HousePrecheckCheck an address

775 The QueenswayToronto · zoning, lot size and permit records

Also 775A The Queensway, 775B The Queensway, 775C The Queensway, 775D The Queensway, 775E The Queensway and 7 more

Employment · E 1.0 (x36)≈ 173.6 × 282.2 m25,803 m²on Taymall Avecorner, also on Sinclair St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 11 301743 (HVAC - Interior alterations to an existing City of Toronto Employment Center office, 2011, status Inspection); 07 229344 (HVAC - interior alters and upgrades to existing office area for unit "C", 2007, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
N50 m
≈ 173.6 m frontage≈ 282.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2007

    Needs a closer look

    Still open in the City's records: 11 301743 (HVAC - Interior alterations to an existing City of Toronto Employment Center office, 2011, status Inspection); 07 229344 (HVAC - interior alters and upgrades to existing office area for unit "C", 2007, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

16 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 125840 ZZUClosed
    Mar 6, 2026 · 7 TAYMALL AVE
  • Zoning review26 125108 LTOClosed
    Mar 5, 2026 · 775-779 THE QUEENSWAY
  • Zoning review26 119722 LTOClosed
    Feb 23, 2026 · 7 TAYMALL AVE
  • Zoning review19 132399 LTOClosed
    Mar 29, 2019 · 777 THE QUEENSWAY
  • Building permit18 160658Closed

    Proposal for interior alterations to Unit C for a restaurant (Holy Perogy!)

    Aug 24, 2018 · 777 THE QUEENSWAY
  • Building permit17 111162Closed

    Interior alterations to expand into vacant space for additional storage warehouse and kitchen testing facilities. *Pelmen Foods* Clients are wholesale Expand from Unit E into Unit D

    May 9, 2017 · 777 THE QUEENSWAY
  • Building permit15 135961Closed

    Permit for interior alterations & HVAC to part of ground floor within existing office building.

    Jul 8, 2015 · 779 THE QUEENSWAY
  • Building permit11 301743Inspection

    HVAC - Interior alterations to an existing City of Toronto Employment Center office.

    Dec 8, 2011 · 775-779 THE QUEENSWAY
Show 8 older records
  • Zoning review07 256846 LPRClosed
    Aug 27, 2007 · 775-779 THE QUEENSWAY
  • Zoning review07 256842 000Cancelled
    Aug 27, 2007 · 775 THE QUEENSWAY
  • Building permit07 229344Inspection

    HVAC - interior alters and upgrades to existing office area for unit "C"

    Jun 20, 2007 · 7 TAYMALL AVE
  • Zoning review06 121423 LTOClosed
    Mar 29, 2006 · 775-779 THE QUEENSWAY
  • Zoning review06 103767 LTOClosed
    Jan 19, 2006 · 775-779 THE QUEENSWAY
  • Zoning review05 169567 LTOClosed
    Aug 10, 2005 · 775-779 THE QUEENSWAY
  • Building permit05 166897Cancelled

    Interior alterations to unit #2 of a multi-tenant building to introduce a children's play area.

    Aug 3, 2005 · 775-779 THE QUEENSWAY
  • Building permit02 180044Closed

    Interior Alterations to Social Services Office Building

    Nov 25, 2002 · 775-779 THE QUEENSWAY

Check before you build

  • Site-specific exception 900.20.10(36)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(36)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of Etobicoke by-law 1991-13.

By-law 569-2013, Chapter 900

Lot facts

Area
25,803 m²
Frontage
173.6 mestimated, irregular lot
Depth
282.2 mestimated, irregular lot
Street
Taymall Ave
Corner lot
Yes, also on Sinclair St282.2 m along it
Public lane
None
House footprint
4,014 m²roof up to 10.8 m
Back yard
26.1 mhouse to rear lot line
Side yards
21.5 m and 66.5 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (x36) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: honey locust (43 cm), honey locust (37 cm), honey locust (36 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%12 of 13 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
2
Development applications
9

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a two-storey south side addition and a second storey addition above the existing building.

    21 CANMOTOR AVE · Jun 29, 2017 · 469 m away
  • Minor varianceApproved

    To permit parking deficiencies that have resulted from the addition of two tenants located at the mezzanine level of the building.

    10 QUEEN ELIZABETH BLVD · Aug 27, 2015 · 209 m away

Latest activity nearby

  • Minor varianceRefused

    To construct a third storey front addition and a three-storey rear addition. The altered dwelling will be converted into a fourplex.

    530 ROYAL YORK RD · Nov 19, 2026 · 248 m away
  • Building permit

    Interior alteration to an empty warehouse for the proposal of a commercial kitchen space to operate a commissary kitchen.

    15 SINCLAIR ST · Nov 18, 2026 · 163 m away
  • Building permit

    To demolish existing rear detached garage and maintain parking pad

    530 ROYAL YORK RD · Nov 10, 2026 · 248 m away
  • Building permit

    Proposed interior alteration to Costco retail store. Scope of work includes remodel of existing members washroom, including, mechanical, plumbing, and electrical.

    50 QUEEN ELIZABETH BLVD · Oct 30, 2026 · 240 m away
  • Zoning review

    Notice Sent

    7 QUEEN ELIZABETH BLVD · Oct 23, 2026 · 283 m away
  • Zoning review

    Closed

    16 QUEEN ELIZABETH BLVD · Oct 20, 2026 · 174 m away
  • Building permitmultiplex, secondary suite

    Proposal to construct a 3rd storey addition, a 3 storey south side and rear addition with an integral garage, secondary suite, a walkout and rear deck, and convert to a duplex.

    9 AVON PARK DR · Sep 10, 2026 · 266 m away
  • Zoning review

    Closed

    2 QUEEN ELIZABETH BLVD · Sep 4, 2026 · 224 m away
  • Building permit

    Proposed Change of Use and Interior Alterations of existing Retail store (Beer Stores, Group E occupancy) into Anytime Fitness Club (Business and personal services, Group D occupancy).

    772 THE QUEENSWAY · Aug 11, 2026 · 198 m away
  • Zoning review

    Closed

    5 SINCLAIR ST · Aug 10, 2026 · 188 m away

Neighbourhood: Stonegate-Queensway

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station16 min walk
Nearest TTC stop
The Queensway at Taymall Ave3 min walk
Nearest cycling route
Royal York RdBike Lane, 4 min walk
Nearest traffic count
29,747 vehicles in 14 hThe Queensway / Taymall Ave, 200 m away, Apr 16, 2025
Serious collisions within 500 m
72021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Queensway Park4 min walk
Alan - Oxford Parkette5 min walk
Saunders Crescent Parkette7 min walk

Schools within 1 km

  • ST LOUIS CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • GEORGE R GAULD JR SCHOOL English Public 11 min walk
  • OAK LEARNERS Private 12 min walk
  • ETOBICOKE SCHOOL OF THE ARTS English Public 12 min walk
  • KAREN KAIN SCHOOL OF THE ARTS English Public 14 min walk
  • BEHAVIOUR INNOVATIONS, CHILDREN'S COLLEGE Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureStonegate-QueenswayMedian neighbourhood
Median household income (2020)$104,000$84,500
Households that own their home63%54%
Population (2021)25,65016,813
Homes built in 1960 or before55%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleStonegate-QueenswayCity median
Assault465.6636.3
Robbery40.869.5
Homicide3.45.3
Shootings13.610.5
Auto theft193.7192.6
Theft over $5,0006846.1
Break and enter217.5172.8
Theft from vehicles129.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.