Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Cultural Heritage Evaluation Report required
Needs a closer lookThis property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.
What it means. Plans to tear down or rebuild will need a heritage evaluation first.
How to confirm. Heritage Planning at the City confirms the status. Details
Official Plan Amendment 7201 open by-law investigation
Needs a closer lookNot resolved in the City's records: 26 271921 HEA 00 IR (Adequate Heat, 2026, status Rescheduled).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations2 building permits open, the oldest since 2016
Needs a closer lookStill open in the City's records: 19 140346 (install backflow device, 2019, status Inspection); 15 260765 (Permit to install new roof drains, 2016, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)3 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 256198 PRS 00 IR (Property Standards, 2026); 26 209061 HEA 00 IR (Adequate Heat, 2026); 24 252578 PRS 00 IR (Property Standards, 2024).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 25 159135 (A proposal to erect and display two illuminated Wall Signs, displaying static copy,***R..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications19 development applications open within 300 m
Good to know19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 63 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 92 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 30 units, built 1926).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
47 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 271921 HEA 00 IRRescheduled
Adequate Heat
Nov 18, 2026 · 77 WELLESLEY ST E - By-law investigation26 256198 PRS 00 IRClosed
Property Standards
Oct 17, 2026 · 77 WELLESLEY ST E - By-law investigation26 242627 GRA 00 IRClosed
Graffiti
Sep 23, 2026 · 77 WELLESLEY ST E - By-law investigation26 209061 HEA 00 IRClosed
Adequate Heat
Jul 27, 2026 · 77 WELLESLEY ST E - By-law investigation26 192178 GRA 00 IVClosed
Notice Issued Graffiti
Jun 26, 2026 · 77 WELLESLEY ST E - By-law investigation26 191745 GRA 00 IRClosed
Graffiti
Jun 26, 2026 · 77 WELLESLEY ST E - Building permit25 159135Permit Issued
A proposal to erect and display two illuminated Wall Signs, displaying static copy,***RBC***
May 27, 2025 · 77 WELLESLEY ST E - By-law investigation24 252578 PRS 00 IRClosed
Property Standards
Dec 20, 2024 · 77 WELLESLEY ST E
Show 39 older records
- Zoning review24 170180 LTOClosedJun 26, 2024 · 77 WELLESLEY ST E
- Zoning review23 120634 LTOClosedMar 7, 2023 · 77 WELLESLEY ST E
- Development application21 252158 STE 13 CDClosed
Draft Plan of Condominium for 179 residential units and 1 commercial unit.
Dec 30, 2021 · 81 WELLESLEY ST E · City file - Building permit19 236734Closed
Proposal for interior alterations for retail use tenant- Friendly Stranger
Jan 6, 2020 · 77 WELLESLEY ST E - Building permit19 236444Closed
Proposal to replace the fire alarm panel in the basement and some upgrades to existing fire alarm devices.
Nov 12, 2019 · 77 WELLESLEY ST E - Zoning review19 205264 ZZCCancelledAug 13, 2019 · 77 WELLESLEY ST E
- Zoning review19 196162 ZZCCancelledJul 26, 2019 · 77 WELLESLEY ST E
- Building permit19 140346Inspection
install backflow device
May 17, 2019 · 77 WELLESLEY ST E - Building permit17 181289Closed
Proposal to construct a temporary light truss structure to be erected June 23rd and dismantled June 25th for "PRIDE"
Jun 20, 2017 · 77 WELLESLEY ST E - Building permit16 213310Closed
Interior fit out of a Wine Rack store
Aug 30, 2016 · 77 WELLESLEY ST E - Building permit16 157364Closed
To erect and display signs **RBC**
May 18, 2016 · 77 WELLESLEY ST E - Building permit15 232083Closed
REVISION TO MAKE SIGN SMALLER BY DROPPING THE 'RBC' LETTERS. **ROYAL BANK**
Apr 12, 2016 · 77 WELLESLEY ST E - Building permit15 260765Inspection
Permit to install new roof drains.
Jan 5, 2016 · 77 WELLESLEY ST E - Building permit15 262326Closed
Proposed interior alterations for tenant fit-up of suite.
Dec 23, 2015 · 77 WELLESLEY ST E - Development application15 247190 STE 27 SAClosed
The proposed development consists of a 28-storey (88.7 metres, plus 7 metres mechanical) residential tower inclusive of a six-storey podium with grade-related commercial uses. A total of 179 residential units are proposed along with approximately 70 square metres (753 square feet) of grade-related retail, for a total combined residential and non-residential gross floor area of 14,821square metres (160,694 square feet), and a floor-space index (FSI) of 15.85 times the area of the lot. The OMB approved the OPA and Rezoning Application. By-law 1479-2017(OMB)
Nov 4, 2015 · 81 WELLESLEY ST E · City file - Building permit15 239706Closed
Existing mixed use building - Residential Apartments with Ground Floor Retail - Exterior Alterations toGround Floor Storefront.
Nov 2, 2015 · 77 WELLESLEY ST E - Building permit15 183286Cancelled
To erect and display three illuminated wall signs on the northerly and easterly elevation of building, in conjunction with a wine shop.**WINERACK**
Oct 22, 2015 · 77 WELLESLEY ST E - Building permit15 155114Closed
Proposal for window replacement in existing retail store - "Wine Rack"
May 26, 2015 · 77 WELLESLEY ST E - Building permit15 142506Closed
Proposal for exterior alterations to storefronts and interior alterations to accommodate new business and personal services use on the ground floor of the existing multiple unit building. (Tenant fit up to come in a later permit).
May 5, 2015 · 77 WELLESLEY ST E - Zoning review15 114626 ZZCClosedFeb 11, 2015 · 77 WELLESLEY ST E
- Zoning review14 237933 ZPRClosedOct 15, 2014 · 77 WELLESLEY ST E
- Zoning review14 179587 LTOClosedJun 24, 2014 · 77 WELLESLEY ST E
- Development application13 225676 STE 27 OZClosed
Applications for an Official Plan Amendment and a Zoning By -Law Amendment to permit a 28 storey mixed use building, with a height of 95.7 m., comprising of 179 residential dwelling units with a total gross floor area of 14,821 sq.m.
Aug 23, 2013 · 81 WELLESLEY ST E - Building permit09 174058Closed
Create "Hero Certified Burger" restaurant ground floor with seating for 24.
Oct 15, 2009 · 77 WELLESLEY ST E - Building permit08 119412Closed
Interior alterations to convert existing restaurant greater than 30 seats to retail store. Priape.
Apr 1, 2008 · 77 WELLESLEY ST E - Zoning review08 114815 LTOClosedFeb 27, 2008 · 77 WELLESLEY ST E
- Zoning review08 114812 LTOCancelledFeb 27, 2008 · 77 WELLESLEY ST E
- Building permit06 152671Closed
Interior alterations to existing restaurant (greater than 30) on the ground floor to relocate bar area's and kitchen. Convenience address - 501 A Church St.
Jul 24, 2006 · 77 WELLESLEY ST E - Building permit04 197482Closed
Repair elevator penthouse. Existing and proposed: apartment building.
Apr 29, 2005 · 77 WELLESLEY ST E - Building permit05 106134Closed
Install sprinkler system in retail store on 1st floor. Tenant: Wine Rack see 04 - 193259
Feb 7, 2005 · 77 WELLESLEY ST E - Building permit04 193259Closed
Interior alterations on ground floor.
Nov 18, 2004 · 77 WELLESLEY ST E - Building permit04 131485Closed
Plumbing -Install new fixtures Interior alterations to existing space -change from retail to rest < 30 seats. 93 sq.m - Interior Alterations
Jun 1, 2004 · 77 WELLESLEY ST E - Building permit02 127737Closed
make interior alterations to ground floor existing restaurant by increasing occupancy load from 122 seats to 199 seats. tenant: bar 501.
Apr 23, 2002 · 77 WELLESLEY ST E - Building permit97 017890Closed
INSTALL ONE NON ENCROACHING CANOPY SIGN 3' DIAMETER - ,65M2 AND 1 ENCR. CANOPY SIGN 34.83' X 3' = 104.49 = 9.70M2 1 FACIA SIGN ENC 23.5' X 3' = 70.5 - 6,54M2 AND ONE FASCIA SIGN NON ENC - 3' X 12' = 36 SQ. FT - 3.34M2 LG (WORK BEING DONE AT 71 WELLESLEY ST E., CONV. ADDRESS)
Aug 19, 1997 · 77 WELLESLEY ST E - Zoning review94 024615 LTOClosedMar 7, 1994 · 77 WELLESLEY ST E
- Zoning review91 026424 LTOClosedMay 2, 1991 · 501 A CHURCH ST
- Zoning review90 029077 LTOClosedDec 7, 1990 · 77 WELLESLEY ST E
- Zoning review90 028428 LTOClosedMay 7, 1990 · 77 WELLESLEY ST E
- Zoning review85 026499 LTOClosedMar 18, 1985 · 77 WELLESLEY ST E
Check before you build
Site-specific exception 900.11.10(2545)
Needs a closer look4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(2) 131 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 208 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 260 of former City of Toronto By-law 438-86
1 part for other addresses
- E On 576 Church St., former City of Toronto by-laws 21280 and 821-80.
Lot facts
- Area
- 1,359 m²
- Frontage
- 36.6 m
- Depth
- 37.2 m
- Street
- Wellesley St E
- Corner lot
- Yes, also on Church St37.2 m along it
- Public lane
- None
- House footprint
- 810 m²roof up to 21.2 m
- Back yard
- 1.6 mhouse to rear lot line
- Side yards
- 0.2 m and 4.7 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 6house, garage, sheds
- Max height
- 18 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Church Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 3.0 (c1.7; r3.0) SS1 (x2545) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: maple, hedge (20 cm), honey locust (12 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 94%16 of 17 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 4
- Development applications
- 31
Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.
508 CHURCH ST · Sep 9, 2026 · 145 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.
20 MAITLAND ST · Apr 1, 2026 · 243 m away - Minor varianceApproved
To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.
134 CARLTON ST · Jul 9, 2025 · 491 m away - Minor varianceApproved
To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).
26 MAITLAND ST · Apr 23, 2025 · 224 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.
510 YONGE ST · Mar 19, 2025 · 378 m away
Latest activity nearby
- Building permit
Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.
43 WELLESLEY ST E · Oct 28, 2026 · 160 m away - Building permit
REV01: As bubbled on drawings.HVAC - Proposal for interior alterations to convert existing storage into leasing office and storage.
15 DUNDONALD ST · Sep 30, 2026 · 275 m away - Building permit
Proposal for installation of an art work on the front face of existing building. Weight 150kg
519 CHURCH ST · Sep 25, 2026 · 121 m away - Zoning review
Cancelled
584 CHURCH ST · Sep 22, 2026 · 187 m away - Minor varianceApproved
To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.
508 CHURCH ST · Sep 9, 2026 · 145 m away - Zoning review
Closed
473 CHURCH ST · Sep 2, 2026 · 116 m away - Building permit
Installation of one Electromagnetic Lock on ground floor.
20 MAITLAND ST · Sep 1, 2026 · 243 m away - Building permit
REV 01: Proposed 4th unit in basementProposal for interior alterations, including the replacement of the staircase from the ground floor to the basement and the addition or replacement of non-structural walls. There are no changes to any exterior doors or windows. New beams and columns are being added in the basement.
109 GLOUCESTER ST · Jul 24, 2026 · 240 m away - Building permit
Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.
43 WELLESLEY ST E · Jul 10, 2026 · 160 m away - Building permit
Proposed Repair existing metal beam at top of Hydro vault box as required. Work to include removal of damaged/corroded material, preparation of surface, installation/repair of steel member, and protectivecoating/finish
40 ALEXANDER ST · Jun 24, 2026 · 251 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Wellesley Station5 min walk
- Nearest TTC stop
- Wellesley St East at Church St1 min walk
- Nearest cycling route
- Wellesley St ECycle Track, 1 min walk
- Nearest traffic count
- 14,434 vehicles in 14 hWellesley St E / Church St, 40 m away, Sep 26, 2026
- Serious collisions within 500 m
- 102021–2026, killed or seriously injured: 0 fatal, 7 with pedestrians, 1 with cyclists
- Parks
- Barbara Hall Park1 min walk
- Paul Kane House Parkette2 min walk
- Alexander Street Parkette5 min walk
Schools within 1 km
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 2 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 3 min walk
- JARVIS COLLEGIATE INSTITUTE English Public 4 min walk
- CHURCH ST JR & NATIVE LEARNING CTR English Public 4 min walk
- NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 4 min walk
- NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.