HousePrecheckCheck an address

75 Crockford BlvdToronto · zoning, lot size and permit records

Employment · E 1.018.4 × 78.9 m1,455 m²on Crockford Blvd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N20 m
18.4 m frontage78.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (28% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (20% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (17% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 4 Committee of Adjustment files on this lot

    Good to know

    3 approved. A0047/26SC (To construct a one storey rear addition to the existing one storey commercial vehicle s..., 2026); A205/14SC (The Committee of Adjustment approved a variance in January 2010 to allow vehicle servic..., 2014); A026/12SC (To provide vehicle service to area businesses and the general public. The Committee of..., 2012); and 1 more.

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 261611 LPRNot Started
    Oct 28, 2026 · 75 CROCKFORD BLVD
  • Zoning review26 232131 LPRClosed
    Sep 3, 2026 · 75 CROCKFORD BLVD
  • Zoning review26 228873 LPRClosed
    Aug 31, 2026 · 75 CROCKFORD BLVD
  • Minor varianceA0047/26SCApproved

    To construct a one storey rear addition to the existing one storey commercial vehicle service garage.

    Jun 3, 2026 · 75 CROCKFORD BLVD
  • Zoning review25 265681 ZAPNotice Sent
    Dec 12, 2025 · 75 CROCKFORD BLVD
  • Zoning review19 146807 LPRClosed
    Apr 30, 2019 · 75 CROCKFORD BLVD
  • Building permit15 119235Cancelled

    HVAC - Permit to construct 1-Storey rear addition to existing 1-Storey Vehicle Service Garage.

    Feb 19, 2015 · 75 CROCKFORD BLVD
  • Minor varianceA205/14SCWithdrawn

    The Committee of Adjustment approved a variance in January 2010 to allow vehicle service for a fleet of vehicles to be serviced on the site. In March 2012 the Committee of Adjustment approved a variance to provide vehicle service to area businesses and the general public. Now the applicant is seeking relief from the provisions of the Zoning By-law to construct a one storey rear addition for a car repair garage which will contain a a spray booth. The existing office, reception, mechanical and storage, and car service shop space will remain.

    Oct 2, 2014 · 75 CROCKFORD BLVD
Show 5 older records
  • Zoning review14 177855 ZZCClosed
    Jun 20, 2014 · 75 CROCKFORD BLVD
  • Building permit12 189651Closed

    installation of a 3/4" backflow preventer

    Jul 9, 2012 · 75 CROCKFORD BLVD
  • Minor varianceA026/12SCApproved

    To provide vehicle service to area businesses and the general public. The Committee of Adjustment approved a variance in January 2010 to allow vehicle services for a fleet of vehicles to be serviced on the site.

    Mar 22, 2012 · 75 CROCKFORD BLVD
  • Minor varianceA211/09SCApproved

    The owner is proposing to move an established taxi and limousine business to 75 Crockford Boulevard and to provide vehicle services as an ancillery use to allow a fleet of vehicles to be serviced on the site.

    Jan 27, 2010 · 75 CROCKFORD BLVD
  • Zoning review09 159305 ZPUClosed
    Aug 18, 2009 · 75 CROCKFORD BLVD

Lot facts

Area
1,455 m²
Frontage
18.4 m
Depth
78.9 m
Street
Crockford Blvd
Corner lot
No
Public lane
None
House footprint
270 m²roof up to 5.5 m
Back yard
41.6 mhouse to rear lot line
Side yards
4.5 m and 4.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
83%5 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a one storey rear addition to the existing one storey commercial vehicle service garage.

    75 CROCKFORD BLVD · Jun 3, 2026 · 15 m away
  • Minor varianceApproved

    To alter the existing building by adding a loading dock at the rear of the building for the marihuana production facility on site. The existing one-storey vehicle repair shop will remain unchanged.

    47 CROCKFORD BLVD · Mar 11, 2026 · 248 m away
  • Minor varianceApproved

    To alter the existing one-storey vehicle service shop by constructing one-storey partialside (north) and full rear yard additions.

    67 CROCKFORD BLVD · Jul 9, 2025 · 76 m away
  • Minor varianceApproved

    To permit recreation and eating establishment uses in Unit 4 of the existing one-and-one-half-storey building containing industrial uses. Also, to permit a reduction in the number of accessible parking spaces provided. NOTE: This application was previously deferred at the Committee of Adjustment hearing on November 13, 2024.

    1160 BIRCHMOUNT RD · Mar 12, 2025 · 371 m away
  • Minor varianceRefused

    To permit a marihuana production facility.

    47 CROCKFORD BLVD · Nov 15, 2023 · 248 m away

Latest activity nearby

  • Minor variancePending

    To permit interior renovations to allow for an eating establishment.

    98 CROCKFORD BLVD · Dec 2, 2026 · 279 m away
  • Zoning review

    Application On Hold

    61 CROCKFORD BLVD · Nov 2, 2026 · 132 m away
  • Zoning review

    Not Started

    75 CROCKFORD BLVD · Oct 28, 2026 · 15 m away
  • Minor variancePending

    Cancelled

    98 CROCKFORD BLVD · Sep 10, 2026 · 279 m away
  • Zoning review

    Closed

    75 CROCKFORD BLVD · Sep 3, 2026 · 15 m away
  • Zoning review

    Closed

    75 CROCKFORD BLVD · Aug 31, 2026 · 15 m away
  • Zoning review

    Cancelled

    90 CROCKFORD BLVD · Aug 5, 2026 · 195 m away
  • Building permit

    Proposal to replace existing RP backflow prevention device on domestic water service with DCVA device.

    107 CROCKFORD BLVD · Jun 26, 2026 · 289 m away
  • Minor varianceApproved

    To construct a one storey rear addition to the existing one storey commercial vehicle service garage.

    75 CROCKFORD BLVD · Jun 3, 2026 · 15 m away
  • Zoning review

    Closed

    98 CROCKFORD BLVD · Apr 10, 2026 · 279 m away

Neighbourhood: Wexford/Maryvale

About the area around the lot, not the lot itself.

Nearest station
Golden Mile Station25 min walk
Nearest TTC stop
Warden Ave at Castille Ave6 min walk
Nearest cycling route
Gatineau Hydro Corridor TrlMulti-Use Trail, 7 min walk
Nearest traffic count
15,830 vehicles in 8 hWarden Ave / Walbon Rd, 370 m away, Feb 27, 2018
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Wayne Parkette10 min walk
Wexford Hydro11 min walk
McGregor Park13 min walk

Schools within 1 km

  • DELTA ACADEMY INC SECONDARY SCHOOL Private 6 min walk
  • GEORGE PECK PUBLIC SCHOOL English Public 9 min walk
  • GENERAL CRERAR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWexford/MaryvaleMedian neighbourhood
Median household income (2020)$82,000$84,500
Households that own their home59%54%
Population (2021)28,34516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWexford/MaryvaleCity median
Assault1128.2636.3
Robbery125.769.5
Shootings32.210.5
Auto theft425.5192.6
Theft over $5,00083.846.1
Break and enter254.6172.8
Theft from vehicles441.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.