HousePrecheckCheck an address

760 Shaw StToronto · zoning, lot size and permit records

Open space · O≈ 28.1 × 64.4 m1,521 m²on Shaw Stcorner, also on Irene Avebacks onto Ln E Carling S Irene Av

Not a home

Irene Ave Parkette

The City of Toronto's real estate inventory lists Irene Ave Parkette here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Major Transit Station Area: ChristieThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 28.1 m frontage≈ 64.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    1,521 m²
    Frontage
    28.1 mestimated, irregular lot
    Depth
    64.4 mestimated, irregular lot
    Street
    Shaw St
    Corner lot
    Yes, also on Irene Ave64.4 m along it
    Public lane
    Ln E Carling S Irene Av, 53.6 m along it
    Max height
    —
    Max lot coverage
    —
    • Major Transit Station Area: Christie. The lot is inside the Christie Major Transit Station Area approved by the Province (Site and Area Specific Policy 660). Source
    • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source
    • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: maple, norway (38 cm), maple, norway (27 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    95%60 of 63 decisions
    Garden suite permits
    0
    Laneway suite permits
    11
    Multiplex permits
    23
    Development applications
    1

    Within 300 m, last 10 years. 34 suite and multiplex permits: more than at 96% of Toronto houses (median 3). 63 variance decisions: more than at 93% of Toronto houses (median 19).

    Latest activity nearby

    • Zoning review

      Not Started

      828 SHAW ST · Nov 25, 2026 · 207 m away
    • Zoning review

      Not Started

      828 SHAW ST · Nov 25, 2026 · 207 m away
    • Building permitsecondary suite

      REV 01: CHANGES TO SECOND FLOOR LAYOUTProposal for additional second unit and removal of wall partition at ground floor.

      671 OSSINGTON AVE · Nov 2, 2026 · 270 m away
    • Zoning review

      Notice Sent

      18 LEEDS ST · Oct 26, 2026 · 212 m away
    • Zoning review

      Closed

      890 BLOOR ST W · Oct 15, 2026 · 152 m away
    • Building permitnew building, new house, secondary suite

      REV 01: Revision to issued permit. Proposal for new 3 storey detached two unit dwelling, with covered front porch, partially covered rear deck & third floor balcony's.

      709 CRAWFORD ST · Oct 14, 2026 · 208 m away
    • Building permitlaneway suite

      Revision 01: Fire safety compliance revisionProposed converting existing garage to garage and laneway suite by second storey addition.

      711 CRAWFORD ST · Oct 8, 2026 · 204 m away
    • Consent (lot split)Pending

      Cancelled

      828 SHAW ST · Oct 6, 2026 · 207 m away
    • Building permit

      PROPOSED INTERIOR ALTERATIONS TO BASEMENT, GROUND, SECOND, AND THIRD FLOORS

      774 SHAW ST · Sep 24, 2026 · 61 m away
    • Building permit

      Proposed rooftop solar panel installation

      333 CONCORD AVE · Sep 21, 2026 · 265 m away

    Neighbourhood: Dovercourt Village

    About the area around the lot, not the lot itself.

    Nearest station
    Ossington Station4 min walk
    Nearest TTC stop
    Bloor St West at Shaw St1 min walk
    Nearest cycling route
    Shaw StBike Lane - Contraflow, 1 min walk
    Nearest traffic count
    149 vehicles in 8 hRoblocke Ave / Irene Ave / Irene Avenue Parkette Trl, 30 m away, Jun 23, 2003
    Serious collisions within 500 m
    72021–2026, killed or seriously injured: 1 fatal, 5 with pedestrians, 3 with cyclists
    Parks
    Irene Avenue Parkette1 min walk
    Christie Pits Park2 min walk
    Northumberland Playground3 min walk

    Schools within 1 km

    • WEST END ALTERNATIVE SCHOOL English Public 5 min walk
    • ST BRUNO & ST RAYMOND CATHOLIC ELEMENTARY SCHOOL (FUTURE SITE) English Separate 6 min walk
    • SACRE COEUR CATHOLIC ELEMENTARY SCHOOL French Separate 9 min walk
    • CENTRAL TORONTO ACADEMY & HORIZON ALTERNATIVE SR English Public 9 min walk
    • ESSEX JR SR & HAWTHORNE TWO BILINGUAL English Public 10 min walk
    • MONTROSE JR & DELTA ALTERNATIVE SR English Public 10 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDovercourt VillageMedian neighbourhood
    Median household income (2020)$87,000$84,500
    Households that own their home55%54%
    Population (2021)12,38016,813
    Homes built in 1960 or before70%29%
    Homes needing major repairs11%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDovercourt VillageCity median
    Assault974.9636.3
    Robbery68.669.5
    Auto theft129.5192.6
    Theft over $5,00022.946.1
    Break and enter236.1172.8
    Theft from vehicles144.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.