HousePrecheckCheck an address

75 Densley AveToronto · zoning, lot size and permit records

Employment · E 1.022.9 × 91.4 m2,089 m²on Densley Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 11 214213 (Spray booth installation in a fence and railing manufacturer, 2011, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
22.9 m frontage91.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2011

    Needs a closer look

    Still open in the City's records: 11 214213 (Spray booth installation in a fence and railing manufacturer, 2011, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit16 158809Closed

    Proposal to install a 3/4 inch back flow prevention device.

    Jul 19, 2016 · 75 DENSLEY AVE
  • Building permit11 214213Inspection

    Spray booth installation in a fence and railing manufacturer.

    Jul 7, 2011 · 75 DENSLEY AVE

Lot facts

Area
2,089 m²
Frontage
22.9 m
Depth
91.4 m
Street
Densley Ave
Corner lot
No
Public lane
None
House footprint
822 m²roof up to 8.4 m
Back yard
28.7 mhouse to rear lot line
Side yards
2.7 m and 4.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a recreational use (padel court) within the rear of the existing industrial building.

    9 DENSLEY AVE · Jul 16, 2026 · 415 m away
  • Minor varianceApproved

    To permit a parking deficiency.

    9 DENSLEY AVE · Nov 7, 2024 · 415 m away
  • Minor varianceRefused

    To construct a one-storey addition along the rear side of the existing buildings at 17 and 21 Milford Avenue.

    15 MILFORD AVE · Feb 23, 2023 · 371 m away
  • Minor varianceApproved

    To convert the existing second storey into nine residential units and two offices.

    2265 KEELE ST · Jan 26, 2023 · 486 m away
  • Minor varianceApproved

    To construct a second storey addition above the existing mixed-use building.

    30 MILFORD AVE · Oct 14, 2021 · 283 m away

Latest activity nearby

  • Building permit

    Proposal to replace rear windows, renovate existing offices and conference hall, construct a side addition, and build a retaining wall.

    47 DENSLEY AVE · Nov 23, 2026 · 143 m away
  • Zoning review

    Not Started

    1 HAFIS RD · Nov 9, 2026 · 181 m away
  • Minor variancePending

    Cancelled

    25 SABLE ST · Sep 22, 2026 · 220 m away
  • Building permit

    Revision 01 - increase the occupant load - staff to 18 persons based on provision of exisitng universal washroom - as per OBC 3.7.4.2 (8) - OBC 2012. Also change a washroom to laundry roomProposal for interior alterations to existing childcare center

    101-111 LOTHERTON PTWY · Jun 30, 2026 · 262 m away
  • Zoning review

    Closed

    76 DENSLEY AVE · Mar 27, 2026 · 100 m away
  • Building permit

    Revision 1: Proposal for a north side and Level 2 addition, as well as interior alteration to a two storey office and storage building. The scope includes associated mechanical, electrical and structural work.

    23 SABLE ST · Jan 14, 2026 · 200 m away
  • Building permit

    Proposal to reconstruct the existing concrete block wall along the property line in accordance with City of Toronto Order to Comply number 25 223318 WNP 00 VI

    111 INGRAM DR · Dec 9, 2025 · 287 m away
  • Zoning review

    Closed

    65 DENSLEY AVE · Nov 19, 2025 · 85 m away
  • Building permit

    Revision: to reflect as built condition - outdoor equiplent storage

    20 HAFIS RD · Oct 22, 2025 · 288 m away
  • Building permit

    Proposal for new floor drains.

    20 HAFIS RD · Aug 21, 2025 · 288 m away

Neighbourhood: Brookhaven-Amesbury

About the area around the lot, not the lot itself.

Nearest station
Caledonia Station23 min walk
Nearest TTC stop
Sheffield St at Densley Ave South Side1 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 16 min walk
Nearest traffic count
4,332 vehicles in 8 hColville Rd / Sheffield St, 340 m away, Oct 9, 2002
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Glen Park Parkette8 min walk
Joyce Park9 min walk
Westview Greenbelt10 min walk

Schools within 1 km

  • GEORGE ANDERSON PUBLIC SCHOOL English Public 11 min walk
  • JOYCE PUBLIC SCHOOL English Public 14 min walk
  • IMMACULATE CONCEPTION CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBrookhaven-AmesburyMedian neighbourhood
Median household income (2020)$73,000$84,500
Households that own their home41%54%
Population (2021)17,49516,813
Homes built in 1960 or before30%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBrookhaven-AmesburyCity median
Assault610.9636.3
Robbery62.769.5
Homicide5.25.3
Shootings10.410.5
Auto theft193.2192.6
Theft over $5,0004746.1
Break and enter167.1172.8
Theft from vehicles182.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.