HousePrecheckCheck an address

75 Hupfield TrlToronto · zoning, lot size and permit records

≈ 131.8 × 157.6 m14,003 m²on Hupfield Trlcorner, also on Horseshoe Cres

Not a home

Sacred Heart Catholic Elementary School

The City's school locations place Sacred Heart Catholic Elementary School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 23 214075 (Design of a fire alarm system upgrade including but not limited to the replacement of t..., 2023, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 131.8 m frontage≈ 157.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2023

    Needs a closer look

    Still open in the City's records: 23 214075 (Design of a fire alarm system upgrade including but not limited to the replacement of t..., 2023, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation25 231905 SIN 00 IRClosed

    Signs

    Sep 28, 2025 · 75 HUPFIELD TRL
  • Building permit24 151869Closed

    Proposed installation of a new air conditioning units for cooling centre in gym of an existing elementary school.

    May 22, 2024 · 75 HUPFIELD TRL
  • Building permit23 214075Permit Issued

    Design of a fire alarm system upgrade including but not limited to the replacement of the fire alarm system control panel and associated auxiliary devices.

    Oct 23, 2023 · 75 HUPFIELD TRL
  • Building permit11 215912Closeddemolition

    demolition of one (1) PORTABLE CLASSROOMS at Sacred Heart Catholic School

    Jun 29, 2011 · 75 HUPFIELD TRL
  • Building permit06 120879Closed - Dormant

    emergency lighting replacement - Sacred Heart C.S.

    Apr 4, 2006 · 75 HUPFIELD TRL
  • Building permit04 108076Closed

    Installation of security screen/window in school office. Existing and proposed: Elementary School. (Sacred Heart Catholic School).

    Feb 19, 2004 · 75 HUPFIELD TRL
  • Building permit01 117043Closeddemolition

    DEMOLITION OF ONE PORTABLE CLASSROOM

    Mar 13, 2001 · 75 HUPFIELD TRL

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
14,003 m²
Frontage
131.8 mestimated, irregular lot
Depth
157.6 mestimated, irregular lot
Street
Hupfield Trl
Corner lot
Yes, also on Horseshoe Cres157.6 m along it
Public lane
None
House footprint
3,688 m²roof up to 9.9 m
Back yard
50.9 mhouse to rear lot line
Side yards
19 m and 31.4 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a 96 unit residential townhouse development. This site has been rezoned (By-law 253-2014) to permit the proposed development and the site plan review process (13 116984 ESC 42 SA) has been completed. The applicant is seeking relief from the by-law to alter the unit composition and depth.

      1355 NEILSON RD · Apr 14, 2016 · 392 m away
    • Minor varianceApproved

      To construct a walk out stair from the basement to the garage.

      46 GLANVIL CRES · Jun 2, 2010 · 278 m away
    • Minor varianceApproved

      To legalize and to maintain a one-storey addition to the rear of the two-storey dwelling, constructed without proper authorization.

      60 GREENLEAF TER · Jan 27, 2010 · 449 m away
    • Minor varianceApproved

      The applicant proposes to establish a beauty supply and personal service use in Unit 101, which is 60 square metres (645.2 square feet) The applicant is requesting permission to use 51 square metres (545.2 squre feet) for retail use, and the remaining 9 square metres (100 square feet) to be used as personal service use. The Zoning By-law permits a Personal Service Shop, however the retail component would not be a permitted use.

      1371 NEILSON RD · Mar 16, 2005 · 329 m away
    • Minor varianceApproved

      The applicant is proposing to install an 18.6 square metre (200 square foot) news and convenience item retail kiosk on the ground floor, for the use of the 4-storey medical and professional office building's occupants.

      1371 NEILSON RD · Dec 4, 2002 · 329 m away

    Latest activity nearby

    • Building permitsecondary suite

      Proposal for designing a basement as per OBC in order to register the basement as a second dwelling unit/legal basement with separate below grade entrance.

      9 HORSESHOE CRES · Oct 16, 2026 · 125 m away
    • Building permit

      supply and install backwater valve

      57 HORSESHOE CRES · Sep 29, 2026 · 168 m away
    • Building permitsecondary suite

      Proposal for designing a basement as per OBC in order to register the basement as a second dwelling unit/legal basement with separate below grade entrance.

      9 HORSESHOE CRES · Sep 25, 2026 · 125 m away
    • Building permit

      Proposal for a below grade side yard basement walkout with a side basement entrance to this existing detached SFD.

      20 HORSESHOE CRES · Aug 18, 2026 · 178 m away
    • Building permit

      FIRE ALARM SYSTEM REPLACEMENT

      135 HUPFIELD TRL · Jul 16, 2026 · 274 m away
    • Building permit

      Proposal for an enclosed addition structure.

      11 GLANVIL CRES · Jun 19, 2026 · 189 m away
    • Building permit

      Proposed installation of a new air conditioning units for cooling centre in gym of an existing elementary school.

      75 HUPFIELD TRL · May 22, 2024 · 27 m away
    • Building permit

      Proposal to construct a below grade entrance.

      78 PENNYHILL DR · Feb 28, 2024 · 222 m away
    • Building permit

      Design of a fire alarm system upgrade including but not limited to the replacement of the fire alarm system control panel and associated auxiliary devices.

      75 HUPFIELD TRL · Oct 23, 2023 · 27 m away
    • Building permit

      Proposal for Sealant Replacements & Balcony Repairs

      480 MCLEVIN AVE · Oct 18, 2023 · 204 m away

    Neighbourhood: Malvern East

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Hupfield Trail at Horseshoe Cres (North)1 min walk
    Nearest cycling route
    Finch Ave EBike Lane, 10 min walk
    Nearest traffic count
    8,654 vehicles in 14 hMcLevin Ave / Hupfield Trl, 210 m away, Dec 11, 2024
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Viola Desmond Park1 min walk
    Malvern Park3 min walk
    Neilson Park - Scarborough4 min walk

    Schools within 1 km

    • SACRED HEART CATHOLIC ELEMENTARY SCHOOL English Separate 1 min walk
    • MARY SHADD PUBLIC SCHOOL English Public 4 min walk
    • ST MOTHER TERESA CATHOLIC ACADEMY English Separate 8 min walk
    • ST GABRIEL LALEMANT CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
    • MALVERN MONTESSORI SCHOOL Private 9 min walk
    • WHITEFIELD CHRISTIAN SCHOOLS - BLDG 2 Private 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMalvern EastMedian neighbourhood
    Median household income (2020)$85,000$84,500
    Households that own their home70%54%
    Population (2021)26,09516,813
    Homes built in 1960 or before4%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMalvern EastCity median
    Assault505.9636.3
    Robbery80.869.5
    Auto theft224.8192.6
    Theft over $5,00035.146.1
    Break and enter80.8172.8
    Theft from vehicles186.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.