HousePrecheckCheck an address

78 Mutual StToronto · zoning, lot size and permit records

84.9 × 27.4 m2,112 m²on Mutual St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelStill open in the City's records: 23 228782 (Landlord improvements to vacant retail store, 2023, status Inspection); 19 109950 (REV 01: CHANGE FROM ECOLOGIZER TO VENTLESS HOOD SYSTEM, 2021, status Revision Issued); 20 194166 (Proposal for the replacement of a fire alarm system, 2020, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 53 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N50 m
84.9 m frontage27.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 building permits open, the oldest since 2020

    Needs a closer look

    Still open in the City's records: 23 228782 (Landlord improvements to vacant retail store, 2023, status Inspection); 19 109950 (REV 01: CHANGE FROM ECOLOGIZER TO VENTLESS HOOD SYSTEM, 2021, status Revision Issued); 20 194166 (Proposal for the replacement of a fire alarm system, 2020, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 14 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards, Zoning): 26 236622 PRS 00 IR (Property Standards, 2026); 26 178499 PRS 00 IR (Property Standards, 2026); 26 178470 PRS 00 IR (Property Standards, 2026); and 11 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0479/02TEY (Construct a 12-storey residential condominium (153 units) with two levels of undergroun..., 2002); A0196/02TEY (The owner is seeking relief from the provisions of the Zoning By-law in order to constr..., 2002).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 53 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

37 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 261270 ZAPClosed
    Oct 28, 2026 · 78 MUTUAL ST
  • By-law investigation26 236622 PRS 00 IRClosed

    Property Standards

    Sep 12, 2026 · 78 MUTUAL ST
  • By-law investigation26 178499 PRS 00 IRClosed

    Property Standards

    Jun 5, 2026 · 78 MUTUAL ST
  • By-law investigation26 178470 PRS 00 IRClosed

    Property Standards

    Jun 5, 2026 · 78 MUTUAL ST
  • By-law investigation26 149798 GRA 00 IVClosed

    Notice Issued Graffiti

    Apr 12, 2026 · 78 MUTUAL ST
  • By-law investigation26 142297 GRA 00 IRClosed

    Graffiti

    Apr 12, 2026 · 78 MUTUAL ST
  • By-law investigation26 125594 PRS 00 IRClosed

    Property Standards

    Mar 5, 2026 · 78 MUTUAL ST
  • By-law investigation26 125060 PRS 00 IRClosed

    Property Standards

    Mar 4, 2026 · 78 MUTUAL ST
Show 29 older records
  • By-law investigation25 255824 ZON 00 IRClosed

    Zoning

    Nov 19, 2025 · 78 MUTUAL ST
  • By-law investigation25 222253 PRS 00 IRClosed

    Property Standards

    Sep 8, 2025 · 78 MUTUAL ST
  • By-law investigation25 222231 PRS 00 IRClosed

    Property Standards

    Sep 8, 2025 · 78 MUTUAL ST
  • By-law investigation25 218997 PRS 00 IVClosed

    Order Issued Property Standards: Dwelling unit is not connected by two way voice communication system and security locking release mechanism to the principle entrance of the building.

    Aug 20, 2025 · 78 MUTUAL ST
  • By-law investigation25 213699 PRS 00 IRClosed

    Property Standards

    Aug 20, 2025 · 78 MUTUAL ST
  • By-law investigation25 199701 PRS 00 IRClosed

    Property Standards

    Jul 24, 2025 · 78 MUTUAL ST
  • By-law investigation25 247880 PRS 00 IVClosed

    Order Issued Property Standards: The property has not been repaired in accordance with the standards.

    Jul 7, 2025 · 78 MUTUAL ST
  • By-law investigation25 189200 PRS 00 IRClosed

    Property Standards

    Jul 7, 2025 · 78 MUTUAL ST
  • By-law investigation25 157528 HEA 00 IRClosed

    Adequate Heat

    May 10, 2025 · 78 MUTUAL ST
  • Building permit23 228782Inspection

    Landlord improvements to vacant retail store

    Nov 27, 2023 · 78 MUTUAL ST
  • Building permit23 164288Closed

    Proposal for balcony repairs to an existing apartment building.Convenience address is 81 Dalhousie St.

    Jul 5, 2023 · 78 MUTUAL ST
  • Building permit19 109950Revision Issued

    REV 01: CHANGE FROM ECOLOGIZER TO VENTLESS HOOD SYSTEM

    Jan 18, 2021 · 78 MUTUAL ST
  • Building permit20 194166Permit Issued

    Proposal for the replacement of a fire alarm system.

    Oct 6, 2020 · 78 MUTUAL ST
  • Building permit16 216740Closed

    Revision 01: Proposal to increase scope of work by replacing 11th and 12th floor terrace gaurds. Convenience address is 75 Dalhousie St.Proposal for exterior joint sealant replacement , refinish exterior insulation and finish system (EIFS), repainting exterior windows and doors, and replace existing juliette balcony guards.Convenience address is 75 Dalhousie St.

    Sep 19, 2018 · 78 MUTUAL ST
  • Zoning review12 156328 LTOClosed
    Apr 18, 2012 · 78 MUTUAL ST
  • Building permit12 117902Closed

    Proposal to install one backflow prevention device for existing apartment building for "Terrace Housing Co-Operative Inc". Convenience address: 88 Mutual Street

    Feb 16, 2012 · 78 MUTUAL ST
  • Building permit11 300596Closed

    Proposal to install one backflow prevention device for existing apartment building for "Metta Housing Co-Operative Inc". Convenience address: 99 Dalhousie Street

    Oct 31, 2011 · 78 MUTUAL ST
  • Building permit02 191312Closed

    alter plans approved under bp 00-131142 by making layout changes and reducing parking to 86 spaces, - 102 one bedroom units & 51 one bedroom plus den units see c of a

    Apr 10, 2003 · 78 MUTUAL ST
  • Building permit02 176109Closed

    provide shop drawing for sprinkler system cost included under bp#00-131142

    Jan 21, 2003 · 78 MUTUAL ST
  • Minor varianceA0479/02TEYApproved

    Construct a 12-storey residential condominium (153 units) with two levels of underground parking. This proposal constitutes Phase 3 of a multi-phase development project.

    Nov 13, 2002 · 78 MUTUAL ST
  • Building permit02 176098Closed

    install h.v.a. system cost included under bp#00-131142

    Nov 12, 2002 · 78 MUTUAL ST
  • Building permit02 182004Closed

    Install - 153 kitchen sinks, 153 dishwashers, 153 bathtubs, 20 showers, 153 wash machines, 153 water closets, 12 floor drains, 2.5 mm water service, 150mm storm drain and 150mm sanitary drain. (cost included in BP 00-131142)

    Nov 5, 2002 · 78 MUTUAL ST
  • Zoning review02 165391 PLOClosed
    Aug 20, 2002 · 78 MUTUAL ST
  • Building permit02 116566Closed

    provide superstructure structural works for apartment bld consisting 153 dwelling units with underground parking. This permit covers all structural works from ground floor to the roof.

    Jul 2, 2002 · 78 MUTUAL ST
  • Minor varianceA0196/02TEYApproved

    The owner is seeking relief from the provisions of the Zoning By-law in order to construct a 12-storey residential condominium (153 units) with 2 levels of underground parking. This proposal constitutes Phase 3 of a multi-phase development project.

    Jun 5, 2002 · 78 MUTUAL ST
  • Building permit02 122936Closed

    Revision to excavation and shoring permit in conjunction with application under file no. 00 - 131142 (to build an apartment building consisting of 150 dwelling units with underground parking.) by extending excavation northward by one more bay. *** Fee collected under 00-131142-01 already ***

    Apr 2, 2002 · 78 MUTUAL ST
  • Building permit00 131142Cancellednew building

    alter plan 01-121373 as approved by changing layout of shoring & excavation. See permit 01-121373.

    Mar 7, 2002 · 78 MUTUAL ST
  • Zoning review01 190429 PSPClosed
    Oct 30, 2001 · 78 MUTUAL ST
  • Building permit01 121373Closed

    Excavate and provide shoring in conjunction with application under file no. 00 - 131142 to build an apartment building consisting of 150 dwelling units with underground parking.

    Mar 26, 2001 · 78 MUTUAL ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,112 m²
Frontage
84.9 m
Depth
27.4 m
Street
Mutual St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • 11 City trees in front of this lot. The City's street tree inventory lists 11 trees at this address: oak, red (37 cm), oak, red (36 cm), oak, red (28 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
96%27 of 28 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
13
Development applications
50

Within 300 m, last 10 years. 13 suite and multiplex permits: more than at 80% of Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 271 m away
  • Minor varianceApproved

    To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

    30 BOND ST · Jan 21, 2026 · 299 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 226 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 71 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 81 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.

    60 QUEEN ST E · Dec 16, 2026 · 281 m away
  • Building permit

    Proposal to replace existing pre-action system fire control panel and associated initiating field devices.

    30 BOND ST · Nov 19, 2026 · 299 m away
  • Building permit

    Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.

    231 DUNDAS ST E · Nov 19, 2026 · 298 m away
  • Building permit

    Sprinklers related to 25-195702 BLD

    30 BOND ST · Nov 2, 2026 · 299 m away
  • Zoning review

    Closed

    78 MUTUAL ST · Oct 28, 2026 · 6 m away
  • Zoning review

    Not Started

    207 JARVIS ST · Oct 21, 2026 · 144 m away
  • Building permit

    Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room

    25 MUTUAL ST · Oct 19, 2026 · 199 m away
  • Zoning review

    Closed

    88 QUEEN ST E · Oct 14, 2026 · 267 m away
  • Building permit

    Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.

    181 DUNDAS ST E · Oct 8, 2026 · 170 m away
  • Building permit

    Proposed project consists of security system upgrades including CCTV coverage throughout both exit stairwells and around the building perimeter, along with access control upgrades at stairwell and crossover floor doors.

    65 DUNDAS ST E · Oct 6, 2026 · 232 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
TMU Station7 min walk
Nearest TTC stop
Dundas St East at Jarvis St2 min walk
Nearest cycling route
Shuter StCycle Track, 1 min walk
Nearest traffic count
10,895 vehicles in 14 hMutual St / Shuter St, 90 m away, Oct 27, 2026
Serious collisions within 500 m
242021–2026, killed or seriously injured: 3 fatal, 16 with pedestrians, 2 with cyclists
Parks
Arena Gardens1 min walk
45 Dalhousie St Park2 min walk
Moss Park4 min walk

Schools within 1 km

  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 3 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 3 min walk
  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 4 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 4 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 4 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.