HousePrecheckCheck an address

75 Elizabeth StToronto · zoning, lot size and permit records

Also 77 Elizabeth St, 81 Elizabeth St

Commercial residential · CR 6.0 (c6.0; r3.5) SS1 (x2251)24.8 × 27.6 m669 m²on Elizabeth Stcorner, also on Hagerman St

Not a home

Water Revenue Office Site

The City of Toronto's real estate inventory lists Water Revenue Office Site here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A public buildingVisitors and traffic in its open hours; usually quiet at night.
  • Permits or applications open on this parcelStill open in the City's records: 18 156666 (Proposed interior alterations to existing office space for tenant requirements, 2018, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 72 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • Major Transit Station Area: DundasThe City plans more homes around the station: good for transit, and more building over time.
N10 m
24.8 m frontage27.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2018

    Needs a closer look

    Still open in the City's records: 18 156666 (Proposed interior alterations to existing office space for tenant requirements, 2018, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 72 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit24 124971Closed

    REV 01: To provide one new sump pit in the basement Plumbing - Proposed interior alterations.

    Nov 15, 2024 · 75 ELIZABETH ST
  • Building permit23 205733Closed

    Plumbing - Warming Centre - Interior Renovations

    Sep 27, 2023 · 75 ELIZABETH ST
  • Building permit23 186036Cancelled

    REVISION 01: Light Interior RenovationsProposal for interior alterations to convert existing 3 storey office building to a Warming Centre/Shelter. Ground floor to be occupied; 2nd and 3rd floors to remain vacant with no occupancy.

    Sep 22, 2023 · 75 ELIZABETH ST
  • Building permit18 246963Closed

    Proposal for interior alterations to existing office building. unit 200

    Nov 8, 2018 · 75 ELIZABETH ST
  • Building permit18 156666Inspection

    Proposed interior alterations to existing office space for tenant requirements.

    Jun 14, 2018 · 75 ELIZABETH ST
  • Building permit14 251357Closed

    OTHER, PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) IN EXISTING BUILDING - CITY HALL ANCILLARY OFFICE BLDG

    Nov 24, 2014 · 75 ELIZABETH ST
  • Building permit01 113846Closed - Dormant

    alter hvac system and related ductwork cost included in bp# 01-106673

    Mar 5, 2001 · 75 ELIZABETH ST
  • Building permit01 106673Closed

    Make interior alterations to 1st and 2nd floor for existing office PAID BY JOURNAL ENTRY

    Feb 23, 2001 · 75 ELIZABETH ST
Show 1 older records
  • Building permit98 023765Closed

    H.V.A.C. ALTER H.V.A.C. SYSTEM THROUGHOUT BUILDING. EDC PROJECT ID R0020158

    Nov 18, 1998 · 75 ELIZABETH ST

Check before you build

  • Site-specific exception 900.11.10(2251)

    Needs a closer look

    5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2251)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 334 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(1) 335 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(1) 397 of former City of Toronto By-law 438-86

  4. Older by-law D

    Section 12(2) 132 of former City of Toronto By-law 438-86

  5. Older by-law E

    Section 12(2) 260 of former City of Toronto By-law 438-86

2 parts for other addresses
  • F On 532 Bay St., 570 Bay St., 111 Elizabeth St., 91 Elizabeth St., 9 Foster Pl., City of Toronto by-law 680-04
  • G On 532 Bay St., 570 Bay St., 111 Dundas St. W., 111 Elizabeth St., 91 Elizabeth St., 9 Foster Pl., City of Toronto by-law 848-00.
By-law 569-2013, Chapter 900

Lot facts

Area
669 m²
Frontage
24.8 m
Depth
27.6 m
Street
Elizabeth St
Corner lot
Yes, also on Hagerman St27.6 m along it
Public lane
None
House footprint
646 m²roof up to 18.3 m
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
30 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 6.0 (c6.0; r3.5) SS1 (x2251) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
88%7 of 8 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
0
Development applications
16

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 407 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

    130 ELIZABETH ST · Jan 14, 2026 · 211 m away
  • Minor varianceApproved

    To permit a place of amusement (arcade) use on this subject lot.

    247 YONGE ST · Jan 8, 2025 · 367 m away
  • Minor varianceApproved

    To construct a new 12-storey mixed-use building with a total of 30 residential dwelling units and two non-residential (commercial) units on this lot. The property owner will be undergoing a Site Plan Control application.

    203 DUNDAS ST W · Oct 16, 2024 · 245 m away
  • Minor varianceApproved

    To permit an amusement arcade use (claw machines) on the ground level of the existing three-storey commercial building.

    340 YONGE ST · Oct 25, 2023 · 440 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever the property into two lots and to create new easements/rights-of-way.

    123 EDWARD ST · Oct 2, 2027 · 248 m away
  • Building permit

    Proposal for interior alterations to existing office suite. To include HVAC, sprinkler alterations.

    393 UNIVERSITY AVE · Nov 23, 2026 · 228 m away
  • Building permit

    Installation of two (2) temporary structures for Cavalcade of Lights 2026 (Event)30' x 30' Tent for Arts & Crafts Supplied by Gervais Tents20' x 16' x 5' Theatre Stage Extension Riser Supplied by PSIInstall 11/25/2026 / Removal 11/29/2026

    100 QUEEN ST W · Nov 19, 2026 · 97 m away
  • Building permit

    Proposed an interior alteration

    595 BAY ST · Nov 19, 2026 · 237 m away
  • Building permit

    Proposal for interior alterations for Suite 2105 &2103

    180 DUNDAS ST W · Nov 18, 2026 · 214 m away
  • Building permit

    Proposal for interior alterations including furniture & elevator refurbishment.

    100 QUEEN ST W · Nov 18, 2026 · 97 m away
  • Building permit

    INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO

    121 DUNDAS ST W · Nov 17, 2026 · 124 m away
  • Building permit

    Tenant improvement to existing office suite located on the 8th floor of 375 University Avenue. No changes of use or exterior work proposed. No change to existing demising walls of suite.

    375 UNIVERSITY AVE · Nov 17, 2026 · 230 m away
  • Building permit

    Mechanical retrofit to improve building energy efficiency including working in various building Mechanical rooms and roofs. Work will be done on the chilled water, heating water and glycol piping networks. Equipment will be updated and replaced including rooftop air-source heat pumps, heat recovery chillers, updated air handling equipment, and steam network modifications.

    124 EDWARD ST · Nov 9, 2026 · 288 m away
  • Building permit

    Proposed interior alterations to an existing office suite, including demolition and construction of interior partitions, millwork, and associated mechanical, electrical, plumbing, sprinkler, and fire alarm modifications. Suite 401

    595 BAY ST · Nov 9, 2026 · 237 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
St Patrick Station5 min walk
Nearest TTC stop
Bay St at Hagerman St1 min walk
Nearest cycling route
Bay StSharrows - Arterial, 2 min walk
Nearest traffic count
3,648 vehicles in 14 hChestnut St / Armoury St, 90 m away, Oct 15, 2025
Serious collisions within 500 m
92021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 1 with cyclists
Parks
Larry Sefton Park1 min walk
Trinity Square2 min walk
Cloud Gardens8 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 4 min walk
  • OCAD UNIVERSITY - THE LEARNING ZONE University 8 min walk
  • CONTACT ALTERNATIVE SCHOOL English Public 8 min walk
  • TMU - HEASLIP HOUSE University 8 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 8 min walk
  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.