HousePrecheckCheck an address

75 Ormont DrToronto · zoning, lot size and permit records

Employment · EH 1.030.5 × 48.8 m1,486 m²on Ormont Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
N20 m
30.5 m frontage48.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    1 records on file: more than at 53% of Toronto houses (median 0).

    • Building permit09 118970Closed - Dormant

      installation of one backflow preventor

      Apr 22, 2009 · 75 ORMONT DR

    Lot facts

    Area
    1,486 m²
    Frontage
    30.5 m
    Depth
    48.8 m
    Street
    Ormont Dr
    Corner lot
    No
    Public lane
    None
    House footprint
    479 m²roof up to 9.3 m
    Back yard
    14 mhouse to rear lot line
    Side yards
    3.1 m and 4.4 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone EH 1.0 (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
    • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: pine, austrian (48 cm), pine, austrian (44 cm), honey locust (32 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    1

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a loading space deficiency.

      285 GARYRAY DR · Feb 23, 2022 · 402 m away
    • Minor varianceApproved

      To permit a retail store in a portion of the existing building.

      264 GARYRAY DR · Nov 9, 2017 · 443 m away

    Latest activity nearby

    • Building permit

      Proposal for a fire alarm system installation

      201 GARYRAY DR · Nov 19, 2026 · 285 m away
    • Building permit

      Existing RP was removed and replaced with a DCVA. This is the wrong device and has to be replaced with and RP and expansion protection

      250 NORFINCH DR · Feb 20, 2026 · 279 m away
    • Building permit

      1 Wall Sign " BETTER MARBLE "

      300 NORFINCH DR · Feb 9, 2026 · 294 m away
    • Building permit

      The alternative solution is a modification of the original AS by adding a second aerosol cage. The original building permit was #10-316232 and the AS permit #11- 297033.

      46 NORELCO DR · Sep 17, 2024 · 105 m away
    • Building permit

      Proposed new area of aerosol storage in existing warehouse building.

      46 NORELCO DR · Sep 17, 2024 · 105 m away
    • Building permit

      REV 02 - Delete Elevator from designContsruct second storey addition and main floor interior renovation for offices Revised 01 : the layout changed for process one oil room for the elevator at main floor level.

      190 NORELCO DR · Jun 14, 2024 · 179 m away
    • Building permit

      Application for a permit to erect and display one illuminated wall sign. <4*****FORTNA*****

      60 NORELCO DR · Jul 19, 2023 · 37 m away
    • Building permit

      Revision 01: 2nd floor addition to the proposed/approved 1 storey addition. Purpose to increase production capacity for existing metal shop and to add office / storage space. Same footprint as previous proposed 1 storey addition.Proposal to construct an addition to an existing 1 storey industrial building. Purpose to increase production capacity for exising metal shop. No additional staff to be added, no change to existing occupancy.

      250 NORFINCH DR · Jun 5, 2023 · 279 m away
    • Zoning review

      Closed

      60 NORELCO DR · Mar 8, 2023 · 37 m away
    • Building permit

      Second floor addition above existing building, demolish rear second floor, interior alterations to ground floor at rear building and relocate existing temporary white dome

      125 ORMONT DR · Nov 8, 2022 · 242 m away

    Neighbourhood: Humber Summit

    About the area around the lot, not the lot itself.

    Nearest station
    Norfinch Oakdale Station24 min walk
    Nearest TTC stop
    Norelco Dr at Ormont Dr1 min walk
    Nearest traffic count
    5,327 vehicles in 8 hSignet Dr / Ormont Dr, 500 m away, Feb 10, 2022
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Hullmar Park11 min walk
    Elm Park - Etobicoke11 min walk

    Schools within 1 km

    • ST AUGUSTINE CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
    • BLACKSMITH PUBLIC SCHOOL English Public 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHumber SummitMedian neighbourhood
    Median household income (2020)$80,000$84,500
    Households that own their home72%54%
    Population (2021)12,18516,813
    Homes built in 1960 or before16%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHumber SummitCity median
    Assault1031.8636.3
    Robbery191.169.5
    Shootings30.610.5
    Auto theft672.6192.6
    Theft over $5,000191.146.1
    Break and enter397.4172.8
    Theft from vehicles282.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.