Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (24% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitNatural Heritage System (6% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 93 Committee of Adjustment files on this lot
Good to know3 approved. B012/15SC (This application is for a proposal to sever the industrial property at 80 & 90 Nugget A..., 2015); B020/13SC (Proposed consent to sever the industrial property at 80 & 90 Nugget Avenue into two lot..., 2013); A065/13SC (The owners are requesting consent to sever the land to create separate lots for the ind..., 2013).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)2 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
13 records on file: more than at 100% of Toronto houses (median 0).
- Zoning review19 227044 ZZUClosedSep 25, 2019 · 80 NUGGET AVE
- Building permit16 235806Closed
install RP backflow preventor
Nov 2, 2016 · 80 NUGGET AVE - Building permit16 223647Closed
install 3/4" DCVA backflow preventor
Oct 18, 2016 · 80 NUGGET AVE - Zoning review15 260968 LPRClosedDec 4, 2015 · 80 NUGGET AVE
- Building permit15 201990Cancelled
Proposed interior alterations to office, showroom and lunch room.
Oct 26, 2015 · 80 NUGGET AVE - Zoning review15 210055 LTOClosedAug 20, 2015 · 80 NUGGET AVE
- Zoning review15 179944 ZZUClosedJun 24, 2015 · 80 NUGGET AVE
- Consent (lot split)B012/15SCApproved
This application is for a proposal to sever the industrial property at 80 & 90 Nugget Avenue into two lots and to establish a mutual right-of-way for shared access. The proposed lots are shown on the attached draft R-Plan as Parts 1 & 2 (80 Nugget Avenue); and Parts 3 & 4 (90 Nugget Avenue). A proposed mutual right-of-way would provide access to the properties over Parts 2 and 3.
Apr 16, 2015 · 80 NUGGET AVE
Show 5 older records
- Zoning review14 156725 ZZUClosedMay 14, 2014 · 80 NUGGET AVE
- Zoning review13 275130 ZZUCancelledDec 6, 2013 · 80 NUGGET AVE
- Consent (lot split)B020/13SCApproved
Proposed consent to sever the industrial property at 80 & 90 Nugget Avenue into two lots and to establish a mutual right-of-way on Parts 2 and 3 for access. The proposed lots are shown on the attached draft R-Plan as Parts 1 & 2 (80 Nugget Avenue); and Parts 3 & 4 (90 Nugget Avenue).
Jul 11, 2013 · 80 NUGGET AVE - Minor varianceA065/13SCApproved
The owners are requesting consent to sever the land to create separate lots for the industrial properties at 80 and 90 Nugget Avenue, and applied for a variance for the lot to be severed at 80 Nugget Avenue. The proposed lots are shown on the attached draft R-Plan as Parts 1 & 2 (80 Nugget Avenue) and Parts 3 & 4 (90 Nugget Avenue).
Jul 11, 2013 · 80 NUGGET AVE - Building permit05 105463Closed
new overhead door existing use: industrial (fedex shipping) proposed use: industrial
Mar 21, 2005 · 80 NUGGET AVE
Check before you build
Site-specific exception 900.22.10(11)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
Despite regulation 60.30.20.10(1) the following uses are not permitted: Asphalt Plant; Hazardous substance manufacturing, processing or warehousing; Abattoir, Slaughterhouse or Rendering of Animals Factory; and Waste Transfer Station . Prevailing By-laws and Prevailing Sections: (None Apply)
- Older by-law A
Despite regulation 60.30.20.10(1) the following uses are not permitted: Asphalt Plant; Hazardous substance manufacturing, processing or warehousing; Abattoir, Slaughterhouse or Rendering of Animals Factory; and Waste Transfer Station . Prevailing By-laws and Prevailing Sections: (None Apply)
Lot facts
- Area
- 5,896 m²
- Frontage
- 40.1 m
- Depth
- 170.8 m
- Street
- Nugget Ave
- Corner lot
- No
- Public lane
- None
- House footprint
- 2,803 m²roof up to 9.3 m
- Back yard
- 45 mhouse to rear lot line
- Side yards
- 4.9 m and 7.8 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone EH 0.7 (x11) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 2
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Interior alterations and installation of racking systems within an existing industrial warehouse unit.
105 NUGGET AVE · Oct 28, 2026 · 151 m away - Building permit
Proposal for interior alterations for new Group D use (classrooms) - UNIT 5
55 NUGGET AVE · Sep 16, 2026 · 172 m away - Building permit
Revision: Proposed interior alterations to food processing facility - unit 7, 8, and 9
60 NUGGET AVE · Sep 10, 2026 · 56 m away - Building permit
In this scope, one proposed 50mm water service chamber with a reducer, backflow preventor and meter will be installed as per City standard T-1107.01-01. A 50mm Copper, type K service line will also be installed on the 20 Nugget property. This is meant to support the construction activities taking place on this site.
20 NUGGET AVE · Aug 17, 2026 · 166 m away - Development application
Proposed Official Plan Amendment seeks to redesignate the subject site from General Employment Areas to Mixed Use Areas. The proposal is being brought forward on a land use basis only and does not seek to establish site-specific performance standards for future development.
1928 MCCOWAN RD · Dec 24, 2025 · 286 m away · City file - Building permit
Proposal to reconstruct roof and facade for the front office of the warehouse.
100 NUGGET AVE · Jun 11, 2025 · 87 m away - Building permit
Portable Office at the construction site at 1901 McCowan Road for Launch Shaft 1 (LS-1) construction for the Advanced Tunnel for Scarborough Subway Extension project.
1901 MCCOWAN RD · Jun 9, 2025 · 275 m away - Building permit
1 Groun Sign
55 NUGGET AVE · Jun 5, 2025 · 172 m away - Zoning review
Application On Hold
100 NUGGET AVE · Feb 5, 2025 · 87 m away - Zoning review
Notice Sent
95 NUGGET AVE · Jun 26, 2024 · 142 m away
Neighbourhood: Agincourt South-Malvern West
About the area around the lot, not the lot itself.
- Nearest station
- McCowan Rt Station35 min walk
- Nearest TTC stop
- 105 Nugget Ave2 min walk
- Nearest cycling route
- Huntingwood DrCycle Track, 11 min walk
- Nearest traffic count
- 37,157 vehicles in 14 hMcCowan Rd / Nugget Ave, 260 m away, Oct 16, 2024
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- White Haven Park12 min walk
- Farquharson Park15 min walk
Schools within 1 km
- EXCEL HIGH SCHOOL Private 3 min walk
- AFZAL ISLAMIC MONTESSORI & ACADEMY Private 9 min walk
- CANADIAN TAMIL ACADEMY Private 14 min walk
- TOWN CENTRE LINC English Public 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Agincourt South-Malvern West | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $79,500 | $84,500 |
| Households that own their home | 70% | 54% |
| Population (2021) | 24,170 | 16,813 |
| Homes built in 1960 or before | 10% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Agincourt South-Malvern West | City median |
|---|---|---|
| Assault | 467 | 636.3 |
| Robbery | 94.8 | 69.5 |
| Homicide | 7 | 5.3 |
| Shootings | 21.1 | 10.5 |
| Auto theft | 273.9 | 192.6 |
| Theft over $5,000 | 38.6 | 46.1 |
| Break and enter | 259.9 | 172.8 |
| Theft from vehicles | 242.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.