HousePrecheckCheck an address

80 Cherry StToronto · zoning, lot size and permit records

Also 23 Unwin Ave, 8 Unwin Ave

≈ 451.0 × 511.3 m183,345 m²on Cherry Stcorner, also on Unwin Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 18 209017 (Proposal to replace a 4" Watts backflow prevention device (serial # JC-00921) with a ne..., 2018, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 451.0 m frontage≈ 511.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (7% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2018

    Needs a closer look

    Still open in the City's records: 18 209017 (Proposal to replace a 4" Watts backflow prevention device (serial # JC-00921) with a ne..., 2018, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (13% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Zoning review21 237320 ZPRClosed
    Nov 12, 2021 · 80 CHERRY ST
  • Building permit18 209017Inspection

    Proposal to replace a 4" Watts backflow prevention device (serial # JC-00921) with a new 4" Watts backflow prevention device (serial # JC-0995, Model # 975) on the main water service of existing industrial building.

    Aug 27, 2018 · 80 CHERRY ST
  • Building permit14 135831Closed

    Proposal for the installation of 4 backflow prevention devices, in marine terminal 51, warehouse 52, and the international marine passenger terminal, convenience address 8 unwin ave

    May 1, 2014 · 80 CHERRY ST
  • Building permit04 148107Cancelled

    Erect (2) temporary tents structures 30m X 60m & 30"m X 50M , Certification# 00-55011 Erect (2) temporary tent structures 20"m X 40' & 20m X 20m Certification # 00-55010 Tents to be erected on June 16/04 and dismantled on June 17/04

    Jun 17, 2004 · 80 CHERRY ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
183,345 m²
Frontage
451 mestimated, irregular lot
Depth
511.3 mestimated, irregular lot
Street
Cherry St
Corner lot
Yes, also on Unwin Ave511.3 m along it
Public lane
None
House footprint
14,257 m²roof up to 42.6 m
Back yard
87.3 mhouse to rear lot line
Side yards
19.4 m and 357.5 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit the specific use of the Royal Canadian Yacht Club City Station on the subject property.

      130 CHERRY ST · Mar 19, 2008 · 269 m away

    Latest activity nearby

    • Zoning review

      Closed

      100 CHERRY ST · Jan 14, 2025 · 234 m away
    • Zoning review

      Closed

      80 CHERRY ST · Nov 12, 2021 · 208 m away
    • Zoning review

      Closed

      151 CHERRY ST · Aug 16, 2019 · 296 m away
    • Zoning review

      Closed

      151 CHERRY ST · Aug 9, 2019 · 296 m away
    • Building permit

      Proposal for installation of back flow prevention device for existing equipment rental office

      151 CHERRY ST · Mar 7, 2019 · 296 m away
    • Building permit

      Proposal to replace a 4" Watts backflow prevention device (serial # JC-00921) with a new 4" Watts backflow prevention device (serial # JC-0995, Model # 975) on the main water service of existing industrial building.

      80 CHERRY ST · Aug 27, 2018 · 208 m away
    • Building permit

      Proposal for the installation of 4 backflow prevention devices, in marine terminal 51, warehouse 52, and the international marine passenger terminal, convenience address 8 unwin ave

      80 CHERRY ST · May 1, 2014 · 208 m away
    • Building permitnew building

      Construct new accessory building at 151 Cherry Strret - 71.35 m2 - to be used on Subject site as accessory to the existing use of Open Storage Yard (parking facility - Auto impound Yard)

      151 CHERRY ST · Oct 8, 2008 · 296 m away
    • Minor varianceApproved

      To permit the specific use of the Royal Canadian Yacht Club City Station on the subject property.

      130 CHERRY ST · Mar 19, 2008 · 269 m away
    • Consent (lot split)Approved

      To sublease the subject property to the Royal Canadian Yacht Club (RCYC) for a period up to 42 years.

      130 CHERRY ST · Mar 19, 2008 · 269 m away

    Neighbourhood: South Riverdale

    About the area around the lot, not the lot itself.

    Nearest station
    Queens Quay/Ferry Docks Station37 min walk
    Nearest TTC stop
    Commissioners St at Cherry St East Side14 min walk
    Nearest cycling route
    Unwin AveMulti-Use Trail, 4 min walk
    Nearest traffic count
    3,982 vehicles in 14 hUnwin Ave / Cherry St, 260 m away, Oct 6, 2026
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Cherry Beach Clarke Beach Park5 min walk
    Toronto Islands - Ward's Island Park8 min walk
    Cherry Beach Sports Fields9 min walk

    2021 Census

    FigureSouth RiverdaleMedian neighbourhood
    Median household income (2020)$100,000$84,500
    Households that own their home57%54%
    Population (2021)27,81516,813
    Homes built in 1960 or before52%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSouth RiverdaleCity median
    Assault828.7636.3
    Robbery69.369.5
    Shootings3.210.5
    Auto theft217.4192.6
    Theft over $5,00088.246.1
    Break and enter264.7172.8
    Theft from vehicles349.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.