HousePrecheckCheck an address

75 Asterfield DrToronto · zoning, lot size and permit records

Open space · OR≈ 6.2 × 46.8 m107 m²on Plumrose Blvdcorner, also on Asterfield Dr

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 1 development application open within 300 m, up to 13 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N20 m
≈ 6.2 m frontage≈ 46.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
107 m²
Frontage
6.2 mestimated, irregular lot
Depth
46.8 mestimated, irregular lot
Street
Plumrose Blvd
Corner lot
Yes, also on Asterfield Dr46.8 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

Around this lot

Minor variances approved
100%12 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Application On Hold

    4674 KINGSTON RD · Nov 24, 2026 · 242 m away
  • Building permit

    Rev 01: Revision to permit. PROPOSED NEW ELEVATOR IN AN EXISTING TWO STOREY COMMERCIAL BUILDING

    4637 KINGSTON RD · Nov 16, 2026 · 199 m away
  • Building permit

    Proposed Fire alarm upgrades to existing 2-storey + basement shelter with reference to Section 11 of the OBC (the performance of the fire alarm system shall be at least equal to the performance level prior to this alteration). Fire alarm work only, no changes to other systems (partition, ceiling, HVAC, etc.) under this application.

    4680 KINGSTON RD · Nov 3, 2026 · 286 m away
  • Zoning review

    Not Started

    4679 KINGSTON RD · Oct 30, 2026 · 195 m away
  • Building permit

    Interior renovation to an existing vacant second floor unit and ground floor lobby

    4637 KINGSTON RD · Oct 30, 2026 · 199 m away
  • Building permit

    Interior renovation to an existing Pharmacy/Medical Office area and expand the pharmacy into a vacant adjacent unit that was previously a restaurant

    4637 KINGSTON RD · Oct 15, 2026 · 199 m away
  • Zoning review

    Closed

    4659 KINGSTON RD · Sep 22, 2026 · 54 m away
  • Building permitsecondary suite

    Propose remediation of the house to have a basement secondary dwelling unit per city's Order No.: 26 217227 COU 00VI

    15 WILDFLOWER WAY · Sep 15, 2026 · 290 m away
  • Building permit

    Upgrading the existing fire alarm system to an existing city shelter.Fire alarm and emergency lighting upgrades to existing 1-storey shelter with reference to Section 11 of the OBC (the performance of the fire alarm system shall be at least equal to the performance level prior to this alteration). Fire alarm and emergency lighting work only, no changes to other systems (partition, ceiling, HVAC, etc.) under this application.

    4674 KINGSTON RD · Sep 14, 2026 · 242 m away
  • Zoning review

    Application On Hold

    4650 KINGSTON RD · Jul 17, 2026 · 199 m away

Neighbourhood: West Hill

About the area around the lot, not the lot itself.

Nearest station
Guildwood GO Station46 min walk
Nearest TTC stop
Kingston Rd at Beechgrove Dr3 min walk
Nearest cycling route
Highland Creek TrlMulti-Use Trail - Entrance, 9 min walk
Nearest traffic count
566 vehicles in 14 hAsterfield Dr / Green Ash Ter, 210 m away, Aug 26, 2025
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Asterfield - Plumrose Blvd Parkette1 min walk
Megan Park1 min walk
Highland Creek Sports Pad2 min walk

Schools within 1 km

  • ST MALACHY CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
  • JOSEPH BRANT SR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWest HillMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home59%54%
Population (2021)28,14016,813
Homes built in 1960 or before21%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWest HillCity median
Assault1328.2636.3
Robbery98.369.5
Homicide6.35.3
Shootings15.810.5
Auto theft149192.6
Theft over $5,00063.446.1
Break and enter193.4172.8
Theft from vehicles389.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.