HousePrecheckCheck an address

75 Millwick DrToronto · zoning, lot size and permit records

Employment · E 1.036.6 × 110.9 m4,057 m²on Millwick Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 15 244327 (Revision #1 - Removal of wall between shippig area, and man doorProposal to remove exis..., 2016, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
36.6 m frontage110.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 15 244327 (Revision #1 - Removal of wall between shippig area, and man doorProposal to remove exis..., 2016, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A138/15EYK (To maintain the existing industrial building within the new property boundaries, munici..., 2015).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Building permit15 244327Revision Issued

    Revision #1 - Removal of wall between shippig area, and man doorProposal to remove existing lower roof to create a new higher roof and larger overhead door.

    Aug 11, 2016 · 75 MILLWICK DR
  • Minor varianceA138/15EYKApproved

    To maintain the existing industrial building within the new property boundaries, municipally known as 75 Millwick Drive (Parts 1 & 4).

    Apr 23, 2015 · 75 MILLWICK DR
  • Zoning review14 223775 ZPRClosed
    Sep 17, 2014 · 75 MILLWICK DR
  • Zoning review14 223767 ZPRClosed
    Sep 17, 2014 · 75 MILLWICK DR
  • Zoning review14 200711 ZPRClosed
    Aug 1, 2014 · 75 MILLWICK DR
  • Building permit12 216431Closed

    Installation of 2 backflow prevention devices

    Aug 27, 2012 · 75 MILLWICK DR

Lot facts

Area
4,057 m²
Frontage
36.6 m
Depth
110.9 m
Street
Millwick Dr
Corner lot
No
Public lane
None
House footprint
2,538 m²roof up to 7.1 m
Back yard
18.3 mhouse to rear lot line
Side yards
0 m and 2.9 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
33%1 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a one-storey addition along the east side of the existing building.

    226 TORYORK DR · Jun 12, 2025 · 348 m away
  • Minor varianceApproved

    To construct a one-storey rear addition.

    184 TORYORK DR · Nov 21, 2024 · 489 m away
  • Minor varianceApproved

    To permit a vehicle dealerhsip in a portion of the existing building.

    266 TORYORK DR · Nov 8, 2018 · 411 m away
  • Minor varianceRefused

    To permit a vehicle dealership.

    78 MILLWICK DR · Sep 13, 2018 · 127 m away
  • Minor varianceRefused

    To permit a vehicle dealership.

    94-96 MILLWICK DR · Mar 22, 2018 · 175 m away

Latest activity nearby

  • Zoning review

    Not Started

    98 MILLWICK DR · Nov 23, 2026 · 212 m away
  • Building permit

    Proposed 1 storey rear addition

    43 MILLWICK DR · Nov 19, 2026 · 232 m away
  • Building permit

    Proposal for a second stroey addition.

    237 TORYORK DR · Nov 17, 2026 · 285 m away
  • Building permit

    REV01: Revision to 24 230185 BLD 00 BA to raise roof of a building and structural redesign.PROPOSED RAISING THE ROOF OF A BUILDING AND NEW LOADING DOCK

    200-202 MILVAN DR · Oct 7, 2026 · 291 m away
  • Zoning review

    Closed

    237 TORYORK DR · Jul 9, 2026 · 285 m away
  • Building permit

    Upgrade existing fire protection system to meet storage requirements

    154-160 MILVAN DR · May 19, 2026 · 166 m away
  • Zoning review

    Closed

    181 MILVAN DR · Dec 18, 2025 · 187 m away
  • Building permit

    Proposaal for replace/repair building components damaged from roof collapse.

    190 MILVAN DR · May 27, 2025 · 257 m away
  • Zoning review

    Application On Hold

    43 MILLWICK DR · May 12, 2025 · 232 m away
  • Zoning review

    Cancelled

    60-66 MILLWICK DR · Apr 17, 2025 · 161 m away

Neighbourhood: Humber Summit

About the area around the lot, not the lot itself.

Nearest station
Duncanwoods Station20 min walk
Nearest TTC stop
135 Milvan Dr3 min walk
Nearest traffic count
7,639 vehicles in 8 hMillwick Dr / Milvan Dr (North), 290 m away, Feb 14, 2012
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Knights of Columbus Park10 min walk
Whitfield Parkette10 min walk
Gracedale Park11 min walk

Schools within 1 km

  • ST ROCH CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • GRACEDALE PUBLIC SCHOOL English Public 10 min walk
  • HUMBER SUMMIT MDL SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumber SummitMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home72%54%
Population (2021)12,18516,813
Homes built in 1960 or before16%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumber SummitCity median
Assault1031.8636.3
Robbery191.169.5
Shootings30.610.5
Auto theft672.6192.6
Theft over $5,000191.146.1
Break and enter397.4172.8
Theft from vehicles282.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.