HousePrecheckCheck an address

75 Milner AveToronto · zoning, lot size and permit records

Employment · E 0.7 (x181)83.8 × 174.0 m14,477 m²on Milner Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: 25 236549 (Proposal to install solar panels atop existing roof, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
83.8 m frontage174.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (88% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (10% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 3 building permits open, the oldest since 2012

    Needs a closer look

    Still open in the City's records: 23 157575 (Design of fire sprinkler system for phase 2 building addition.Read in conjunction with..., 2023, status Permit Issued); 15 254376 (Backflow prevention device installation for premise isolation - Commercial Storage, 2015, status Permit Issued); 11 330560 (install solar panels on roof top, 2012, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (59% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 236549 (Proposal to install solar panels atop existing roof, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    0 approved. SYS 5020552 (2021).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 236549Examiner's Notice Sent

    Proposal to install solar panels atop existing roof.

    Oct 7, 2025 · 75 MILNER AVE
  • Building permit23 157575Permit Issued

    Design of fire sprinkler system for phase 2 building addition.Read in conjunction with permit 22 222718 BLD.

    Jul 18, 2023 · 75 MILNER AVE
  • Building permit22 222718Closed

    One storey addition to the existing one storey warehouse

    May 24, 2023 · 75 MILNER AVE
  • Minor varianceSYS 5020552Pending
    Nov 5, 2021 · 75 MILNER AVE
  • Building permit21 213335Closed

    Fire sprinkler installation for the proposed building addition related to permit # 20211379

    Oct 29, 2021 · 75 MILNER AVE
  • Zoning review21 151125 ZPRClosed
    May 6, 2021 · 75 MILNER AVE
  • Building permit20 211379Closed

    Proposed one storey addition to the existing one storey building.

    Apr 22, 2021 · 75 MILNER AVE
  • Zoning review19 182380 ZZCClosed
    Jul 3, 2019 · 75 MILNER AVE
Show 7 older records
  • Zoning review17 262781 PSPClosed
    Nov 17, 2017 · 75 MILNER AVE
  • Zoning review16 100639 ZPRClosed
    Jan 5, 2016 · 75 MILNER AVE
  • Building permit15 254376Permit Issued

    Backflow prevention device installation for premise isolation - Commercial Storage

    Dec 16, 2015 · 75 MILNER AVE
  • Zoning review15 173595 ZPRClosed
    Jun 12, 2015 · 75 MILNER AVE
  • Zoning review12 229289 ZPUClosed
    Aug 14, 2012 · 75 MILNER AVE
  • Building permit11 330560Inspection

    install solar panels on roof top

    Feb 17, 2012 · 75 MILNER AVE
  • Zoning review11 231471 ZPUClosed
    Jul 4, 2011 · 75 MILNER AVE

Check before you build

  • Site-specific exception 900.20.10(181)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(181)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    A minimum building setback of 30 metres from the centre line of East Highland Creek. Prevailing By-laws and Prevailing Sections: (None Apply)

  2. Older by-law A

    A minimum building setback of 30 metres from the centre line of East Highland Creek. Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
14,477 m²
Frontage
83.8 m
Depth
174 m
Street
Milner Ave
Corner lot
No
Public lane
None
House footprint
5,240 m²roof up to 7.1 m
Back yard
26.7 mhouse to rear lot line
Side yards
7.6 m and 12.1 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 0.7 (x181) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    Landscaping and Parking Variances required from associated Consent application B0033/22SC. Cross reference associated MV application A0235/22SC. Note: This revised public notice is being issued to correctly state the variances being requested.

    124-126 MILNER AVE · May 4, 2023 · 329 m away
  • Minor varianceApproved

    Landscaping and Parking Variances required from associated Consent application B0033/22SC. Cross reference associated MV application A0234/22SC. Note: This revised public notice is being issued to correctly state the variances being requested.

    124-126 MILNER AVE · May 4, 2023 · 329 m away

Latest activity nearby

  • Building permit

    Proposed sprinkler system upgrade and relocation of exit door.

    115 MILNER AVE · Oct 15, 2026 · 275 m away
  • Building permit

    HVAC - Proposal for interior alterations include new privacy room, new interview room, Power for jewelry and BAF in stockroom.

    47 MILNER AVE · Jul 17, 2026 · 202 m away
  • Building permit

    PROPOSAL FOR ADDING INTERIOR PARTITIONS TO THE OFFICE AND 2 COOLERS & 1 FREEZER.

    70 MILNER AVE · Jul 14, 2026 · 171 m away
  • Building permit

    Structural alterations for loft NEW area to be used for storage only.

    110 MILNER AVE · Feb 17, 2026 · 233 m away
  • Building permit

    2 Wall Sign

    48 MILNER AVE · Dec 2, 2025 · 262 m away
  • Building permit

    2 Wall Sign

    48 MILNER AVE · Nov 26, 2025 · 262 m away
  • Building permit

    Proposal to install solar panels atop existing roof.

    75 MILNER AVE · Oct 7, 2025 · 53 m away
  • Building permit

    Rev. 1 - Proposed roof joist reinforcement for additional mechanical rooftop unit. Proposed interior alteration to an existing restaurant. Add a new kitchen hood.

    43 MILNER AVE · Apr 7, 2025 · 215 m away
  • Building permit

    2 WALL SIGNS

    41 MILNER AVE · Sep 3, 2024 · 236 m away
  • Building permit

    2 WALL SIGN

    41 MILNER AVE · Aug 2, 2024 · 236 m away

Neighbourhood: Agincourt South-Malvern West

About the area around the lot, not the lot itself.

Nearest station
McCowan Rt Station15 min walk
Nearest TTC stop
75 Milner Ave2 min walk
Nearest traffic count
8,166 vehicles in 14 hCorporate Dr: Consilium Pl - Lee Centre Dr, 350 m away, Apr 21, 2024
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Hillsborough Park3 min walk
White Haven Park4 min walk
Lee Centre Park6 min walk

Schools within 1 km

  • TOWN CENTRE LINC English Public 8 min walk
  • CANADIAN TAMIL ACADEMY Private 9 min walk
  • WHITE HAVEN JR PUBLIC SCHOOL English Public 9 min walk
  • MADINATUL ULOOM ACADEMY INC Private 9 min walk
  • MADINATUL ULOOM ISLAMIC GIRLS ACADEMY Private 10 min walk
  • MADINATUL ULOOM ISLAMIC ACADEMY & OXFORD COLLEGE & FH INTERNATIONAL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAgincourt South-Malvern WestMedian neighbourhood
Median household income (2020)$79,500$84,500
Households that own their home70%54%
Population (2021)24,17016,813
Homes built in 1960 or before10%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAgincourt South-Malvern WestCity median
Assault467636.3
Robbery94.869.5
Homicide75.3
Shootings21.110.5
Auto theft273.9192.6
Theft over $5,00038.646.1
Break and enter259.9172.8
Theft from vehicles242.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.