HousePrecheckCheck an address

80 Mill StToronto · zoning, lot size and permit records

Commercial residential · CR SS2 (x344)66.5 × 30.5 m2,015 m²on Mill Stbacks onto Ln S Front E Trinity

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 4 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CorktownThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
66.5 m frontage30.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Zoning): 26 184279 ZON 00 IR (Zoning, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 184279 ZON 00 IRClosed

    Zoning

    Jun 15, 2026 · 80 MILL ST
  • By-law investigation26 160476 WST 00 IRClosed

    Waste

    May 14, 2026 · 80 MILL ST
  • Building permit22 123757Closed

    Proposal to update existing window's sprinkler on both sides.

    Apr 20, 2022 · 80 MILL ST
  • Building permit21 204120Closed

    Proposal for connection of automatic Door Opener Operators to Fire Alarm System to Prevent over pressurization in the west stairwell in the event of a Fire.

    Sep 21, 2021 · 80 MILL ST
  • Building permit15 191416Closed

    Plumbing - Interior alterations to unit 1111 to create a new barrier free washroom.

    May 10, 2021 · 80 MILL ST
  • Development application20 138391 STE 13 SAClosed

    Site Plan application to permit the development of two 13-storey and one 12-storey mixed use buildings at 373 Front Street East and 90 Mill Street (Blocks 3,4,7 in the West Don Lands). The proposal consists of 3,027 square metres of retail space, 496 square metres of community agency space, and 855 rental dwelling units (257 of which are affordable rental dwelling units). Zoning was approved via MZO O.Reg. 596/20 on October 22, 2020.

    Apr 24, 2020 · 90 MILL ST · City file
  • Development application20 138382 STE 13 OZClosed

    Zoning By-law Amendment application to lift the H at 373 Front Street East and 90 Mill Street (Blocks 3,4,7 in the West Don Lands). Zoning was approved via MZO O.Reg. 596/20 on October 22, 2020.

    Apr 24, 2020 · 90 MILL ST · City file
  • Development application19 228307 STE 13 OZClosed

    Zoning By-law Amendment application to permit the development of two 13-storey and one 12-storey mixed use buildings at 373 Front Street East and 90 Mill Street (Blocks 3,4,7 in the West Don Lands). The proposal consists of 3,027 square metres of retail space, 496 square metres of community agency space, and 855 rental dwelling units (257 of which are affordable rental dwelling units). Zoning was approved via MZO O.Reg. 596/20 on October 22, 2020.

    Sep 27, 2019 · 90 MILL ST · City file
Show 6 older records
  • Building permit19 211970Closed

    Proposal to replace fire alarm panel in existing apartment building.

    Sep 23, 2019 · 80 MILL ST
  • Building permit19 127752Closed

    Proposal to replace 52 windows on the east elevation of existing apartment building.

    Apr 8, 2019 · 80 MILL ST
  • Building permit15 201724Closed

    Proposal for interior alterations to unit 509 to remove two walls

    Aug 10, 2015 · 80 MILL ST
  • Zoning review11 323968 ZPUClosed
    Dec 9, 2011 · 80 MILL ST
  • Building permit10 308756Closed

    Proposal to convert existing laundry room into washroom.

    Dec 9, 2010 · 80 MILL ST
  • Zoning review00 163264 000Closed
    Jun 19, 2000 · 80 MILL ST

Check before you build

  • Site-specific exception 900.11.10(344)

    Needs a closer look

    1 site-specific rule and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(344)Applies

These parts of the exception apply to this lot's address.

  1. Rule

    None

  2. Older by-law A

    Section 12 (2) 132 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12 (2) 270 (a) of former City of Toronto By-law 438-86

  4. Older by-law C

    Section 12 (2) 287 of former City of Toronto By-law 438-86

  5. Older by-law D

    City of Toronto By-law 396-1994

  6. Older by-law E

    City of Toronto By-law 749-2003

  7. Older by-law F

    City of Toronto By-law 5-2010.

By-law 569-2013, Chapter 900

Lot facts

Area
2,015 m²
Frontage
66.5 m
Depth
30.5 m
Street
Mill St
Corner lot
No
Public lane
Ln S Front E Trinity, 25.3 m along it
Max height
23 m
Max lot coverage
—
  • Major Transit Station Area: Corktown. The lot is inside the Corktown Major Transit Station Area approved by the Province (Site and Area Specific Policy 764). Source
  • King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR SS2 (x344) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
23

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 323 m away
  • Minor varianceApproved

    The existing undersized public parking lot will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 323 m away
  • Minor varianceApproved

    To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

    14 EASTERN AVE · May 6, 2026 · 245 m away
  • Minor varianceApproved

    To alter the development standards for a 41-storey mixed-use building (as approved under Site Specific Zoning By-laws 512-2022(OLT) and 513-2022(OLT)) currently under construction, by increasing the building height, the total gross floor area, and the total number of dwelling units. Also, to reduce the minimum required outdoor and indoor amenity spaces, minimum required parking spaces for residents and visitors, minimum required accessible parking spaces, and the minimum required width of obstructed parking spaces. This new mixed-use building will have 46-storeys and will contain a total of 467 residential dwelling units.

    31 PARLIAMENT ST · Feb 19, 2025 · 359 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 389-2023 (OLT)), for a 33-storey mixed-use building, with a 9-storey podium, and three levels of underground parking.

    33 PARLIAMENT ST · Sep 6, 2023 · 348 m away

Latest activity nearby

  • Building permit

    2 wall signs + 1 projecting sign**PUR & SIMPLE**

    373 FRONT ST E · Nov 19, 2026 · 86 m away
  • Zoning review

    Not Started

    16 EASTERN AVE · Nov 6, 2026 · 243 m away
  • Zoning review

    Closed

    455 FRONT ST E · Oct 29, 2026 · 208 m away
  • Zoning review

    Closed

    10 EASTERN AVE · Oct 28, 2026 · 271 m away
  • Building permit

    2 wall signs + 1 projecting sign**PUR & SIMPLE**

    373 FRONT ST E · Oct 7, 2026 · 86 m away
  • Zoning review

    Closed

    14 EASTERN AVE · Oct 5, 2026 · 245 m away
  • Zoning review

    Cancelled

    10 EASTERN AVE · Sep 29, 2026 · 271 m away
  • Zoning review

    Closed

    281 FRONT ST E · Sep 28, 2026 · 286 m away
  • Zoning review

    Closed

    55 MILL ST · Sep 21, 2026 · 133 m away
  • Building permit

    Proposal to construct an exterior deck floating above the existing roof structure.Address includes 8, 10, and 12 Trinity St.

    55 MILL ST · Sep 14, 2026 · 133 m away

Neighbourhood: St Lawrence-East Bayfront-The Islands

About the area around the lot, not the lot itself.

Nearest station
King Station26 min walk
Nearest TTC stop
Mill St at Cherry St West Side1 min walk
Nearest cycling route
Mill StBi-Directional Cycle Track, 1 min walk
Nearest traffic count
8,484 vehicles in 14 hMill St / Cherry St, 80 m away, Aug 15, 2026
Serious collisions within 500 m
72021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
Diamond Jubilee Promenade4 min walk
Little Trinity Church Lands5 min walk
Parliament Square Park6 min walk

Schools within 1 km

  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 1 min walk
  • VOICE INTEGRATIVE PRIVATE SCHOOL Private 3 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 5 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • MARKET LANE JR & SR PUBLIC SCHOOL English Public 9 min walk
  • LIBERTY PREP SCHOOL Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home40%54%
Population (2021)31,28516,813
Homes built in 1960 or before3%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
Assault1059.7636.3
Robbery96.369.5
Shootings4.510.5
Auto theft24.6192.6
Theft over $5,00078.446.1
Break and enter163.5172.8
Theft from vehicles163.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.