Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitWork or applications in progress
Good to knowRecent records on this lot: 26 176005 (Proposal to erect temporary structures - wooden structures or modules with fabric in li..., 2026); 26 161475 STE 14 SB (Draft Plan of Subdivision to create fourteen (14) development blocks of varying sizes a..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- Zoning review26 251713 LPRClosedOct 8, 2026 · 80 COMMISSIONERS ST
- Building permit26 176005Permit Issued
Proposal to erect temporary structures - wooden structures or modules with fabric in lieu of ceilings from June 23 to December 31 2026.South Boulevard of Commissioners St, near Munitions St, in the future transit ROW
Jun 23, 2026 · 80 COMMISSIONERS ST - Development application26 161475 STE 14 SBUnder Review
Draft Plan of Subdivision to create fourteen (14) development blocks of varying sizes and configurations, and nine (9) additional blocks to facilitate new segments of the water's edge promenade and dockwall as well as a variety of publicly-accessible open spaces enable development in Ookwemin Minising.
May 15, 2026 · 80 COMMISSIONERS ST · City file - Building permit20 129972Closed
Completely Demolish the following buildings: i) Warehouse Building; ii) Administration Building iii) Security Building
Jun 25, 2020 · 80 COMMISSIONERS ST - Building permit15 123453Closed
Proposal to replace the fire alarm panel in an existing warehouse.
Mar 26, 2015 · 80 COMMISSIONERS ST - Building permit03 174636Closed
Construct new light industrial storage facility (film equipment). Temporary?
Oct 15, 2003 · 80 COMMISSIONERS ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 15,979 m²
- Frontage
- 86.3 m
- Depth
- 185.3 m
- Street
- Munition St
- Corner lot
- Yes, also on Commissioners St185.3 m along it
- Public lane
- None
- House footprint
- 3,758 m²roof up to 9.1 m
- Back yard
- 76.8 mhouse to rear lot line
- Side yards
- 14.6 m and 29.3 mhouse to side lot lines
- Buildings on the lot
- 5house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 15 City trees in front of this lot. The City's street tree inventory lists 15 trees at this address: poplar, eastern cottonwood (67 cm), poplar, white boleana (65 cm), horsechestnut (60 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%3 of 3 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 2
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a place of amusement use for the purpose of axe throwing on the ground floor of the existing two-storey industrial building.
16 MUNITION ST · Aug 9, 2023 · 165 m away - Minor varianceApproved
To permit a "place of amusement" use for the purpose of Hatchet Throwing on the ground floor of the existing two-storey industrial building, for a period of five years.
16 MUNITION ST · Sep 27, 2017 · 165 m away - Minor varianceApproved
To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of six years, from June 10 to November 30, annually.
51 COMMISSIONERS ST · Jan 31, 2017 · 91 m away - Minor varianceApproved
To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of 5 years, from July 1st to October 31st, annually.
51 COMMISSIONERS ST · Feb 19, 2014 · 91 m away - Minor varianceApproved
To permit the subject property to be used for entertainment purposes (Cirque du Soleil) for a period of 3 years, from July 1st to October 31st, annually.
51 COMMISSIONERS ST · Jun 1, 2011 · 91 m away
Latest activity nearby
- Zoning review
Closed
80 COMMISSIONERS ST · Oct 8, 2026 · 35 m away - Building permit
Proposal to erect temporary structures - wooden structures or modules with fabric in lieu of ceilings from June 23 to December 31 2026.South Boulevard of Commissioners St, near Munitions St, in the future transit ROW
80 COMMISSIONERS ST · Jun 23, 2026 · 35 m away - Development application
Draft Plan of Subdivision to create fourteen (14) development blocks of varying sizes and configurations, and nine (9) additional blocks to facilitate new segments of the water's edge promenade and dockwall as well as a variety of publicly-accessible open spaces enable development in Ookwemin Minising.
80 COMMISSIONERS ST · May 15, 2026 · 47 m away · City file - Zoning review
Closed
281 CHERRY ST · Mar 24, 2026 · 293 m away - Building permit
Revision 01 - Revision to Permit 23 235370 to include: new kitchen millwork and appliances at ground floor; new washrooms and kitchenette on the second floor; associated work to HVAC, plumbing and electrical systems; and renaming second floor rooms.Interior renovation to support a Change of Use. Conservation work and new door openings at exterior.Ancillary to Park
51 COMMISSIONERS ST · Aug 11, 2025 · 91 m away - Building permit
Ceremony and celebration sunshade structure (pavillion) as part of Port Lands Flood Protection project. Erection of glulam beam and metal panel pavilion structure.
51 COMMISSIONERS ST · May 27, 2025 · 91 m away - Building permit
Demolish of three separate commercial buildings within the property. 1.Office/warehouse building2 Adjacent Shed3. Single story building
65 VILLIERS ST · Mar 14, 2025 · 104 m away - Minor varianceApproved
To permit a place of amusement use for the purpose of axe throwing on the ground floor of the existing two-storey industrial building.
16 MUNITION ST · Aug 9, 2023 · 165 m away - Zoning review
Closed
16 MUNITION ST · Apr 6, 2023 · 165 m away - Zoning review
Cancelled
16 MUNITION ST · Mar 31, 2023 · 165 m away
Neighbourhood: South Riverdale
About the area around the lot, not the lot itself.
- Nearest station
- King Station37 min walk
- Nearest TTC stop
- Commissioners St at Munition St1 min walk
- Nearest cycling route
- Commissioners StCycle Track, 1 min walk
- Nearest traffic count
- 4,307 vehicles in 14 hMunition St / Commissioners St, 120 m away, Oct 8, 2026
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 2 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Biidaasige Park1 min walk
- Trca Lands ( 51)10 min walk
- Corktown Common10 min walk
Schools within 1 km
- GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 12 min walk
- VOICE INTEGRATIVE PRIVATE SCHOOL Private 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | South Riverdale | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $100,000 | $84,500 |
| Households that own their home | 57% | 54% |
| Population (2021) | 27,815 | 16,813 |
| Homes built in 1960 or before | 52% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Riverdale | City median |
|---|---|---|
| Assault | 828.7 | 636.3 |
| Robbery | 69.3 | 69.5 |
| Shootings | 3.2 | 10.5 |
| Auto theft | 217.4 | 192.6 |
| Theft over $5,000 | 88.2 | 46.1 |
| Break and enter | 264.7 | 172.8 |
| Theft from vehicles | 349.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.