022
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Jolly Way Park11 min walk
Glamorgan Park11 min walk
Metrogate Park13 min walk

Schools within 1 km

  • ENQUIRING MINDS MONTESSORI AND LONDON SCHOOL OF DANCE Private 5 min walk
  • CENTENNIAL COLLEGE - MIDLAND CAMPUS College 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDorset ParkMedian neighbourhood
Median household income (2020)$79,000$84,500
Households that own their home60%54%
Population (2021)24,30516,813
Homes built in 1960 or before26%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDorset ParkCity median
Assault672636.3
Robbery112.669.5
Shootings18.210.5
Auto theft356192.6
Theft over $5,00072.646.1
Break and enter192.5172.8
Theft from vehicles334.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.