HousePrecheckCheck an address

763 Bay StToronto · zoning, lot size and permit records

Commercial residential · CR 7.8 (c2.0; r7.8) SS1 (x2321)≈ 57.3 × 55.8 m2,580 m²on Bay St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 20 156016 (Proposal for localized waterproofing and concrete repairs within the parking garage and..., 2020, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 57.3 m frontage≈ 55.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 20 156016 (Proposal for localized waterproofing and concrete repairs within the parking garage and..., 2020, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 204709 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Records mention second unit

    Good to know

    Permits or Committee of Adjustment files on this lot mention second unit: 06 187841 (HVAC - Interior fit out to GFand Basement Unit for new 'BMO' Bank, 2006).

    What it means. Check that the unit you would buy matches what was approved, and that its permit was closed after final inspection.

    How to confirm. Ask the seller for the permit and final inspection. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation25 204709 PRS 00 IRClosed

    Property Standards

    Aug 4, 2025 · 763 BAY ST
  • Building permit20 156016Permit Issued

    Proposal for localized waterproofing and concrete repairs within the parking garage and on the podium deck.

    Aug 24, 2020 · 763 BAY ST
  • Building permit18 103376Cancelled

    Install maglock to provide additional security to the ground floor

    Jan 10, 2018 · 763 BAY ST
  • Building permit10 240896Closed

    Proposal to install 1 backflow prevention device in an existing multi use condo.

    Aug 20, 2010 · 763 BAY ST
  • Building permit06 187841Closedsecondary suite

    HVAC - Interior fit out to GFand Basement Unit for new 'BMO' Bank.

    Nov 28, 2006 · 763 BAY ST
  • Building permit06 179797Closed

    HVAC - Interior retrofit for future retail tenant & create opening for future stair & lift between ground floor & level P-1.

    Nov 28, 2006 · 763 BAY ST
  • Zoning review06 115876 ZPRClosed
    Mar 9, 2006 · 763 BAY ST
  • Zoning review05 116685 PLOClosed
    Mar 21, 2005 · 763 BAY ST

Check before you build

  • Site-specific exception 900.11.10(2321)

    Needs a closer look

    7 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2321)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 334 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(1) 335 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(1) 397 of former City of Toronto By-law 438-86

  4. Older by-law D

    Section 12(1) 305 of former City of Toronto By-law 438-86

  5. Older by-law E

    Section 12(2) 132 of former City of Toronto By-law 438-86

  6. Older by-law F

    Section 12(2) 208 of former City of Toronto By-law 438-86

  7. Older by-law H

    On the odd numbered addresses of 761-767 Bay St., former City of Toronto by-laws 840-78, 41-79, 245-79, 834-79, 71-91 and City of Toronto by-law 1330-08

4 parts for other addresses
  • G On the odd numbered addresses of 711-717 Bay St., former City of Toronto by-laws 840-78, 41-79, 245-79, 834-79, 71-91 and City of Toronto by-law 1330-08
  • I On 777 Bay St., City of Toronto by-law 1330-08.
  • J On the odd numbered addresses of 1 - 27 College St., former City of Toronto by-laws 840-78, 41-79, 245-79, 834-79, 71-91 and City of Toronto by-law 1330-08
  • K On 444 Yonge St., former City of Toronto by-laws 840-78, 41-79, 245-79, 834-79, 71-91 and City of Toronto by-law 1330-08.
By-law 569-2013, Chapter 900

Lot facts

Area
2,580 m²
Frontage
57.3 mestimated, irregular lot
Depth
55.8 mestimated, irregular lot
Street
Bay St
Corner lot
No
Public lane
None
Max height
61 m
Max lot coverage
—
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Bay Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 7.8 (c2.0; r7.8) SS1 (x2321) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: elm (8 cm), kentucky coffeetree (8 cm), honey locust (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%11 of 11 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
24

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 397 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

    130 ELIZABETH ST · Jan 14, 2026 · 464 m away
  • Minor varianceApproved

    To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

    27 GROSVENOR ST · Jul 30, 2025 · 276 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

    510 YONGE ST · Mar 19, 2025 · 387 m away
  • Minor varianceApproved

    To alter the development standards for the 32-storey and 46-storey, two-tower mixed-use development (approved under Site Specific Zoning By-Law 1096-2021), by extending the temporary use permission for an elevator, which has already been constructed, to provide loading access to the adjacent site at 25 Grosvenor Street for a further period of three years.

    27 GROSVENOR ST · Nov 27, 2024 · 276 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards for the previously approved two-tower mixed-use development (approved under Site Specific Zoning By-law 1096-2021), by reducing the height of a portion of the first storey (to include a mezzanine level located between the first and second storeys). There will be a total of 767 rental dwelling units (of which 30.4% (233 units) will be affordable rental units), as well as a childcare center on this lot. A related Site Plan Control application (under File Number 19 127591 STE 13 SA) has received Notice of Approval conditions.

    27 GROSVENOR ST · Nov 25, 2026 · 276 m away
  • Building permit

    Proposal for replacement of existing windows of office floors from Level 2-24.

    700 BAY ST · Nov 24, 2026 · 197 m away
  • Zoning review

    Closed

    450 YONGE ST · Nov 23, 2026 · 218 m away
  • Building permit

    Proposal for interior demolition of existing office floors from Level 2 - 24.

    700 BAY ST · Nov 23, 2026 · 197 m away
  • Building permit

    POST-TENSIONED CABLE REPLACEMENT, LOCALIZED CONCRETE REPAIRS, NEW WATERPROOFING INSTALLATION

    201 ELIZABETH ST · Nov 20, 2026 · 136 m away
  • Building permit

    Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***

    655 BAY ST · Nov 19, 2026 · 248 m away
  • Building permit

    Interior alterations for a new medical office - Toronto Endoscopy Clinic - Unit 700

    790 BAY ST · Nov 19, 2026 · 104 m away
  • Building permit

    Interior demolition to the 3rd and 4th floors.

    77 GRENVILLE ST · Nov 18, 2026 · 192 m away
  • Building permit

    Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS

    686 BAY ST · Nov 17, 2026 · 286 m away
  • Building permit

    Proposal for interior alterations to install 5 phone booths, sprinkler connections and new strobe lights

    777 BAY ST · Nov 2, 2026 · 76 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
College Station3 min walk
Nearest TTC stop
Bay St at College St1 min walk
Nearest cycling route
Bay StBike Lane, 1 min walk
Nearest traffic count
28,065 vehicles in 14 hCollege St / Bay St, 110 m away, Apr 8, 2025
Serious collisions within 500 m
82021–2026, killed or seriously injured: 2 fatal, 6 with pedestrians, 2 with cyclists
Parks
College Park1 min walk
Joseph Sheard Parkette4 min walk
Opera Place6 min walk

Schools within 1 km

  • THE YMCA ACADEMY SECONDARY SCHOOL Private 7 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 7 min walk
  • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 8 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 9 min walk
  • TMU - HEASLIP HOUSE University 9 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.