Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2021
Needs a closer lookStill open in the City's records: 21 195440 (Proposal to add a retractable glazing to existing condo balcony, 2021, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 Committee of Adjustment file on this lot
Good to know1 approved. A0198/04TEY (This site is located within a block bounded by Dundas Street East, Dalhousie Street, Sh..., 2004).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)11 development applications open within 300 m
Good to know11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
14 records on file: more than at 100% of Toronto houses (median 0).
- Building permit24 216192Closed
Proposed installation of 8mm tempered Retractable Glazing above existing railing to remain. System designed to not transfer any additional load to the existing balcony guard.
Nov 1, 2024 · 76 SHUTER ST - Building permit21 195440Permit Issued
Proposal to add a retractable glazing to existing condo balcony.
Aug 30, 2021 · 76 SHUTER ST - Building permit18 102805Closed
Proposal to install 1 mag lock on the main entrance outer door within existing condo building.
Feb 1, 2018 · 76 SHUTER ST - Building permit11 192717Closed
Proposal to install 1 backflow preventor in existing condo building.
May 19, 2011 · 76 SHUTER ST - Building permit04 180322Closed
Revised to add 2 windows in suite 1401 & 1501
Mar 14, 2007 · 76 SHUTER ST - Building permit06 148184Closed
To install a new sprinkler system in a new 15 storey residential building
Jan 15, 2007 · 76 SHUTER ST - Zoning review06 130571 ZPRClosedMay 1, 2006 · 76 SHUTER ST
- Zoning review05 123672 PSPCancelledApr 15, 2005 · 76 SHUTER ST
Show 6 older records
- Minor varianceA0198/04TEYApproved
This site is located within a block bounded by Dundas Street East, Dalhousie Street, Shuter Street and Mutual Street and is subject to the provisions of Zoning By-law 438-86, as amended, and Site Specific By-law No. 249-91. The proposed development involves the construction of a 15-storey residential building containing 124 dwelling units on a vacant lot and represents the last phase of a larger development of this block. The building will have dimensions of approximately 31.2 by 26.0 metres.
Jun 16, 2004 · 76 SHUTER ST - Zoning review04 139808 PSPClosedMay 27, 2004 · 76 SHUTER ST
- Zoning review03 185075 ZPRClosedOct 10, 2003 · 76 SHUTER ST
- Zoning review95 025748 LTOClosedOct 25, 1995 · 76 SHUTER ST
- Zoning review95 025740 LTOClosedOct 23, 1995 · 76 SHUTER ST
- Zoning review82 026729 LTOClosedDec 16, 1982 · 76 SHUTER ST
Check before you build
Site-specific exception 900.11.10(2391)
Needs a closer look2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 216 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 1,091 m²
- Frontage
- 28.9 m
- Depth
- 38.1 m
- Street
- Shuter St
- Corner lot
- Yes, also on Mutual St38.1 m along it
- Public lane
- None
- Max height
- 46 m
- Max lot coverage
- —
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 5.0 (c0.5; r5.0) SS1 (x2391) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: honey locust shademaster (21 cm), honey locust shademaster (21 cm), honey locust shademaster (18 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 97%29 of 30 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 13
- Development applications
- 49
Within 300 m, last 10 years. 13 suite and multiplex permits: more than at 80% of Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 312 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 167 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 41 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 51 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).
241 CHURCH ST · Jul 30, 2025 · 210 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.
60 QUEEN ST E · Dec 16, 2026 · 219 m away - Building permit
Proposal to install a maglock and access control system on the 8th-floor door.
30 BOND ST · Nov 25, 2026 · 263 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 241 m away - Building permit
Proposal to replace existing pre-action system fire control panel and associated initiating field devices.
30 BOND ST · Nov 19, 2026 · 263 m away - Zoning review
Not Started
134 JARVIS ST · Nov 6, 2026 · 167 m away - Building permit
Sprinklers related to 25-195702 BLD
30 BOND ST · Nov 2, 2026 · 263 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 61 m away - Building permit
INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT
111 QUEEN ST E · Oct 26, 2026 · 240 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 137 m away - Building permit
Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room
25 MUTUAL ST · Oct 19, 2026 · 136 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station7 min walk
- Nearest TTC stop
- Dundas St East at Jarvis St3 min walk
- Nearest cycling route
- Shuter StCycle Track, 1 min walk
- Nearest traffic count
- 10,895 vehicles in 14 hMutual St / Shuter St, 40 m away, Oct 27, 2026
- Serious collisions within 500 m
- 242021–2026, killed or seriously injured: 3 fatal, 17 with pedestrians, 1 with cyclists
- Parks
- Arena Gardens1 min walk
- 45 Dalhousie St Park1 min walk
- Moss Park4 min walk
Schools within 1 km
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 3 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 3 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 4 min walk
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.