HousePrecheckCheck an address

76 Birch AveToronto · zoning, lot size and permit records

Residential · R (d1.0) (x745)≈ 30.5 × 42.1 m1,022 m²on Birch Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 4 development applications open within 300 m, up to 22 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
  • Major Transit Station Area: SummerhillThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 30.5 m frontage≈ 42.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 22 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit17 140804Closed

    Proposed interior alterations to all floors.

    Apr 10, 2017 · 76 BIRCH AVE

Check before you build

  • Site-specific exception 900.2.10(745)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(745)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 262 of former City of Toronto By-law 438-86

  2. Older by-law B

    Former City of Toronto By-law 880-79

4 parts for other addresses
  • C On the lands municipally known as 8-10 Alcorn Ave. in 1988, Section 12 (2) 266(d) of former City of Toronto By-law 438-86
  • D On the even numbered addresses of 22-98A Alcorn Ave., the odd numbered addresses of 63-71 Walker Ave., former City of Toronto by-law 565-80
  • E On the lands municipally known as 46, 54, 60, 62, and 82 Birch Ave. in 1982, Section 12(1) 180 of By-law 438-86
  • F On the lands municipally known as 7 Gange Ave. in 1999, Section 12(1) 448 of former City of Toronto By-law 438-86.
By-law 569-2013, Chapter 900

Lot facts

Area
1,022 m²
Frontage
30.5 mestimated, irregular lot
Depth
42.1 mestimated, irregular lot
Street
Birch Ave
Corner lot
No
Public lane
None
Max height
12 m
Max lot coverage
—
  • Major Transit Station Area: Summerhill. The lot is inside the Summerhill Major Transit Station Area approved by the Province (Site and Area Specific Policy 720). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d1.0) (x745) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, silver (90 cm), falsecypress, japanese (12 cm), maple, japanese (3 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%47 of 51 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
2
Development applications
9

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 51 variance decisions: more than at 86% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition (cantilevered on the southeast side of the dwelling) with a rear covered balcony.

    89 MARLBOROUGH AVE · Jun 3, 2026 · 229 m away
  • Minor varianceApproved

    To alter the existing three-storey detached dwelling by constructing a rear two-storey addition (above the existing rear one-storey addition) with juliet balconies at the second and third storeys. The existing rear second storey outdoor terrace will be converted into habitable space. Also, to construct third storey dormers, and a new front porch canopy.

    23 POPLAR PLAINS CRES · Apr 15, 2026 · 438 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear deck, a rear ground level deck with stairs, and a new front porch with stairs. The existing rear one-storey detached ancillary building (storage area) will be maintained and unaltered.

    38 WALKER AVE · Mar 4, 2026 · 189 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a two-storey rear addition with a ground floor deck with stairs, a rear third floor rooftop deck, and a new front porch with stairs.

    119 MACPHERSON AVE · Feb 18, 2026 · 335 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition, and a rear ground floor deck with stairs. The existing rear two-storey addition will be demolished.

    149 MARLBOROUGH PL · Jan 28, 2026 · 290 m away

Latest activity nearby

  • Minor variancePending

    To construct a new one-storey detached ancillary building (garage containing two parking spaces), in the rear yard, abutting the private laneway.

    154 COTTINGHAM ST · Dec 9, 2026 · 239 m away
  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear ground floor addition (with a basement addition below, including a walkout), a rear second storey addition, and a rear third storey addition with a rear balcony (above the second storey roof).

    49 WALKER AVE · Dec 9, 2026 · 154 m away
  • Minor variancePending

    To construct a new front yard parking pad, abutting Oaklands Avenue.

    13 OAKLANDS AVE · Nov 25, 2026 · 164 m away
  • Zoning review

    Not Started

    1208 YONGE ST · Nov 23, 2026 · 265 m away
  • Building permit

    Party wall admin permit related to roof and stairs beams

    156 COTTINGHAM ST · Nov 16, 2026 · 246 m away
  • Building permit

    REVISION 01: REVISION TO ENLARGE THE PROPOSED DECK AND ROOF STRUCTURE AND REMOVE THE EXISTING CARPORT IN THE REAR YARD .PROPOSED DECK AND ROOF STRUCTURE

    145 MARLBOROUGH PL · Nov 16, 2026 · 278 m away
  • Building permit

    PROPOSED FRONT YARD DECK STAIR ADDITION(scope revised to reinstate back to original deck on Nov 5, 2026)

    100 ALCORN AVE · Nov 16, 2026 · 88 m away
  • Minor variancePending

    In Process

    149 MARLBOROUGH PL · Nov 10, 2026 · 290 m away
  • Building permit

    Proposed 3rd floor addition to an existing two storey semi detached with a rear balcony

    89 MARLBOROUGH AVE · Oct 27, 2026 · 229 m away
  • Building permit

    Proposed structural design of a pergola deck structure

    22 D BIRCH AVE · Oct 26, 2026 · 185 m away

Neighbourhood: Yonge-St.Clair

About the area around the lot, not the lot itself.

Nearest station
Summerhill Station5 min walk
Nearest TTC stop
Yonge St at Alcorn Ave - Summerhill Station5 min walk
Nearest cycling route
Yonge StCycle Track, 5 min walk
Nearest traffic count
333 vehicles in 14 hAlcorn Ave / Walker Ave, 120 m away, May 22, 2024
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 2 with cyclists
Parks
Lionel Conacher Park1 min walk
Marlborough Place Parkette3 min walk
Robertson Davies Park5 min walk

Schools within 1 km

  • COTTINGHAM JR PUBLIC SCHOOL English Public 1 min walk
  • DE LASALLE COLLEGE SCHOOL Private 5 min walk
  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 7 min walk
  • THE LINDEN SCHOOL Private 10 min walk
  • BROWN JR PUBLIC SCHOOL English Public 11 min walk
  • THE MABIN SCHOOL Private 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-St.ClairMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home40%54%
Population (2021)12,90516,813
Homes built in 1960 or before45%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-St.ClairCity median
Assault270.8636.3
Robbery25.869.5
Auto theft64.5192.6
Theft over $5,00032.246.1
Break and enter374172.8
Theft from vehicles116.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.