HousePrecheckCheck an address

80 Braemar AveToronto · zoning, lot size and permit records

88.9 × 146.6 m12,743 m²on College View Avecorner, also on Braemar Ave

Not a home

Oriole Park Public School

The City of Toronto's real estate inventory lists Oriole Park Public School here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 166301 (Proposal to underpin existing spread footing, construct trench box and excavate to dept..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
88.9 m frontage146.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2014

    Needs a closer look

    Still open in the City's records: 14 140681 (Proposal to install one backflow prevention device in existing school - "Oriole Park Pu..., 2014, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 166301 (Proposal to underpin existing spread footing, construct trench box and excavate to dept..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit26 166301Inspection

    Proposal to underpin existing spread footing, construct trench box and excavate to depth of existing clogged plumbing pipe, repair clogged pipe, backfill trenched area, construct new slab in repair area

    Jul 6, 2026 · 80 BRAEMAR AVE
  • Zoning review23 146855 ZZUClosed
    May 17, 2023 · 80 BRAEMAR AVE
  • Building permit22 172196Closed

    Proposal to construct a new washroom for daycare.

    Jul 25, 2022 · 80 BRAEMAR AVE
  • Building permit17 253567Closed

    Proposal to replace two existing entrance canopies and for general brick repointing and replacements to an existing school. "Oriole Park Junior Public School"

    Nov 20, 2017 · 80 BRAEMAR AVE
  • Zoning review15 161185 ZPRClosed
    May 22, 2015 · 80 BRAEMAR AVE
  • Zoning review14 186967 ZPRClosed
    Jul 8, 2014 · 80 BRAEMAR AVE
  • Building permit14 139057Closed

    Proposal to install new 1.5" pipe up to mechanical room to extend existing sprinkler system to protect the gym stage, "Oriole Park Public School"

    Apr 24, 2014 · 80 BRAEMAR AVE
  • Building permit14 140681Inspection

    Proposal to install one backflow prevention device in existing school - "Oriole Park Public School"

    Apr 16, 2014 · 80 BRAEMAR AVE
Show 3 older records
  • Building permit14 117558Closed

    Proposal to construct interior alterations including washroom addition, adding a partition and new millwork to the basement and ground floor of the existing elementry school.

    Mar 17, 2014 · 80 BRAEMAR AVE
  • Building permit12 142005Closed

    Permit to replace fire alarm permit in existing elementry school

    Apr 19, 2012 · 80 BRAEMAR AVE
  • Building permit10 197918Closed

    HVAC - Proposal for 2 new portable classrooms for Oriole Park Junior Public School.

    Oct 15, 2010 · 80 BRAEMAR AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
12,743 m²
Frontage
88.9 m
Depth
146.6 m
Street
College View Ave
Corner lot
Yes, also on Braemar Ave146.6 m along it
Public lane
None
House footprint
863 m²roof up to 20.7 m
Back yard
22 mhouse to rear lot line
Side yards
5.5 m and 38.7 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 13 City trees in front of this lot. The City's street tree inventory lists 13 trees at this address: maple, norway (102 cm), maple, norway (85 cm), maple, norway (85 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
98%40 of 41 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
25
Development applications
0

Within 300 m, last 10 years. 25 suite and multiplex permits: more than at 92% of Toronto houses (median 3). 41 variance decisions: more than at 76% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing one-storey detached by constructing a complete second storey addition, as well as front and side (east) ground floor additions (with basement additions below). A portion of the existing driveway at the southeast corner of the lot will be reconstructed.

    222 CHAPLIN CRES · Nov 4, 2026 · 190 m away
  • Minor varianceApproved

    Proposed change of use of the existing gymnasium to a retail store, together with interior alterations to combine with the existing retail space at 484 Eglinton Avenue West.

    490 EGLINTON AVE W · Sep 3, 2026 · 361 m away
  • Minor varianceApproved

    To construct a new two-storey detached ancillary building (to contain one garden suite with two parking spaces), in the rear yard of the existing two-storey detached dwelling. There will be a total of four residential dwelling units on this lot (three units within the main building, and one unit within the ancillary building).

    35 BRAEMAR AVE · Jul 15, 2026 · 193 m away
  • Minor varianceApproved

    To construct a new rear one-storey ancillary building (one-car detached garage, abutting College View Avenue).

    77 COLLEGE VIEW AVE · Jul 8, 2026 · 77 m away
  • Minor varianceApproved

    To alter the existing detached dwelling by constructing a third storey addition and converting into an apartment building with 5 dwelling units.

    66 BURNABY BLVD · Jun 4, 2026 · 381 m away

Latest activity nearby

  • Building permitmultiplex

    Proposal for interior alterations to convert an existing basement storage space into a 6th dwelling unit within the north half of 112-114 Braemar Avenue.

    112-114 BRAEMAR AVE · Nov 17, 2026 · 148 m away
  • Zoning review

    Not Started

    38 BRAEMAR AVE · Nov 13, 2026 · 151 m away
  • Minor varianceApproved

    To alter the existing one-storey detached by constructing a complete second storey addition, as well as front and side (east) ground floor additions (with basement additions below). A portion of the existing driveway at the southeast corner of the lot will be reconstructed.

    222 CHAPLIN CRES · Nov 4, 2026 · 190 m away
  • Building permit

    Proposal for back water valve installation

    193 A CHAPLIN CRES · Nov 3, 2026 · 275 m away
  • Zoning review

    Under Review

    95 BRAEMAR AVE · Oct 28, 2026 · 112 m away
  • Zoning review

    Closed

    366 EGLINTON AVE W · Oct 26, 2026 · 300 m away
  • Building permit

    Construction of rear garage

    46 BRAEMAR AVE · Oct 19, 2026 · 114 m away
  • Building permit

    Revision 1: 3rd floor addition.Interior and exterior alterations to existing building; conversion from two-unit to single family dwelling

    15 BRAEMAR AVE · Oct 8, 2026 · 265 m away
  • Building permitsecondary suite

    Construction of rear garage

    46 BRAEMAR AVE · Sep 30, 2026 · 114 m away
  • Building permit

    Backwater Valve installation

    203 CHAPLIN CRES · Sep 25, 2026 · 243 m away

Neighbourhood: Yonge-Eglinton

About the area around the lot, not the lot itself.

Nearest station
Avenue Station5 min walk
Nearest TTC stop
Avenue Rd at College View Ave3 min walk
Nearest cycling route
Kay Gardiner Beltline TrlMulti-Use Trail - Entrance, 3 min walk
Nearest traffic count
1,390 vehicles in 8 hBraemar Ave / College View Ave, 80 m away, Oct 27, 2022
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Larratt Parkette4 min walk
Kay Gardner Beltline Park4 min walk
Robert Bateman Parkette7 min walk

Schools within 1 km

  • ORIOLE PARK JR PUBLIC SCHOOL English Public 1 min walk
  • MARSHALL MCLUHAN CATHOLIC SECONDARY SCHOOL English Separate 10 min walk
  • FOREST HILL JR & SR PUBLIC SCHOOL English Public 13 min walk
  • BIRMINGHAM INTERNATIONAL COLLEGIATE OF CANADA Private 13 min walk
  • ALLENBY JR PUBLIC SCHOOL English Public 14 min walk
  • THE STUDY ACADEMY Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-EglintonMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home37%54%
Population (2021)12,41016,813
Homes built in 1960 or before47%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-EglintonCity median
Assault713.8636.3
Robbery95.269.5
Auto theft115.6192.6
Theft over $5,00010246.1
Break and enter136172.8
Theft from vehicles54.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.