HousePrecheckCheck an address

77 Maitland PlToronto · zoning, lot size and permit records

Also 445 Jarvis St

Residential · R (d2.0) (x764)≈ 88.1 × 130.4 m8,965 m²on Maitland Pl

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.9 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 23 202807 (Proposal for suspended slab water proof repairs to the garage over an existing apartmen..., 2023, status Permit Issued); 20 196725 (Proposal to repair the pool deck and basin of an indoor pool located on the ground floo..., 2020, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 56 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 88.1 m frontage≈ 130.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2020

    Needs a closer look

    Still open in the City's records: 23 202807 (Proposal for suspended slab water proof repairs to the garage over an existing apartmen..., 2023, status Permit Issued); 20 196725 (Proposal to repair the pool deck and basin of an indoor pool located on the ground floo..., 2020, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 25 222154 ZON 00 IR (Zoning, 2025); 25 105924 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 56 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 1 short-term rental registrations here

    Good to know

    1 active short-term rental registration at this address (Condominium).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

22 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation25 222154 ZON 00 IRClosed

    Zoning

    Sep 8, 2025 · 77 MAITLAND PL
  • By-law investigation25 105924 PRS 00 IRClosed

    Property Standards

    Jan 17, 2025 · 77 MAITLAND PL
  • Building permit23 202807Permit Issued

    Proposal for suspended slab water proof repairs to the garage over an existing apartment building

    Oct 19, 2023 · 77 MAITLAND PL
  • Building permit20 196725Inspection

    Proposal to repair the pool deck and basin of an indoor pool located on the ground floor of an existing apartment building.

    Oct 12, 2020 · 77 MAITLAND PL
  • Building permit19 102596Closed

    Proposal to replace the chiller in the north and south towers of the existing Residential Condominium.

    Feb 4, 2019 · 77 MAITLAND PL
  • Building permit18 269804Closed

    Proposed installation of 2 new mag-locks in an an existing apartment building.

    Jan 4, 2019 · 77 MAITLAND PL
  • Zoning review18 185163 LTOClosed
    Jun 27, 2018 · 77 MAITLAND PL
  • Building permit16 156372Closed

    Proposal for concrete repairs to underground parking in existing apartment building.

    Jun 2, 2016 · 77 MAITLAND PL
Show 14 older records
  • Building permit16 122718Closed

    Proposal to replace 2 cooling towers on roof (north and south buildings) and 4 make up air units in existing apartment buildings.

    Mar 30, 2016 · 77 MAITLAND PL
  • Building permit12 194980Closed

    Proposal to install one electromagnetic lock on the ground floor.

    Jun 22, 2012 · 77 MAITLAND PL
  • Building permit12 162604Closed

    permit for interior alterations to existing apartment unit - kitchen renovation. - suite 1224

    May 10, 2012 · 77 MAITLAND PL
  • Zoning review11 165774 ZPUClosed
    Apr 5, 2011 · 77 MAITLAND PL
  • Building permit10 105806Closed

    Proposal to install 1 backflow prevention device in an existing apartment building.

    Jan 25, 2010 · 77 MAITLAND PL
  • Building permit08 161263Closed

    Permit to change fire alarm panel ground floor

    Jun 4, 2008 · 77 MAITLAND PL
  • Zoning review06 106379 LTOClosed
    Feb 1, 2006 · 445 JARVIS ST
  • Zoning review01 012967 LTOClosed
    Jul 13, 2001 · 445 JARVIS ST
  • Building permit00 326286Closed

    make balcony repairs throughout apartment building. (180 balconies x $14.00) fee: $2520.00 edc. Hold for Structural Engineer Field Review Memo + Owners Com Form

    Aug 28, 2000 · 77 MAITLAND PL
  • Zoning review99 118073 000Closed
    Dec 23, 1999 · 77 MAITLAND PL
  • Building permit99 105016Closed

    fire alarm upgrage to entire building

    Nov 1, 1999 · 77 MAITLAND PL
  • Zoning review98 026564 LTOClosed
    Aug 25, 1998 · 77 MAITLAND PL
  • Zoning review91 026615 LTOClosed
    Jun 18, 1991 · 445 JARVIS ST
  • Zoning review85 026680 LTOClosed
    Jun 6, 1985 · 77 MAITLAND PL

Check before you build

  • Site-specific exception 900.2.10(764)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(764)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(7).

  2. Older by-law A

    On the odd numbered addresses of 441-471 Jarvis St., 77 Maitland Pl., former City of Toronto by-law 804-80.

By-law 569-2013, Chapter 900

Lot facts

Area
8,965 m²
Frontage
88.1 mestimated, irregular lot
Depth
130.4 mestimated, irregular lot
Street
Maitland Pl
Corner lot
No
Public lane
None
Max height
30 m
Max lot coverage
—
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d2.0) (x764) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 10 City trees in front of this lot. The City's street tree inventory lists 10 trees at this address: maple, norway (33 cm), maple, norway (32 cm), maple, norway (32 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%12 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
4
Development applications
15

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

    97 GRANBY ST · Oct 15, 2025 · 412 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.

    344 JARVIS ST · Sep 21, 2022 · 196 m away
  • Minor varianceRefused

    To construct a third storey addition (enclosed staircase) to provide access to the proposed rooftop deck for Unit 2.

    50 BLEECKER ST · Jan 12, 2022 · 327 m away
  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.

    50 EARL ST · Sep 15, 2021 · 468 m away
  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.

    50 EARL ST · Dec 4, 2020 · 468 m away

Latest activity nearby

  • Building permit

    Proposal for addition of a bathroom in unit 1. Layout changes in units 1, 26, 32 & 35.

    134 CARLTON ST · Nov 26, 2026 · 212 m away
  • Building permit

    Proposal to undertake Exterior Renovations (AODA), including modifications to exterior parking areas, line painting, stairs (guards, handrails, and tactile warning indicators), installation of permeable pavers, and curbs to improve accessibility and bring the site into compliance with AODA requirements.

    439 SHERBOURNE ST · Nov 3, 2026 · 298 m away
  • Zoning review

    Closed

    140 CARLTON ST · Oct 27, 2026 · 211 m away
  • Building permit

    Layout changes + addition of a bathroom in units1A, 12, 24 & 25.

    134 CARLTON ST · Oct 23, 2026 · 212 m away
  • Building permit

    Proposed geothermal system for new building

    405 SHERBOURNE ST · Oct 20, 2026 · 270 m away
  • Building permit

    Replacement of the existing make up air unit, DHW storage tank and boilers including ductwork, piping, pumps, etc. in the penthouse mechanical room.

    330 JARVIS ST · Oct 13, 2026 · 238 m away
  • Building permit

    Proposal to convert the existing single family residential dwelling to a multi-tenant residential dwelling, replacing spiral stair attic access with straight run interior stairs from 2nd floor to attic.

    108 BLEECKER ST · Sep 22, 2026 · 294 m away
  • Zoning review

    Closed

    473 CHURCH ST · Sep 2, 2026 · 275 m away
  • Building permit

    Proposed converting the existing parking spot (parking spot # A69) to a storage unit.

    130 CARLTON ST · Aug 27, 2026 · 209 m away
  • Zoning review

    Closed

    108 BLEECKER ST · Aug 21, 2026 · 294 m away

Neighbourhood: Cabbagetown-South St.James Town

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station10 min walk
Nearest TTC stop
Wellesley St East at Jarvis St4 min walk
Nearest cycling route
Maitland PlBike Lane - Contraflow, 1 min walk
Nearest traffic count
8,866 vehicles in 8 hJarvis St / Maitland Pl / Maitland St, 110 m away, Dec 10, 2022
Serious collisions within 500 m
102021–2026, killed or seriously injured: 0 fatal, 7 with pedestrians, 1 with cyclists
Parks
Montague Parkette2 min walk
Allan Gardens4 min walk
Wellesley - Magill Park5 min walk

Schools within 1 km

  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 2 min walk
  • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 2 min walk
  • NATIONAL BALLET SCHOOL Private 2 min walk
  • NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 3 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 3 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCabbagetown-South St.James TownMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home45%54%
Population (2021)11,02016,813
Homes built in 1960 or before42%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCabbagetown-South St.James TownCity median
Assault1078.6636.3
Robbery145.369.5
Auto theft91.8192.6
Theft over $5,00022.946.1
Break and enter321.3172.8
Theft from vehicles229.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.