HousePrecheckCheck an address

80 John StToronto · zoning, lot size and permit records

Commercial residential employment · CRE (x89)≈ 29.0 × 27.3 m527 m²on John Stbacks onto Ln N King W John

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 25 160842 (New louver enclosure to existing building, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 26 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Queen-SpadinaThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N10 m
≈ 29.0 m frontage≈ 27.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2021

    Needs a closer look

    Still open in the City's records: 21 178016 (Interior alterations to core drill hole in slab and tie linear drain to existing drain..., 2021, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 160842 (New louver enclosure to existing building, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 26 development applications open within 300 m

    Good to know

    26 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 2 short-term rental registrations here

    Good to know

    2 active short-term rental registrations at this address (Condominium).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit25 195320Closed

    Proposal for interior alterations to create a storage room at ground level lobby.

    Sep 8, 2025 · 80 JOHN ST
  • Building permit25 160842Inspection

    New louver enclosure to existing building.

    Aug 22, 2025 · 80 JOHN ST
  • Building permit21 178016Permit Issued

    Interior alterations to core drill hole in slab and tie linear drain to existing drain - unit 4202

    Jul 14, 2021 · 80 JOHN ST

Check before you build

  • Site-specific exception 900.12.10(89)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.12.10(89)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 270 of former City of Toronto By-law 438-86

  2. Older by-law B

    On or between the even numbered addresses of 326-360 King St. W., and 80 John St., City of Toronto by-laws 908-00 and 454-04.

By-law 569-2013, Chapter 900

Lot facts

Area
527 m²
Frontage
29 mestimated, irregular lot
Depth
27.3 mestimated, irregular lot
Street
John St
Corner lot
No
Public lane
Ln N King W John, 19.2 m along it
Max height
30 m
Max lot coverage
—
  • Major Transit Station Area: Queen-Spadina. The lot is inside the Queen-Spadina Major Transit Station Area approved by the Province (Site and Area Specific Policy 762). Source
  • King-Spadina Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: John Street, King Street West. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CRE (x89) (Commercial Residential Employment). Chapter 50, section 50.10 of the by-law. Source

Around this lot

Minor variances approved
97%32 of 33 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
51

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 33 variance decisions: more than at 67% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards, as approved under Site Specific Zoning By-law 135-2026 (OLT), for the 60-storey mixed-use building by converting the office spaces into residential units from floors 3 to 7, and to increase the number of storeys to 65-storeys; the building height from 202.5 m to 214 m (including the mechanical penthouse); and the maximum gross floor area. This is currently under the review of Site Plan Control (File No. 20 233433 STE 10 SA). There will be a total of 807 residential dwelling units on this lot.

    277 WELLINGTON ST W · Apr 15, 2026 · 279 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 105-2022 (OLT)) for a 47-storey mixed-use building (containing 432 residential dwelling units, retail use on the ground level, and office use on second, third and fourth levels), by reducing the required number of vehicular parking spaces for the residents of this building.

    263 ADELAIDE ST W · Jan 28, 2026 · 108 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1219-2023(OLT) for a 61-storey mixed-use building, by increasing the building height to 67-storeys (223 m), the maximum gross floor area (residential and overall), a wind damper enclosure projection beyond the maximum building height, as well as to reduce the minimum non-residential gross floor area (remove the office uses), and reduce the number of loading spaces. There will be a total of 1,003 residential dwelling units on this lot (including 46 affordable units), subject to review under the related Site Plan Control Application (File 20 22 119164 STE 10 SA).

    100 SIMCOE ST · Sep 10, 2025 · 307 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-laws 1061-2014 and 1062-2014) for a 36-storey mixed-use building, to increase the maximum permitted residential gross floor area, and to reduce the rate of ¿short term¿ bicycle parking spaces on-site.

    57 SPADINA AVE · Jul 23, 2025 · 411 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-laws 754-2021(OLT) and 757-2021(OLT)) for the 49-storey mixed-use building (currently under construction) by increasing the overall building height, and the total number of dwelling units from 612 to 630 units (by redesigning the penthouse units located on the 47, 48, and 49 floors into smaller units that will be accessed by the elevator overrun structure). Also, to reduce the number of parking spaces on-site.

    400 KING ST W · Nov 27, 2024 · 263 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-law 439-87), for the 19-storey hotel building by converting the office space into hotel suites from floors 2 to 8, increasing the number of hotel suites from 394 to 644, increasing the maximum gross floor area, and to reduce the total number of parking spaces from 338 to 323 (with 11 parking spaces located at-grade and 312 parking spaces located on parking levels 1 to 4). This application is subject to a Site Plan Control application, which has not yet been submitted by the landowner(s).

    370 KING ST W · Nov 25, 2026 · 139 m away
  • Building permit

    Proposal for interior alterations on level 1 mezzanine of existing hotel. Work to include demolition of existing millwork, glass partitions of wine storage room, and indicated sections of the ceiling. Construction of new partitions, floor finishes, ceilings, millwork, and light fixtures.

    181 WELLINGTON ST W · Nov 23, 2026 · 294 m away
  • Building permit

    1 Ground Sign + 1 Overhanging Structure Sign ** MARIO FRESH FOOD/REXALL/HEALTHONE/FITLIFE**

    200 WELLINGTON ST W · Nov 23, 2026 · 215 m away
  • Building permit

    1 Ground Sign + 1 Overhanging Structure Sign ** MARIO FRESH FOOD/REXALL/HEALTHONE/FITLIFE **

    200 WELLINGTON ST W · Nov 23, 2026 · 215 m away
  • Building permit

    Proposed interior alterations to existing shower rooms.

    200 WELLINGTON ST W · Nov 19, 2026 · 215 m away
  • Building permit

    INTERIOR ALTERATION OF EXISITNG OFFICE SPACE. WORK WILL INCLUDE IMPROVEMENT AND MODIFICATIONS TO AN EXISTING FLOOR. THERE WILL BE CONSTRUCTION OF NON-LOADBEARING PARTITIONS, AS WELL AS MINOR REALIGNMENT REDISTRIBUTION OF ELECTRICAL, MECHANICAL AND LIFE SAFETY SYSTEMS.

    111 PETER ST · Nov 19, 2026 · 233 m away
  • Building permit

    Proposed interior alterations to an existing retail shell space.

    99 BLUE JAYS WAY · Nov 18, 2026 · 222 m away
  • Building permit

    1 projecting sign**PIZZA BAR**

    230 WELLINGTON ST W · Nov 18, 2026 · 175 m away
  • Building permit

    Proposed interior alterations of existing office for new model suite fit-out - UNIT 403

    217 RICHMOND ST W · Nov 18, 2026 · 267 m away
  • Building permit

    Proposed interior alterations of existing office to new model suite fit-out.

    217 RICHMOND ST W · Nov 18, 2026 · 267 m away

Neighbourhood: Wellington Place

About the area around the lot, not the lot itself.

Nearest station
St. Andrew Station6 min walk
Nearest TTC stop
King St West at John St West Side1 min walk
Nearest cycling route
Adelaide St WCycle Track, 2 min walk
Nearest traffic count
9,522 vehicles in 14 hKing St W / John St, 40 m away, Sep 10, 2025
Serious collisions within 500 m
132021–2026, killed or seriously injured: 2 fatal, 5 with pedestrians, 6 with cyclists
Parks
Grasett Park2 min walk
Simcoe Park5 min walk
Isabella Valancy Crawford Park6 min walk

Schools within 1 km

  • OCAD UNIVERSITY - INCLUSIVE DESIGN INSTITUTE University 9 min walk
  • OGDEN JR PUBLIC SCHOOL English Public 9 min walk
  • OCAD UNIVERSITY - STUDENT CENTRE University 9 min walk
  • OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 10 min walk
  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 11 min walk
  • OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWellington PlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home38%54%
Population (2021)25,57016,813
Homes built in 1960 or before2%29%
Homes needing major repairs1%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWellington PlaceCity median
Assault1169.6636.3
Robbery8269.5
Homicide5.35.3
Shootings10.610.5
Auto theft97.9192.6
Theft over $5,00087.346.1
Break and enter293.7172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.