Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitNatural Heritage System (15% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 25 134729 (Soundstages 9-12 purpose-built sound stages and support spaces. (Basin Studios), 2025); 25 134728 (Soundstages 5-8 purpose-built sound stages and support spaces. (Basin Studios), 2025); 25 131910 (Soundstages 1-4 purpose-built sound stages and support spaces. (Basin Studios), 2025); and 1 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
8 records on file: more than at 98% of Toronto houses (median 0).
- Building permit25 134730Cancelled
Soundstages purpose-built sound stages and support spaces. (Basin Studios)
Mar 25, 2025 · 75 BASIN ST - Building permit25 134729Application On Hold
Soundstages 9-12 purpose-built sound stages and support spaces. (Basin Studios)
Mar 25, 2025 · 75 BASIN ST - Building permit25 134728Application On Hold
Soundstages 5-8 purpose-built sound stages and support spaces. (Basin Studios)
Mar 25, 2025 · 75 BASIN ST - Building permit25 131910Application Acceptable
Soundstages 1-4 purpose-built sound stages and support spaces. (Basin Studios)
Mar 20, 2025 · 75 BASIN ST - Zoning review23 123486 PSPClosedMar 21, 2023 · 75 BASIN ST
- Development application23 123486 STE 14 SANOAC Issued
Site Plan Approval for a film and television studio campus with 44,504 square metres of development with twelve sound stages, production offices, mill and support spaces, vehicular and bicycle parking in an above grade garage, and associated base camp and backlot facilities.
Mar 15, 2023 · 75 BASIN ST · City file - Zoning review20 167717 ZPRClosedJul 15, 2020 · 75 BASIN ST
- Zoning review82 026141 LTOClosedJun 7, 1982 · 75 BASIN ST
Check before you build
Site-specific exception 900.21.10(20)
Needs a closer look22 site-specific rules apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On 29, 35, 41, and 75 Basin Street, as shown zoned EL 2.5 (x20) on Diagram 2 of By-law 1010-2022, buildings or structures may be constructed, used or enlarged in compliance with Sections
- Rule B
to (V) below; (B) For the purposes of this exception, the lot is comprised of the lands identified as EL 2.5 (x20) on Diagram 2 of By-law 1010-2022
- Rule C
In accordance with Clause 5.10.30.20, the lot line abutting Basin Street is the front lot line
- Rule D
Despite Regulations 60.5.40.10(1) and (2), the height of a building or structure is the distance between Canadian Geodetic Datum of 76.85 metres and the elevation of the highest point of the building or structure
- Rule E
Despite Regulation 60.5.40.60(1), a canopy, awning or similar structure may encroach into a required minimum building setback that is not a street yard , regardless of how high it is above the elevation of the ground directly below it
- Rule F
In addition to the uses permitted in Regulation 60.10.20.10(1), the following uses are also permitted: (i) Art Gallery ; (ii) Club ; (iii) District Heating and Cooling Plant ; (iv) Library; (v) Massage Therapy ; (vi) Medical Office; (vii) Museum ; (viii) Personal Service Shop ; (ix) Recreation Use ; (x) Retail Service ; (xi) Software Development and Processing ; and (xii) Wellness Centre
- Rule G
Despite Regulations 60.10.20.10(1) and 60.10.20.20(1), the following uses are not permitted: (i) Crematorium ; (ii) Dry Cleaning or Laundry Plant; (iii) Open Storage ; (iv) Plastic Product Manufacturing Use ; and (v) Self-storage Warehouse
- Rule H
Despite the uses permitted in Regulations 60.10.20.10(1) and 60.10.20.20 (1), the following uses are also permitted if they comply with the specific conditions associated with each use: (i) Cabaret provided the interior floor area does not exceed 1,000 square metres; (ii) Contractor's Establishment provided a contractor's establishment must store loose materials such as sand, gravel or concrete in an enclosed building ; (iii) Eating Establishment provided the individual interior floor area does not exceed 3,500 square metres and must comply with the specific use regulations in Section 150.100; (iv) Entertainment Place of Assembly provided the individual interior floor area does not exceed 1,000 square metres; (v) Financial Institution provided this use is not within 20.0 metres of an intersection of two streets ; (vi) Nightclub provided the individual interior floor area does not exceed 1,000 square metres; (vii) Office provided this use shall include production office, general office, and executive production office areas that will not exceed a floor space index of 0.85 over the entire lot ; (viii) Outdoor Patio provided it is an ancillary use associated with a cabaret , eating establishment , entertainment place of assembly , nightclub , recreation use , and a take-out eating establishment ; (ix) Parking Garage provided it is in one or two parking garages and collectively will not contain more than 1.25 parking spaces per 100 square metres of provided gross floor area on the lot and be located in the within the area depicted on Diagram 5 of By-law 1010-2022; (x) Retail Store provided the individual interior floor area does not exceed 3,500 square metres; (xi) Take-out Eating Establishment provided the individual interior floor area does not exceed 3,500 square metres; (xii) Transportation Use despite Regulation 60.12.20.100 (19), this use is a permitted use if it is operated by, or on behalf of, the Toronto Transit Commission; (xiii) Warehouse despite Clause 60.10.20.10, this use is a permitted use if it is not used for the purpose of, or in association with, a postal or courier service; and (xiv) Wholesaling Use despite Clause 60.10.20.10, this use is a permitted use if it is not used for the purpose of, or in association with, a postal or courier service
- Rule I
For the purposes of this exception, Artist Studio , Custom Workshop , Entertainment Place of Assembly , Office, Performing Arts Studio , Production Studio , Software Development and Processing , and Warehouse shall be considered "studio-oriented use"
- Rule J
For the purposes of this exception, "base camp" means an ancillary activity to the "studio-oriented uses" that involve the temporary parking and storage of fleet, production, and studio operation vehicles and are not considered parking spaces for the purposes of Clauses (H)(ix) and (U) of this exception
- Rule K
Canopies, awnings, wind screens, snow screens, or similar structures over pedestrian entrances must be no less than 2.5 metres above the elevation of the ground directly below it. Canopies, awnings, or similar structures over production studio stage doorways must be no less than 6.1 metres above the elevation of the ground directly below it
- Rule L
Any pedestrian and utility service bridge structures must be located no less than 6.1 metres above the elevation of the ground directly below it
- Rule M
Any pedestrian and utility service bridge structures in (L) above must have no more than one storey and must not exceed a height of 5.5 metres, as measured floor to ceiling
- Rule N
On the lot with a "studio-oriented use", a barrier, such as a fence, gate, berm, retaining wall, or landscaped buffer may be provided for areas: (i) between a lot line that abuts a street and an area that is used for a "studio-oriented use", located a maximum of 3.0 metres from the lot line that abuts a street , except for the portions used for vehicle and pedestrian access; or (ii) along the entire perimeter of the portion of the lot that is used for a "studio-oriented use"; and (iii) along all lot lines that abut the ON (x24) zone
- Rule O
Despite Clause 60.5.40.10 and Regulation 60.10.40.10(1), the following structures and equipment may project beyond the permitted height of a building : (i) equipment used for the functional operation of the building including electrical, utility, mechanical and ventilation equipment, enclosed stairwells, roof access, maintenance equipment storage, elevator shafts and equipment, chimneys, and vents to a maximum of 2.5 metres; (ii) structures that enclose, screen or cover the equipment, structures and parts of a building listed in (i) above, inclusive of a mechanical penthouse, may project above the height limits to a maximum of 3.0 metres; (iii) architectural features, parapets, and elements and structures associated with a green roof may project above the height limits to a maximum of 2.0 metres; (iv) building maintenance units and window washing equipment may project above the height limits to a maximum of 2.5 metres; (v) planters, landscaping features, guard rails, and divider screens on a balcony and/or terrace may project above the height limits to a maximum of 2.0 metres; (vi) trellises, pergolas, and unenclosed structures providing safety or wind protection to rooftop amenity space may project above the height limits to a maximum of 2.5 metres; and (vii) architectural signage and associated structures may project above the height limits to a maximum of 5.0 metres
- Rule P
Despite Regulation 60.10.40.10(1) and Diagram 4 attached to this By-law, any buildings or structures may have a height limit of 46.0 metres on the lot, so long as the cumulative area to which this height limit applies does not exceed 15 percent of the lot area for the 42.0 metre height limit area as indicated on Diagram 4 attached to this By-law
- Rule Q
Despite Clause 60.10.40.10(1) and Diagram 4 attached to this By-law, the required minimum height of all main walls facing a lot line , with the exception of the former Sun Oil heritage building identified on Diagram 5 of By-law 1010-2022, is 10.0 metres
- Rule R
Despite Regulations 60.10.40.70(1), (2), and (3), on the lot abutting a street or a lot line abutting the ON (x24) zone, the required minimum front yard setback , minimum side yard setback , and minimum rear yard setback is 0.0 metres
- Rule S
Regulation 60.10.50.10(1), with regards to soft landscaping , does not apply to a lot line abutting a street
- Rule T
Despite Regulation 60.5.80.10(1) and (2), a parking space may not be located in the front yard , side yard abutting a street , or in a side yard or rear yard abutting the ON (x24) zone
- Rule U
Despite Regulation 200.5.10.1(1) and Table 200.5.10, for all permitted uses identified in Regulations 60.10.20.10(1) and 60.10.20.20(1) as amended by (F), (G), and (H) above, parking spaces may not exceed a maximum rate of 1.25 parking spaces per 100 square metres of gross floor area . No minimum parking spaces are required
- Rule V
Despite Regulation 230.5.10.1(1) and Table 230.5.10.1(1), for all permitted uses identified in Regulations 60.10.20.10(1) and 60.10.20.20 (1) as amended by (F), (G), and (H) above, bicycle parking spaces must be provided at a minimum rate of 0.25 bicycle parking spaces per 100 square metres of interior floor area , allocated as follows: (i) 10 percent "short-term" bicycle parking spaces ; and (ii) 90 percent "long-term" bicycle parking spaces .
Lot facts
- Area
- 16,655 m²
- Frontage
- 169.7 mestimated, irregular lot
- Depth
- 120.7 mestimated, irregular lot
- Street
- Basin St
- Corner lot
- No
- Public lane
- None
- House footprint
- 188 m²roof up to 6.5 m
- Back yard
- 88.9 mhouse to rear lot line
- Side yards
- 25.6 m and 124.6 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 42 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Zoning review
Notice Sent
495 COMMISSIONERS ST · Aug 10, 2026 · 146 m away - Building permit
Proposal for demolition and removal of the two basin portable structure
440 COMMISSIONERS ST · Jul 6, 2026 · 230 m away - Zoning review
Closed
440 COMMISSIONERS ST · Mar 31, 2026 · 230 m away - Building permit
Soundstages purpose-built sound stages and support spaces. (Basin Studios)
75 BASIN ST · Mar 25, 2025 · 47 m away - Building permit
Soundstages 9-12 purpose-built sound stages and support spaces. (Basin Studios)
75 BASIN ST · Mar 25, 2025 · 47 m away - Building permit
Soundstages 5-8 purpose-built sound stages and support spaces. (Basin Studios)
75 BASIN ST · Mar 25, 2025 · 47 m away - Building permit
Soundstages 1-4 purpose-built sound stages and support spaces. (Basin Studios)
75 BASIN ST · Mar 20, 2025 · 47 m away - Zoning review
Closed
75 BASIN ST · Dec 13, 2023 · 47 m away - Zoning review
Closed
495 COMMISSIONERS ST · Sep 6, 2023 · 146 m away - Development application
Site Plan Approval for a film and television studio campus with 44,504 square metres of development with twelve sound stages, production offices, mill and support spaces, vehicular and bicycle parking in an above grade garage, and associated base camp and backlot facilities.
75 BASIN ST · Mar 15, 2023 · 50 m away · City file
Neighbourhood: South Riverdale
About the area around the lot, not the lot itself.
- Nearest TTC stop
- Commissioners St at Carlaw Ave3 min walk
- Nearest cycling route
- Commissioners StCycle Track, 3 min walk
- Nearest traffic count
- 7,375 vehicles in 14 hCarlaw Ave / Commissioners St, 220 m away, Oct 6, 2026
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- McCleary Park6 min walk
- Cherry Beach Clarke Beach Park9 min walk
- Tommy Thompson Park9 min walk
2021 Census
| Figure | South Riverdale | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $100,000 | $84,500 |
| Households that own their home | 57% | 54% |
| Population (2021) | 27,815 | 16,813 |
| Homes built in 1960 or before | 52% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Riverdale | City median |
|---|---|---|
| Assault | 828.7 | 636.3 |
| Robbery | 69.3 | 69.5 |
| Shootings | 3.2 | 10.5 |
| Auto theft | 217.4 | 192.6 |
| Theft over $5,000 | 88.2 | 46.1 |
| Break and enter | 264.7 | 172.8 |
| Theft from vehicles | 349.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.