HousePrecheckCheck an address

8 Dawes RdToronto · zoning, lot size and permit records

43.3 × 71.6 m2,678 m²on Dawes Rdcorner, also on Signal St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 22 225744 STE 19 OZ (Rezoning application for a 52 residential building with retail at grade containing 579..., 2022); 22 225743 STE 19 SA (Site Plan application for a 52 residential building with retail at grade containing 579..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
43.3 m frontage71.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 225744 STE 19 OZ (Rezoning application for a 52 residential building with retail at grade containing 579..., 2022); 22 225743 STE 19 SA (Site Plan application for a 52 residential building with retail at grade containing 579..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Zoning review22 225744 PRZClosed
    Aug 10, 2026 · 8 DAWES RD
  • Zoning review22 225743 PSPClosed
    Jun 11, 2025 · 8 DAWES RD
  • Development application22 225744 STE 19 OZOMB Appeal

    Rezoning application for a 52 residential building with retail at grade containing 579 units, inlcuding 12 units of affordable housing , The development contains a total gross floor area (GFA) of 35,973m2 which is primarily residential (35,748m2) but also includes 225m2 of non-residential GFA, yielding a floor space index (FSI) of 14.33. There are 103 vehicle and 648 bike parking spaces. This is related to OLT Case # OLT-23-000941.

    Nov 3, 2022 · 8 DAWES RD · City file
  • Development application22 225743 STE 19 SAUnder Review

    Site Plan application for a 52 residential building with retail at grade containing 579 units, inlcuding 12 units of affordable housing , The development contains a total gross floor area (GFA) of 35,973m2 which is primarily residential (35,748m2) but also includes 225m2 of non-residential GFA, yielding a floor space index (FSI) of 14.33. There are 103 vehicle and 648 bike parking spaces. This is related to OLT Case # OLT-23-000941.

    Nov 3, 2022 · 8 DAWES RD · City file
  • Building permit15 155011Closeddemolition

    Applicant proposed to demolish the existing "Home Hardware store".

    Jun 24, 2015 · 8 DAWES RD
  • Zoning review97 026730 LTOClosed
    Aug 27, 1997 · 8 DAWES RD
  • Zoning review90 029107 LTOClosed
    Dec 27, 1990 · 8 DAWES RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,678 m²
Frontage
43.3 m
Depth
71.6 m
Street
Dawes Rd
Corner lot
Yes, also on Signal St71.6 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%8 of 8 decisions
    Garden suite permits
    1
    Laneway suite permits
    1
    Multiplex permits
    0
    Development applications
    19

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit the two-storey ancillary building (one-car garage and storage space on the ground level, and a storage loft on the west side of the second level), which is currently under construction.

      65 KIMBERLEY AVE · Oct 7, 2026 · 481 m away
    • Minor varianceApproved

      To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (porch enclosure), and a rear three-storey addition with a third storey deck (to replace the existing rear two-storey portion of the dwelling and rear ground floor deck). This rear three-storey addition will be cantilevered on the north side of the dwelling. The existing rear one-storey detached ancillary building (garage containing a workshop) will be maintained and unaltered.

      88 MALVERN AVE · Jul 8, 2026 · 456 m away
    • Minor varianceApproved

      To alter the existing one-and-one-half storey semi-detached dwelling by constructing a second storey addition (new north side dormer), and a new rear first storey deck with stairs.

      107 A HANNAFORD ST · Apr 29, 2026 · 495 m away
    • Minor varianceApproved

      To construct a one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway (Sibley Avenue). The existing one-storey shed will be demolished.

      9 AVONLEA BLVD · Jan 21, 2026 · 463 m away
    • Minor varianceApproved

      To construct a new rear two-storey detached ancillary building (containing two garden suites) with two porches on the south wall.

      103 MALVERN AVE · Jan 14, 2026 · 411 m away

    Latest activity nearby

    • Minor variancePending

      To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition.

      26 LUTTRELL AVE · Nov 25, 2026 · 298 m away
    • Building permit

      Interior alterations to the second and third floors to convert the residential space into a single dwelling unit.

      2813 DANFORTH AVE · Nov 6, 2026 · 212 m away
    • Zoning review

      Closed

      2820 DANFORTH AVE · Oct 28, 2026 · 245 m away
    • Building permit

      Installation of five (5) electromagnetic door locks (maglocks) on Floor 1, Floor 2, and Floor 3.

      6 DAWES RD · Oct 21, 2026 · 182 m away
    • Building permit

      Proposed Interior alteration for mercantile space at ground floor and office/shop arrangement at basement.

      2858 DANFORTH AVE · Oct 19, 2026 · 291 m away
    • Development application

      Draft Plan of Condominium for 373 residential units.

      10 DAWES RD · Oct 14, 2026 · 65 m away · City file
    • Building permit

      Install backwater valve

      39 CROSSOVERS ST · Sep 23, 2026 · 224 m away
    • Building permitdemolition

      Proposal for demolition of the existing structures

      2734 DANFORTH AVE · Sep 21, 2026 · 205 m away
    • Building permitdemolition

      proposal for demolition of the existing structures

      2726 DANFORTH AVE · Sep 21, 2026 · 205 m away
    • Building permitdemolition

      Proposal for demolition of the existing structures on the property and the construction of a new exterior wall to isolate the adjacent attached structure

      2720 DANFORTH AVE · Sep 21, 2026 · 222 m away

    Neighbourhood: East End-Danforth

    About the area around the lot, not the lot itself.

    Nearest station
    Danforth GO Station7 min walk
    Nearest TTC stop
    Danforth Ave at Dawes Rd3 min walk
    Nearest cycling route
    Danforth AveCycle Track, 3 min walk
    Nearest traffic count
    17,990 vehicles in 14 hDanforth Ave / Dawes Rd, 190 m away, Jun 24, 2025
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 0 with cyclists
    Parks
    East Toronto Athletic Field3 min walk
    Bob Acton Park4 min walk
    Coleman Park4 min walk

    Schools within 1 km

    • WILLIAM J MCCORDIC SCHOOL English Public 6 min walk
    • DANFORTH LINC English Public 9 min walk
    • BEACHES ALTERNATIVE JR & KIMBERLEY JR English Public 10 min walk
    • MALVERN COLLEGIATE INSTITUTE English Public 10 min walk
    • SECORD ELEMENTARY SCHOOL English Public 11 min walk
    • COMMUNITY LIFE CHRISTIAN SCHOOL Private 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureEast End-DanforthMedian neighbourhood
    Median household income (2020)$90,000$84,500
    Households that own their home55%54%
    Population (2021)21,84016,813
    Homes built in 1960 or before54%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleEast End-DanforthCity median
    Assault796.2636.3
    Robbery51.869.5
    Shootings410.5
    Auto theft147.3192.6
    Theft over $5,00039.846.1
    Break and enter195.1172.8
    Theft from vehicles195.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.