HousePrecheckCheck an address

75 Rameau DrToronto · zoning, lot size and permit records

Also 77 Rameau Dr, 79 Rameau Dr, 81 Rameau Dr, 83 Rameau Dr, 85 Rameau Dr

Residential townhouse · RT (au220.0)≈ 122.0 × 140.7 m12,371 m²on Rameau Drcorner, also on Lehar Cres

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 180047 PRS 00 IV (Order Issued Property Standards: Eavestrough or roof gutter does not discharge in to a..., 2026, status Order Issued); 26 129022 PRS 00 IR (Property Standards, 2026, status Order Issued).

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 122.0 m frontage≈ 140.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 180047 PRS 00 IV (Order Issued Property Standards: Eavestrough or roof gutter does not discharge in to a..., 2026, status Order Issued); 26 129022 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Rooming House): 25 236674 RMH 00 IR (Rooming House, 2025); 25 100328 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 180047 PRS 00 IVOrder Issued

    Order Issued Property Standards: Eavestrough or roof gutter does not discharge in to a downpipe to drain roof surfaces.; Eavestrough, roof gutter, flashing and/or down pipe not maintained free from obstructions.; The supplied facility in or on the property is not kept in a satisfactory working condition.

    Mar 12, 2026 · 85 RAMEAU DR
  • By-law investigation26 129022 PRS 00 IROrder Issued

    Property Standards

    Mar 12, 2026 · 85 RAMEAU DR
  • By-law investigation25 236674 RMH 00 IRClosed

    Rooming House

    Oct 7, 2025 · 83 RAMEAU DR
  • By-law investigation25 100328 PRS 00 IRClosed

    Property Standards

    Jan 2, 2025 · 79 RAMEAU DR
  • Building permit15 140810Closed

    Permit to install (1) Backflow Prevention Devices (Water only) for townhome complex (75-85 Rameau Drive).

    May 11, 2015 · 75 RAMEAU DR

Lot facts

Area
12,371 m²
Frontage
122 mestimated, irregular lot
Depth
140.7 mestimated, irregular lot
Street
Rameau Dr
Corner lot
Yes, also on Lehar Cres140.7 m along it
Public lane
None
Max height
10.5 m
Max lot coverage
25%
  • Zone RT (au220.0) (Residential Townhouse). Chapter 10, section 10.60 of the by-law. Source
  • 10 City trees in front of this lot. The City's street tree inventory lists 10 trees at this address: maple, norway (19 cm), ginkgo (8 cm), elm, accolade (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposed replacement of timber retaining walls and fences between select backyards at the property - Phase 2 & 3

    135 ROCK FERNWAY · Aug 4, 2026 · 256 m away
  • Building permit

    Basement Interior alterations of interior partition walls, remove and replace existing washroom, plumbing, and flooring.

    89 RAMEAU DR · Jul 10, 2026 · 65 m away
  • Building permit

    Proposed replacement of timber retaining walls and fences between select backyards at property

    135 ROCK FERNWAY · May 27, 2026 · 256 m away
  • Building permit

    BASEMENT WALKOUT

    21 LEHAR CRES · Apr 15, 2026 · 240 m away
  • Building permit

    PROPOSAL FOR BOILER REPLACEMENT.

    5-21 BRAHMS AVE · Mar 18, 2026 · 269 m away
  • Building permit

    REV: Proposed revision for ceiling joist size and direction. And proposed beams to support load bearing walls removal.Proposed interior alterations to existing basement and main-floor of single family dwelling.

    10 LEHAR CRES · Feb 19, 2026 · 152 m away
  • Building permit

    1 wall sign**TWO BRAHMS**

    2-14 BRAHMS AVE · Dec 4, 2025 · 176 m away
  • Building permit

    Proposal to replace existing water main piping.

    23 LISZT GT · Dec 2, 2025 · 166 m away
  • Building permit

    Proposed interior alterations

    105 ROCK FERNWAY · Nov 25, 2025 · 213 m away
  • Building permit

    Proposed interior alterations to basement of existing townhouse

    23 BRACKEN FERNWAY · Jun 16, 2025 · 232 m away

Neighbourhood: Hillcrest Village

About the area around the lot, not the lot itself.

Nearest station
Old Cummer GO Station12 min walk
Nearest TTC stop
Finch Ave East at Liszt Gate3 min walk
Nearest cycling route
Brahms AveSharrows, 4 min walk
Nearest traffic count
17,467 vehicles in 8 hFinch Ave E / Trudy Rd / Liszt Gt / Historic Zion Schoolhouse Trl, 220 m away, Dec 3, 2019
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Willesden Park3 min walk
Linus Park6 min walk
Skymark Park7 min walk

Schools within 1 km

  • CRESTVIEW PUBLIC SCHOOL English Public 7 min walk
  • ECOLE ELEMENTAIRE PAUL DEMERS French Public 8 min walk
  • DON VALLEY MIDDLE SCHOOL English Public 9 min walk
  • CRESTHAVEN PUBLIC SCHOOL English Public 10 min walk
  • OUR LADY OF GUADALUPE CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • MCNICOLL AVENUE SCHOOL BLDG English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHillcrest VillageMedian neighbourhood
Median household income (2020)$86,000$84,500
Households that own their home72%54%
Population (2021)16,34516,813
Homes built in 1960 or before7%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHillcrest VillageCity median
Assault467.3636.3
Robbery166.969.5
Shootings5.610.5
Auto theft116.8192.6
Theft over $5,00083.446.1
Break and enter200.3172.8
Theft from vehicles172.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.