Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
2 building permits open, the oldest since 2014
Needs a closer lookStill open in the City's records: 15 163062 (install a dvca and expansion tank at existing boiler room, 2015, status Permit Issued); 14 138004 (Proposal to upgrade the fire alarm panel in existing apartment building, 2014, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)3 by-law investigations closed in the last two years
Good to knowClosed files (Property Standards, Zoning): 25 259224 ZON 00 IR (Zoning, 2025); 25 126361 PRS 00 IR (Property Standards, 2025); 25 109906 ZON 00 IR (Zoning, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations13 development applications open within 300 m
Good to know13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
11 records on file: more than at 99% of Toronto houses (median 0).
- By-law investigation25 259224 ZON 00 IRClosed
Zoning
Nov 27, 2025 · 80 CHARLES ST E - By-law investigation25 126361 PRS 00 IRClosed
Property Standards
Mar 8, 2025 · 80 CHARLES ST E - By-law investigation25 109906 ZON 00 IRClosed
Zoning
Jan 28, 2025 · 80 CHARLES ST E - Building permit24 129970Closed
Proposal for adding one maglock at the entrance lobby area
Apr 10, 2024 · 80 CHARLES ST E - Building permit24 129963Closed
Proposal for adding one maglock at the entrance of lobby area
Apr 10, 2024 · 88 CHARLES ST E - Building permit21 172930Closed
Proposal to replace existing building makeup air unit, one at each building
Jul 21, 2021 · 80-88 CHARLES ST E - Building permit15 163062Permit Issued
install a dvca and expansion tank at existing boiler room
Jun 8, 2015 · 80-88 CHARLES ST E - Building permit14 138004Inspection
Proposal to upgrade the fire alarm panel in existing apartment building
Apr 24, 2014 · 80 CHARLES ST E
Show 3 older records
- Building permit02 142577Cancelled
make parking garage repairs at 88 charles st e by replacing suspended slab and waterproofing south perimeter wall at garage.
Jun 5, 2002 · 80 CHARLES ST E - Building permit01 163974Closed
install fixtures in basement- 4 dental sinks, 1 cuspidor, 2 2-compt. sinks, 1 f.d., 1 h.d. tenant: dr. robin compton
Jul 31, 2001 · 88 CHARLES ST E - Building permit01 151539Closed
make interior alterartions to existing office in basement. tenant: dr. robin compton hold for sprinkler plans.
Jul 25, 2001 · 88 CHARLES ST E
Check before you build
Site-specific exception 900.11.10(2550)
Needs a closer look1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law C
On 80 Charles St. E., 625 Church St., 99 Hayden St., former City of Toronto by-law 94-0481.
1 part for other addresses
- B On 625 Church St., Section 12(2) 260 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 2,216 m²
- Frontage
- 49.7 m
- Depth
- 45.4 m
- Street
- Charles St E
- Corner lot
- No
- Public lane
- None
- Max height
- 30 m
- Max lot coverage
- —
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c1.0; r4.0) SS1 (x2550) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: cherry, choke shubert (17 cm), ginkgo (9 cm), spruce, colorado blue (5 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 73%8 of 11 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 3
- Development applications
- 26
Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 165 m away - Minor varianceApproved
To permit 30 undersized/partially obstructed vehicular parking spaces within the existing underground parking garage (Parking Levels 1 to 5) of the 53-storey mixed-use building, which is currently under construction.
603 SHERBOURNE ST · Nov 26, 2025 · 472 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1529-2019), for a new 56-storey mixed-use building (which is currently under construction), by increasing the gross floor area, the total number of dwelling units, and the building height(s) for Building E (145.5 m to 159 m). There will be a total of 600 residential dwelling units on this lot.
591 SHERBOURNE ST · Sep 3, 2025 · 469 m away - Minor varianceApproved
To facilitate the redevelopment of this site for a 51-storey mixed-use building, including the Parkland dedication requirement. This application is necessitated to modify Sections 4, 7, 16, and 24 under Appendix 1, Site Specific Zoning By-law 1528-2019, and Sections 4, 7, 15, and 23 under Schedule A, Site Specific Zoning By-law 1529-2019, which relates to the timing of conveyance and lease of the parklands and the construction for park improvements.
601 SHERBOURNE ST · Jun 11, 2025 · 468 m away - Minor varianceApproved
To permit the replacement of 4 new mechanical units.
1 MOUNT PLEASANT RD · Apr 9, 2025 · 186 m away
Latest activity nearby
- Building permit
Revision 01 - fire alarm upgrade to P1, P2, P3, P4, P5 and first and second floorFire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.
1 MOUNT PLEASANT RD · Nov 18, 2026 · 186 m away - Building permit
Proposal for interior alterations to an existing office space
121 BLOOR ST E · Nov 10, 2026 · 193 m away - Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 165 m away - Building permit
REV 01: Revision to permit to include two risers Proposal to replace heating riser.
110 CHARLES ST E · Oct 20, 2026 · 91 m away - Building permit
Office new fit out to accommodate new tenant. HVAC to reflect new ceiling.
175 BLOOR ST E · Oct 15, 2026 · 110 m away - Building permit
Proposed make-up air replacements
55 BLOOR ST E · Oct 13, 2026 · 287 m away - Building permit
PROPOSED EXTERIOR WALL REPAIRS
620 CHURCH ST · Oct 5, 2026 · 126 m away - Building permit
Maglock Installation
100 HAYDEN ST · Sep 9, 2026 · 69 m away - Building permit
1 ILLUMINATED WALL SIGN ** ST. ANDREWS UNITED CHURCH **
117 BLOOR ST E · Aug 28, 2026 · 195 m away - Building permit
Proposed interior alterations to unit 1101 to expand existing boardroom and add two (2) small offices.
175 BLOOR ST E · Aug 27, 2026 · 110 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Bloor Station7 min walk
- Nearest TTC stop
- Bloor St East at Church St3 min walk
- Nearest cycling route
- Bloor St ECycle Track, 3 min walk
- Nearest traffic count
- 13,605 vehicles in 14 hCharles St E / Church St, 90 m away, Sep 9, 2025
- Serious collisions within 500 m
- 112021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 5 with cyclists
- Parks
- Charles Street Parkette1 min walk
- Milner Parkette5 min walk
- Asquith Green Park5 min walk
Schools within 1 km
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 3 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 5 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 6 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 6 min walk
- JARVIS COLLEGIATE INSTITUTE English Public 9 min walk
- BRANKSOME HALL GIRLS SCHOOL Private 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.