HousePrecheckCheck an address

766 Don Mills RdToronto · zoning, lot size and permit records

≈ 381.9 × 475.2 m90,176 m²on Gateway Blvdcorner, also on Don Mills Rd

Not a home

Trca Lands

The City of Toronto's real estate inventory lists Trca Lands here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 24 252610 NNY 16 SA (Site Plan Control Placeholder for Flemingdon Park Station, one of the stations included..., 2024); 21 191003 NNY 16 SB (2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 mNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
N50 m
≈ 381.9 m frontage≈ 475.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • TRCA regulated area (97% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (97% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: E.T. Seaton Park

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • Natural Heritage System (98% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 252610 NNY 16 SA (Site Plan Control Placeholder for Flemingdon Park Station, one of the stations included..., 2024); 21 191003 NNY 16 SB (2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Development application24 252610 NNY 16 SAUnder Review

    Site Plan Control Placeholder for Flemingdon Park Station, one of the stations included in the Ontario Line Elevated Guideway and Stations contract.

    Dec 20, 2024 · 770 DON MILLS RD · City file
  • Development application21 190984 NNY 16 OZClosed

    Zoning By-law Amendment application proposes to develop the site with mixed-use residential buildings, a new TDSB elementary school, child care space, retail space, a public park, and a new public road.

    Jul 28, 2021 · 770 DON MILLS RD · City file
  • Development application21 191003 NNY 16 SBApplication Received
    Jul 28, 2021 · 770 DON MILLS RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
90,176 m²
Frontage
381.9 mestimated, irregular lot
Depth
475.2 mestimated, irregular lot
Street
Gateway Blvd
Corner lot
Yes, also on Don Mills Rd475.2 m along it
Public lane
None
House footprint
13,379 m²roof up to 21.3 m
Back yard
162.2 mhouse to rear lot line
Side yards
84 m and 118.8 mhouse to side lot lines
Buildings on the lot
21house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    5

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards for the multi-tower residential development (as approved under Site-Specific Zoning By-law No. 49-2025) to reduce the number of long-term bicycle parking spaces, modify the loading space requirement, and increase the driveway width.

      7 ST DENNIS DR · Feb 19, 2026 · 315 m away
    • Minor varianceApproved

      To construct an addition to the existing restaurant and seek a reduction in the number of parking spaces as a result of the construction of a new dual lane drive-thru.

      747 DON MILLS RD · Nov 9, 2023 · 478 m away
    • Minor varianceApproved

      To permit and legalize existing parking spaces.

      789 DON MILLS RD · Jul 23, 2020 · 390 m away
    • Minor varianceApproved

      To construct a new canopy and legalize the existing non-compliant lot area, as represented below.

      747 DON MILLS RD · Feb 6, 2013 · 478 m away
    • Minor varianceApproved

      This is an application to permit the construction of two buildings (restaurant and retail uses) on the above noted site.The existing building would be demolished.

      751 DON MILLS RD · Jun 23, 2010 · 374 m away

    Latest activity nearby

    • Building permitnew building

      Proposal for temporary site office to accommodate TGP staff working on theconstruction of the Ontario Line's Flemingdon Park Station (NFS).

      770 DON MILLS RD · Nov 25, 2026 · 156 m away
    • Building permit

      Proposal for tent to cover slurry storage tanks needed for ontario line elevated guideway construction at NFS ( don Mills and Gateway Blvd North Leg). Tent will be approx 523 sq. m and 8.68m high at its tallest point. The tent will be in place Vovember 15, 2026 to June 1, 2027

      770 DON MILLS RD · Nov 2, 2026 · 156 m away
    • Building permit

      REV : Relocation of wet utilities in conflict with guide way piers and station footprint at 770 Don Mills Road. The work involves removal, supply, and installation of sewer system, stormwater, watermains and all associated appurtenances. There is no change to current scope of work request to only include updated drawings to the approved Site Services Permit25 230459 STS 00 DRProposal for relocation of wet utilities in conflict with guide way piers and station footprint at 770 Don Mills Road. The work involves removal, supply, and installation of sewer system, water mains and all associated appurtenances.

      770 DON MILLS RD · Sep 28, 2026 · 156 m away
    • Building permit

      Proposal for alternative solution for extended travel distance for rooftop service areas

      770 DON MILLS RD · Sep 10, 2026 · 156 m away
    • Building permitnew building

      Proposal for the construction of three mock-ups installations and a tent, for key public facing components of the Ontario Line station buildings that will inform system-wide procurement decisions. Mock-up one will be an entry portal and station ambassadors office, mock-up two will be a station platform and mockup three a typical stair. The three mock-up installations will be protected from weather conditions by a tent. The tent will be installed at a later stage after foundations and structural works are completed. As per discussions with the City, part permit for foundations and structural steel works will be pursued by TGP under this building permit application process.

      770 DON MILLS RD · Aug 19, 2026 · 156 m away
    • Zoning review

      Closed

      770 DON MILLS RD · Aug 11, 2026 · 156 m away
    • Building permit

      The proposed Site Services Permit is for temporary water connections for construction activities at Flemingdon Park Station,

      770 DON MILLS RD · Jul 6, 2026 · 156 m away
    • Building permitdemolition

      The work consists of localized demolition and removal of specific sections of the retaining wall located within the property limits of 770 Don Mills Rd, and not in the right-of-way (ROW), The sections of the wall are being removed due to the current alignment conflicting with the guideway Piers D-25 and D-26, to enable construction of these piers. Scope also includes demolition of the wall, implementation of dust control measures, and hauling/disposal of all demolition debris. Following demolition, the area will be gradedand prepared to meet the requirements for upcoming foundation and structural work associated with the guideway piers. This demolition is one component of the broader scope of work required to facilitate construction along the Ontario Line corridor.

      770 DON MILLS RD · Apr 22, 2026 · 156 m away
    • Building permit

      Proposal for alternative solution to code compliance for stations related to the application of emergency power.

      770 DON MILLS RD · Apr 2, 2026 · 156 m away
    • Building permit

      Proposl for a tent to cover slurry storage tanks at 770 Don Mills Road (NFS). The tent is crucial in protecting Ontario Line construction over the winter months. Tent will be approx 64ft x 88ft (5632sqf / 523sqm) and 342inch (8.68m) high at its tallest point. The tent will be in place January 1, 2026 to June 1, 2026.

      770 DON MILLS RD · Jan 7, 2026 · 156 m away

    Neighbourhood: Flemingdon Park

    About the area around the lot, not the lot itself.

    Nearest station
    Don Valley Station11 min walk
    Nearest TTC stop
    Don Mills Rd at St Dennis Dr4 min walk
    Nearest cycling route
    West Don River TrlPark Road, 3 min walk
    Nearest traffic count
    28,414 vehicles in 14 hDon Mills Rd / St Dennis Dr, 250 m away, Apr 23, 2025
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    E.T. Seton Park1 min walk
    Flemingdon Park7 min walk
    Big Bear Park8 min walk

    Schools within 1 km

    • GRENOBLE PUBLIC SCHOOL English Public 10 min walk
    • VALLEY PARK MDL SCHOOL English Public 11 min walk
    • MARC GARNEAU COLLEGIATE INSTITUTE English Public 14 min walk
    • GATEWAY PUBLIC SCHOOL English Public 14 min walk
    • ST JOHN XXIII CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureFlemingdon ParkMedian neighbourhood
    Median household income (2020)$70,000$84,500
    Households that own their home43%54%
    Population (2021)22,53016,813
    Homes built in 1960 or before13%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleFlemingdon ParkCity median
    Assault596636.3
    Robbery3869.5
    Shootings11.410.5
    Auto theft235.4192.6
    Theft over $5,00026.646.1
    Break and enter60.7172.8
    Theft from vehicles201.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.