Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 757 Dufferin St
757 Dufferin St is on a 9.2 m by 39 m lot on Dufferin St in Dufferin Grove. The zoning is R. A site-specific exception, 900.2.10(810), changes some of the usual rules for this address. The lot also fronts Lindsey Ave.
The City has 4 records on this lot since 2000. That is more than at 88% of Toronto houses. In 2024, a building permit was filed: "Drain - to convert existing detached garage to garden suite, scope of work include interior alter to garage and second floor addition to existing garage". Status: closed. In 2024, a Committee of Adjustment application was filed: "To alter the existing one-storey semi-detached ancillary building (garage) by constructing a partial ground floor front addition and a second storey addition…". Status: closed. In 2000, a building permit was filed: "Construct attached garage at rear". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 41 minor variance applications in the last 10 years and approved 85%. Dufferin station is a 13-minute walk.
Summary
What the City's records show on this house
- Records mention garden suiteModerateFree check
- Site-specific exception 900.2.10(810)Moderate
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention garden suite
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Records mention garden suite
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
4 records on file, more than at 88% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2024-08-26 | Building permit24 161755 | Drain - To convert existing detached garage to garden suite, scope of work include interior alter to garage and second floor addition to existing garage | Closed | |
| 2024-02-28 | Minor varianceA0913/23TEY | To alter the existing one-storey semi-detached ancillary building (garage) by constructing a partial ground floor front addition and a second storey addition. The existing parking space will be removed, and this building will contain one garden suite. | Approved | |
| 2023-08-08 | Zoning review23 185816 ZAP | No description on file | Closed | |
| 2000-04-18 | Building permit00 142626 | CONSTRUCT ATTACHED GARAGE AT REAR | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(810)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(810)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(810)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: garden suite
- Multiplex up to 6 units: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x810)
- Height limit
- 11 m
- Corner lot
- Yes, also on Lindsey Ave
- Public lane
- None
- New house permit
- 2000
- House footprint
- 97 m²
- Back yard
- 21.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- 19 suite and multiplex permits within 300 m in 10 years
- 41 minor variance decisions within 300 m, 85% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 6 categories
- Assault: 1.9 times the Toronto median
- Theft over $5,000: 1.9 times the Toronto median
- Robbery: 1.6 times the Toronto median
- Break and enter: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Dufferin Grove neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Dufferin StationNearest station13 min walk
- Dufferin St at College St North SideNearest TTC stop1 min walk
- Lindsey AveNearest cycling route1 min walk
- St Helen Catholic Elementary SchoolSchool5 min walk
- Brock Jr Public SchoolSchool7 min walk
- St Mary Catholic Academy Secondary SchoolSchool8 min walk
- The Orchard Montessori SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31224.5
- Robberycity median 69.5111.3
- Auto theftcity median 192.6111.3
- Theft over $5,000city median 46.187.5
- Break and entercity median 172.8270.3
- Theft from vehiclescity median 188.1278.3
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist