Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
3 building permits open, the oldest since 2020
Needs a closer lookStill open in the City's records: 23 129001 (Watermain Replacement, 2023, status Inspection); 21 222678 (Proposal for interior and exterior alterations of the existing data centre, 2022, status Inspection); 19 264498 (Revision #01 - Exterior site construction of foundations and concrete housekeeping pads..., 2020, status Revision Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 26 157736 PRS 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations1 Committee of Adjustment file on this lot
Good to know1 approved. A0277/21EYK (To permit a parking deficiency to accomodate the newly constructed industrial building, 2021).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
16 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 157736 PRS 00 IRClosed
Property Standards
May 8, 2026 · 77 FIMA CRES - Building permit24 254449Cancelled
Alteration of an existing vacant space into a new Data Hall 4.The entire facility is a Data Centre owned & operated by 'Compass Datacenters'The scope of work includes removing & rebuilding the portion of the exterior wall (only in DH4 area of work) & interior fit out of a vacant space into a new DATA HALL and Interior Fit Out of a `UPS¿ room.
Dec 30, 2024 · 77 FIMA CRES - Building permit24 251582Cancelled
Proposal for demolition of the north portion of the existing building to accommodate the future new Data Halls & outdoor equipment yards.See also BA 24-254449
Dec 18, 2024 · 77 FIMA CRES - Zoning review24 179927 ZAPApplication On HoldJul 12, 2024 · 77 FIMA CRES
- Building permit23 129001Inspection
Watermain Replacement
Oct 10, 2023 · 77 FIMA CRES - Building permit21 222678Inspection
Proposal for interior and exterior alterations of the existing data centre.
Jun 22, 2022 · 77 FIMA CRES - Minor varianceA0277/21EYKApproved
To permit a parking deficiency to accomodate the newly constructed industrial building.
Sep 14, 2021 · 77 FIMA CRES - Building permit20 112099Closed
FS - Sprinkler Shop Drawing review for proposed interior alterations for demising of major spaces for new occupant (Data Centre)
Dec 4, 2020 · 77 FIMA CRES
Show 8 older records
- Building permit20 121147Cancelled
Proposal for interior alteartions to remove a portion of an existing demising wall between Units A and B
Mar 2, 2020 · 77 FIMA CRES - Building permit19 264498Revision Issued
Revision #01 - Exterior site construction of foundations and concrete housekeeping pads for future electrical (generator) equipment and mechanical ventilation and cooling equipment to be installed at grade additional framing information provided, along with altered foundation now using micropiles.Proposed costruction of concrete pads for generators and cooling units installation. Early works pemrit for a future conversion of the existing warehouse into a data centre.In this building permit are approved generator supports and cooling unit supports along the south side of the 75 Fima. Excluded from this proposal are cooling units supports along the west side of 75 Fima, due to the lack of structural information. (VN)
Feb 7, 2020 · 75 FIMA CRES - Zoning review19 256159 ZPRClosedDec 2, 2019 · 77 FIMA CRES
- Building permit18 267474Closed
Proposal to install a back flow prevention device.
Jan 22, 2019 · 77 FIMA CRES - Building permit16 189251Closed
Proposal to install sprinklers on upper and lower levels of building - for temporary studio film set.
Aug 9, 2016 · 77 FIMA CRES - Building permit15 165323Closed
Interior alterations to #75 and #77 Fima Cres. Also changes to parking and openings in exterior walls.
Aug 14, 2015 · 77 FIMA CRES - Building permit12 274492Closed
Targeted masonry repairs
Nov 23, 2012 · 75 FIMA CRES - Building permit07 251642Closed
HVAC - Interior alterations to existing administrative office space of a plant + converting existing warehouse area into additional office space.
Aug 28, 2007 · 77 FIMA CRES
Lot facts
- Area
- 31,648 m²
- Frontage
- 159.6 mestimated, irregular lot
- Depth
- 270.5 mestimated, irregular lot
- Street
- Fima Cres
- Corner lot
- No
- Public lane
- None
- House footprint
- 19,292 m²roof up to 10.7 m
- Back yard
- 49.7 mhouse to rear lot line
- Side yards
- 7.4 m and 17 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
Around this lot
- Minor variances approved
- 100%18 of 18 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 18 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a new multi-unit commercial building with an attached vehicle depot.
197 THIRTIETH ST · Aug 13, 2026 · 408 m away - Minor varianceApproved
To construct a mezzanine within a portion of the existing building.
146 THIRTIETH ST · Dec 4, 2025 · 323 m away - Minor varianceApproved
To permit a Personal Service Shop use within the existing Employment building.
157 THIRTIETH ST · May 15, 2025 · 286 m away - Minor varianceApproved
To permit a Personal Service Shop use within the existing employment building.
155 THIRTIETH ST · May 15, 2025 · 282 m away - Minor varianceRefused
To construct a new warehouse.
186 THIRTIETH ST · Aug 29, 2024 · 440 m away
Latest activity nearby
- Building permit
Proposal to create a new roll up door by cutting into CMU wall between 26 & 32 Belvia Rd.
26 BELVIA RD · Nov 24, 2026 · 234 m away - Zoning review
Closed
157 THIRTIETH ST · Sep 28, 2026 · 286 m away - Building permit
Proposal for Office Renovation
40 BELVIA RD · Sep 25, 2026 · 140 m away - Zoning review
Closed
157 THIRTIETH ST · Sep 9, 2026 · 286 m away - Building permit
Proposal for a backwater valve installation.
84 TWENTY SIXTH ST · Sep 8, 2026 · 256 m away - Zoning review
Notice Sent
125 THIRTIETH ST · Apr 23, 2026 · 255 m away - Consent (lot split)Approved
To obtain consent to sever the property into two undersized residential lots.
86 LABURNHAM AVE · Apr 23, 2026 · 243 m away - Minor varianceApproved
To construct a new detached dwelling with an attached garage and a secondary suite.
86 LABURNHAM AVE · Apr 23, 2026 · 243 m away - Minor varianceApproved
To construct a new detached dwelling with an attached garage and a secondary suite.
86 LABURNHAM AVE · Apr 23, 2026 · 243 m away - Building permit
2 Ground Sign " OXFORD "
121 THIRTIETH ST · Feb 5, 2026 · 196 m away
Neighbourhood: Alderwood
About the area around the lot, not the lot itself.
- Nearest station
- Long Branch GO Station26 min walk
- Nearest TTC stop
- Thirtieth St at Akron Rd5 min walk
- Nearest cycling route
- Thirtieth StSigned Route (No Pavement Markings), 5 min walk
- Nearest traffic count
- 4,446 vehicles in 8 hElder Ave / Thirtieth St, 440 m away, Jun 27, 2023
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Laburnham Park2 min walk
- Don Russell Memorial Park7 min walk
- Skeens Lane Parkette9 min walk
Schools within 1 km
- VINCENT MASSEY ACADEMY Private 6 min walk
- PENGUIN PRIVATE SCHOOL Private 11 min walk
- LAKESHORE COLLEGIATE INSTITUTE English Public 13 min walk
- JAMES S BELL JR MDL SPORTS AND WELLNESS ACADEMY English Public 13 min walk
- TWENTIETH STREET JR SCHOOL English Public 13 min walk
- HUMBER COLLEGE SCHOOL - LAKESHORE CAMPUS College 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Alderwood | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $106,000 | $84,500 |
| Households that own their home | 77% | 54% |
| Population (2021) | 12,595 | 16,813 |
| Homes built in 1960 or before | 54% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Alderwood | City median |
|---|---|---|
| Assault | 508.1 | 636.3 |
| Robbery | 69.6 | 69.5 |
| Shootings | 7 | 10.5 |
| Auto theft | 222.7 | 192.6 |
| Theft over $5,000 | 104.4 | 46.1 |
| Break and enter | 201.9 | 172.8 |
| Theft from vehicles | 132.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.