Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 752 Markham St
752 Markham St is on a 7.9 m by 38.4 m lot on Markham St in Annex. The zoning is R.
The City has 5 records on this lot since 1996. That is more than at 93% of Toronto houses. In 2004, a building permit was filed: "Alter plans to reflect changes july/06/04. alter plans as approved by making structural changes". Status: closed. In 2004, a Committee of Adjustment application was filed: "The applicant is seeking relief from the provisions of the zoning by-law no. 438-86 as amended, to maintain as constructed a detached one car garage…". Status: closed. In 1996, a building permit was filed: "Make alterations, build two storey addition with deck at rear. basement entrance at rear and underpin portio nof existing basement. (declaration of use on file)". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open. Bathurst station is a 6-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- No permit for a second unit on fileLowFree check
- 1 development application open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
What the rules allow here: Multiplex up to 6 units · Garden suite · Laneway suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
5 records on file, more than at 93% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2004-07-12 | Building permit99 105300 | Alter plans to reflect changes July/06/04. alter plans as approved by making structural changes. | Closed | |
| 2004-06-16 | Minor varianceA0228/04TEY | The applicant is seeking relief from the provisions of the Zoning By-law No. 438-86 as amended, to maintain as constructed a detached one car garage (dimensions of approx. 4.88m x 10.06m) that contains two mezzanine storage platforms located on the east side (dimensions of approx. 4.57m x 2.44m) and west side (dimensions of approx. 4.57m x 3.35m) of the garage. Also proposed is to construct a roof covered carport (dimensions of approx. 2.83m x 9.75m) at the north side of the garage. | Refused | |
| 2002-08-30 | Zoning review02 168949 ZPR | No description on file | Closed | |
| 2000-01-10 | Building permit00 119966 | Alter plan - Extend foundation walls down 5ft- 0in due to soil conditions, see report & dwgs. refer to appln. # 105300. | Cancelled | |
| 1996-07-05 | Building permit96 016798 | MAKE ALTERATIONS, BUILD TWO STOREY ADDITION WITH DECK AT REAR. BASEMENT ENTRANCE AT REAR AND UNDERPIN PORTIO NOF EXISTING BASEMENT. (DECLARATION OF USE ON FILE). | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: allowed
- Garden suite: likely fits
- Laneway suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Laneway suite
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- Karma Lane, 7.6 m along it
- New house permit
- None since 2000
- House footprint
- 117 m²
- Back yard
- 18.5 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m
- In the Bathurst station area
- 21 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Bathurst StationNearest station6 min walk
- Bathurst St at Barton AveNearest TTC stop3 min walk
- Barton AveNearest cycling route1 min walk
- Palmerston Avenue Jr Public SchoolSchool1 min walk
- Monsignor Fraser College - Annex CampusSchool2 min walk
- Royal St Georges College School - Main AddressSchool5 min walk
- Royal St Georges College School - See HouseSchool5 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist