Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 75 Jarvis St
75 Jarvis St is on a 6.6 m by 19.8 m lot on Jarvis St in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(339), changes some of the usual rules for this address. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.
The City has 5 records on this lot since 2011. That is more than at 93% of Toronto houses. In 2018, a building permit was filed: "Proposed kitchen exhaust in existing restaurant". Status: closed. In 2012, a building permit was filed: "Revision to existing building permit - revision for as built changes proposal for interior alterations to ground floor and basement to convert existing retail…". Status: closed. In 2011, a building permit was filed: "To erect and display two non-illuminated wall signs, each with static copy and each at the northerly-facing first storey building wall, in conjunction with an…". Status: closed. Nothing on file is open right now.
Within 300 m, 10 development applications are open (the tallest up to 65 storeys). Within 300 m, the Committee of Adjustment decided 15 minor variance applications in the last 10 years and approved 93%. King station is a 9-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: in a Heritage Conservation District (Part V)Moderate
- Site-specific exception 900.11.10(339)Moderate
- 10 development applications open within 300 mLowFree check
- King-Parliament Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
5 records on file, more than at 93% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2018-09-05 | Building permit18 214116 | Proposed kitchen exhaust in existing restaurant | Closed | |
| 2012-03-23 | Building permit11 216169 | REVISION TO EXISTING BUILDING PERMIT - REVISION FOR AS BUILT CHANGES Proposal for interior alterations to ground floor and basement to convert existing retail store to a cafe "G For Gelato" containing 32 seats (with basement storage), as well as a front yard patio containing 16 seats (243m2) in existing mixed-use building. PROPOSAL REVISED: Cafe containing 30 seats - Group E occupancy - with basement storage. NO PATIO | Closed | |
| 2011-10-12 | Zoning review11 290879 LPR | No description on file | Closed | |
| 2011-08-11 | Building permit11 233085 | To erect and display two non-illuminated wall signs, each with static copy and each at the northerly-facing first storey building wall, in conjunction with an existing restaurant/gelato bar operating on the premises. **G for Gelato and Espresso Bar** | Closed | |
| 2011-06-10 | Building permit11 216182 | Proposal to install kitchen exhaust system for new restaurant containing 32 interior seats, and 16 seats for the front patio, under file 11-216169 BLD. "G For Gelato". | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: in a Heritage Conservation District (Part V)
- Site-specific exception 900.11.10(339)
What this part means for this house, in plain EnglishUnlock
Heritage property: in a Heritage Conservation District (Part V)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(339)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
King-Parliament Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(339)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR SS1 (x339)
- Height limit
- 90 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 126 m²
- Back yard
- 0 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 10 development applications open within 300 m, up to 65 storeys
- In the Moss Park station area
- 15 minor variance decisions within 300 m, 93% approved
What this part means for this house, in plain EnglishUnlock
10 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Assault: 3.5 times the Toronto median
- Robbery: 2.4 times the Toronto median
- Break and enter: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Moss Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- King StationNearest station9 min walk
- King St West at Jarvis St East SideNearest TTC stop2 min walk
- Adelaide St ENearest cycling route1 min walk
- George Brown College - St James CampusSchool2 min walk
- Keystone International SchoolsSchool5 min walk
- Downtown Alternative SchoolSchool7 min walk
- St Michael Catholic Elementary School - Bldg 1School7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32226.8
- Robberycity median 69.5166.6
- Homicidecity median 5.33.4
- Shootingscity median 10.53.4
- Auto theftcity median 192.681.6
- Theft over $5,000city median 46.164.6
- Break and entercity median 172.8350.2
- Theft from vehiclescity median 188.1275.4
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist