HousePrecheckCheck an address

75 Dalhousie StToronto · zoning, lot size and permit records

Commercial residential · CR 5.0 (c0.5; r5.0) SS1 (x2241)49.9 × 36.5 m1,732 m²on Dalhousie St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 14 development applications open within 300 m, up to 71 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: DundasThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
49.9 m frontage36.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 25 218997 PRS 00 IV (Order Issued Property Standards: Dwelling unit is not connected by two way voice commun..., 2025); 25 213699 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 14 development applications open within 300 m

    Good to know

    14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation25 218997 PRS 00 IVClosed

    Order Issued Property Standards: Dwelling unit is not connected by two way voice communication system and security locking release mechanism to the principle entrance of the building.

    Aug 20, 2025 · 75 DALHOUSIE ST
  • By-law investigation25 213699 PRS 00 IRClosed

    Property Standards

    Aug 20, 2025 · 75 DALHOUSIE ST
  • Building permit20 205661Closed

    Proposal to modify the single bathroom into double bathroom including installation of new shower, toilet, and lavatory.

    Dec 3, 2020 · 75 DALHOUSIE ST
  • Building permit19 202008Closed

    Proposal to install 2 maglocks in the garage levels at P1 and P2

    Aug 26, 2019 · 75 DALHOUSIE ST
  • Building permit11 132834Closed

    Proposal to create new door opening to roof terrace on 12th floor from a public corridor. Existing Condo building.

    May 25, 2012 · 75 DALHOUSIE ST
  • Building permit11 265645Closed

    Proposal to install one back flow preventor

    Sep 8, 2011 · 75 DALHOUSIE ST
  • Building permit06 156069Closed

    Install maglock in parking garage on level P-1.

    Jul 28, 2006 · 75 DALHOUSIE ST

Check before you build

  • Site-specific exception 900.11.10(2241)

    Needs a closer look

    4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2241)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 333 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(1) 334 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(1) 335 of former City of Toronto By-law 438-86

  4. Older by-law D

    Section 12(2) 132 of former City of Toronto By-law 438-86

3 parts for other addresses
  • E On 81 Dalhousie St., and the even numbered addresses of 78-88 Mutual St., Section 12(2) 216 former City of Toronto by-law 438-86
  • F On 81 Dalhousie St., 99 Dalhousie St., 125 Dundas St. E., the even numbered addresses of 78-88 Mutual St., former City of Toronto by-law 247-91
  • G On 125 Dundas St. W., Section 12(2) 260 of former City of Toronto by-law 438-86.
By-law 569-2013, Chapter 900

Lot facts

Area
1,732 m²
Frontage
49.9 m
Depth
36.5 m
Street
Dalhousie St
Corner lot
No
Public lane
None
Max height
46 m
Max lot coverage
—
  • Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 5.0 (c0.5; r5.0) SS1 (x2241) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
96%26 of 27 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
13
Development applications
52

Within 300 m, last 10 years. 13 suite and multiplex permits: more than at 80% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 307 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 214 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 85 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 73 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 164 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.

    60 QUEEN ST E · Dec 16, 2026 · 248 m away
  • Building permit

    Proposal to install a maglock and access control system on the 8th-floor door.

    30 BOND ST · Nov 25, 2026 · 263 m away
  • Building permit

    Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.

    99 QUEEN ST E · Nov 20, 2026 · 280 m away
  • Building permit

    Proposal to replace existing pre-action system fire control panel and associated initiating field devices.

    30 BOND ST · Nov 19, 2026 · 263 m away
  • Zoning review

    Not Started

    134 JARVIS ST · Nov 6, 2026 · 214 m away
  • Building permit

    Sprinklers related to 25-195702 BLD

    30 BOND ST · Nov 2, 2026 · 263 m away
  • Zoning review

    Closed

    78 MUTUAL ST · Oct 28, 2026 · 36 m away
  • Building permit

    INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT

    111 QUEEN ST E · Oct 26, 2026 · 281 m away
  • Zoning review

    Not Started

    207 JARVIS ST · Oct 21, 2026 · 163 m away
  • Building permit

    Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room

    25 MUTUAL ST · Oct 19, 2026 · 182 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
TMU Station7 min walk
Nearest TTC stop
Dundas St East at Church St2 min walk
Nearest cycling route
Shuter StCycle Track, 1 min walk
Nearest traffic count
10,895 vehicles in 14 hMutual St / Shuter St, 80 m away, Oct 27, 2026
Serious collisions within 500 m
242021–2026, killed or seriously injured: 3 fatal, 16 with pedestrians, 2 with cyclists
Parks
Arena Gardens1 min walk
45 Dalhousie St Park2 min walk
Moss Park4 min walk

Schools within 1 km

  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 2 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 3 min walk
  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 3 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 3 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.