Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 22 205973 STE 11 OZ (Zoning By-law Amendment application to permit a 64-storey mixed-use building, containin..., 2022).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications23 development applications open within 300 m
Good to know23 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 94 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
2 records on file: more than at 72% of Toronto houses (median 0).
- By-law investigation25 239080 WST 00 IRClosed
Waste
Oct 14, 2025 · 8 CHARLES ST E - Development application22 205973 STE 11 OZAppeal Received
Zoning By-law Amendment application to permit a 64-storey mixed-use building, containing 514 dwelling units and 1,000 square metres of non-residential gross floor area. The proposal includes heritage conservation on the site.
Sep 20, 2022 · 8 CHARLES ST E · City file
Check before you build
Site-specific exception 900.11.10(1387)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 404 m²
- Frontage
- 9.6 m
- Depth
- 44.8 m
- Street
- Charles St E
- Corner lot
- No
- Public lane
- Ln E Yonge N Charles, 54.6 m along it
- Max height
- 18 m
- Max lot coverage
- —
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 3.0 (c2.0; r3.0) SS1 (x1387) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 96%25 of 26 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 1
- Development applications
- 53
Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 26 variance decisions: more than at 58% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 457 m away - Minor varianceApproved
To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.
1235 BAY ST · Oct 14, 2026 · 382 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.
874 YONGE ST · Aug 5, 2026 · 424 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.
27-29 YORKVILLE AVE · Jul 15, 2026 · 362 m away - Minor varianceApproved
To alter the development standards for the 50-storey residential building (approved under Site Specific Zoning By-Law 697-2021(OLT)), by increasing the permitted gross floor area, and the permitted encroachment of cladding and other similar façade treatments into the required minimum building setbacks.
874 YONGE ST · May 28, 2025 · 424 m away
Latest activity nearby
- Zoning review
Application Acceptable
12 CUMBERLAND ST · Nov 24, 2026 · 300 m away - Zoning review
Application On Hold
649 YONGE ST · Nov 23, 2026 · 114 m away - Building permit
Proposal for new Sprinklers System on the 3rd floor public corridor.
60 BLOOR ST W · Nov 19, 2026 · 297 m away - Building permit
Proposed interior alterations to an existing office
2 BLOOR ST E · Nov 18, 2026 · 189 m away - Building permit
One wall sign.***SIGNATURE HAIR STUDIO***
665 YONGE ST · Nov 18, 2026 · 69 m away - Building permit
Proposal for interior alterations to an existing office.
2 BLOOR ST E · Nov 17, 2026 · 189 m away - Zoning review
Not Started
12 CUMBERLAND ST · Nov 12, 2026 · 300 m away - Building permit
Proposal for interior alterations to an existing office space
121 BLOOR ST E · Nov 10, 2026 · 220 m away - Building permit
1 Wall Sign*****RUDSAK******
55 BLOOR ST W · Nov 10, 2026 · 254 m away - Building permit
Proposal to convert the second floor of Da.Si.Mar Shawarma into a coffee shop with a maximum seating capacity of 30 people
673 YONGE ST · Nov 5, 2026 · 55 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Bloor Station4 min walk
- Nearest TTC stop
- Yonge St at Charles St West1 min walk
- Nearest cycling route
- Yonge StCycle Track, 1 min walk
- Nearest traffic count
- 6,984 vehicles in 8 hYonge St / Charles St W, 50 m away, Nov 5, 2016
- Serious collisions within 500 m
- 92021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 3 with cyclists
- Parks
- George Hislop Park1 min walk
- St. Mary Street Parkette3 min walk
- Norman Jewison Park3 min walk
Schools within 1 km
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 3 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 7 min walk
- ROSEDALE DAY SCHOOL Private 9 min walk
- ST JOSEPH'S COLLEGE SCHOOL English Separate 9 min walk
- THE YMCA ACADEMY SECONDARY SCHOOL Private 10 min walk
- TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.